Forwards Insp Rept 50-461/97-06 on 970215-0329 & Notice of Violation.First Violation Involves Seven Examples of Procedural non-compliance in Documenting Mods to One Outboard Feedwater Containment Isolation Check Valve
ML20141K469
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/16/1997
From: Caldwell J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Connell W
ILLINOIS POWER CO.
Shared Package
ML20141K472 List:
References
50-461-97-06, 50-461-97-6, EA-97-412, NUDOCS 9705290164
Download: ML20141K469 (4)


See also: IR 05000461/1997006

Text

{{#Wiki_filter:-. .- -- - . - - .~ -. _ __ p *" % g UNITEo STATES ' t gq )3( p NUCLEAR REGULATORY COMMISSION q g REGION lit E [[ 801 WARRENVILLE ROAD y4f LISLE, ILLINOIS 60532-4351

      • .+

May 16, 1997 EA - 412 j i Mr. Wilfred Connell, Vice President Clinton Power Station - lilinois Power Company . Mail Code V-275 { P. O. Box 678 Clinton, IL 61727 ] SUBJECT: NRC INSPECTION REPORT NO. 50-461/97006 (DRP) Dear Mr.-Connell: On April 5,1997, the NRC completed an inspection at your Clinton Facility. The enclosed report presents the results of that inspection. Procedure adequacy and adherence continued to be inconsistent during this inspection period. While many observed activities were accomplished in an acceptable manner, other activities were impacted by inadequate procedures or procedural adherence issues. We recognize that near the end of this period your staff implemented a revised procedure adherence policy document; however, we continue to be concerned by the length of time that it took to develop the revised policy and the amount of NRC involvement required to identify the need for a revised policy. In addition to the issues identified in this report, a special inspection was conducted during this period to review the circumstances associated with the March 9,1997 containment isolation automatic actuation surveillance. That inspection's results will be documented in a separate report. This report documents six violations of NRC requirements. The first violation involves seven examples of procedural non-compliance in documenting the modifications to one outboard Feedwater containment isolation check valve (FW-032A). This violation is of concern because of the lack of rigor demonstrated by your Maintenance staff in maintaining procedural compliance during this high priority, high visibility project. Feedwater check valve FW-032A had never passed an as-found surveillance test, and this modification was a commitment covered by our January 9,1997 Confirmatory Action Letter. The next three violations deal with an inadequate surveillance procedure for reactor pressure vessel (RPV) leak testing, an inadequate surveillance procedure for containment ventilation effluent treatment testing, and an inadequate maintenance procedure for freeze sealinstallation. These violations arn of concern because they represent additional examples of a well documented problem eraa. We are also concerned that identification of the procedure adequacy problems for the RPV leak test and the containment ventilation test required NRC involvement. The fifth violation deals with the I 9705290164 970516 PDR ADOCK 05000461 G PDR -

. _ _ . _ _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . . . _ . _ _ . _ _ _ . - - _ . . . _ _ _ - . . _ . _ _ . . W. Connell -2- failure to maintain the seismic design attributes of the main control room. The sixth violation involves four examples of inadequate procedures. The fifth and sixth violations were described in detail in inspection Report 50-461/96011. These violations are cited in the enclosed Notice of Violation, and the circumstances surrounding the first four violations are described in detail in the enclosed report. Please note that you are required to respond to this letter and should follow the instructions . specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement actions are necessary to ensure compliance with regulatory requirements. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter ' and its enclosures will be placed in the NRC Public Document Room (PDR), Sincerely, . " . - mes L. Caldwel eputy Regional Administrator Docket No.: 50-461 License Nos: NPF-62 Enclosures: ' , l 1. Inspection Report No. 5-461/97006(DRP) l 2. Notice of Violation cc w/ encl: W. D. Romberg, Assistant Vice President P. Yocum, Plant Manager Clinton Power Station ' R. Phares, Manager-Nuclear Assessment J. Sipek, Director - Licensing Nathan Schloss, Economist Office of the Attorney General , G. Stramback, Regulatory Licensing Services Project Manager General Electric Company Chairman, DeWitt County Board

State Liaison Officer j Chairman, Illinois Commerce Commission

,. - . .. . - . . - -

- _ - . . . . - . . . - . . . - . - . . . . . - - . . . . . .. . - . - . - - . . - - - . . .- W. Connell -2- failure to maintain the seismic design attributes of the main control room. The sixth violation involves four examples of inadequate procedures. The fifth and sixth violations were described in detail in inspection Report 50-461/96011. These violations are cited in the enclosed Notice of Violation, and the circumstances surrounding the first four violations are described in detail in the enclosed report. Please note that you are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. The NRC will use your response, in part, to determine whether further enforcement actions are necessary to ensure compliance with regulatory requirements. in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room (PDR). Sincerely, 1 /s/ James L. Caldwell James L. Caldwell Deputy Regional Administrator Docket No.: 50-461 License Nos: NPF-62 Enclosures: , 1. Inspection Report No. 5-461/97006(DRP) 2. Notice of Violation i cc w/ encl: W. D. Romberg, Assistant Vice President P Yocum, Plant Manager Clinton Power Station R. Phares, Manager-Nuclear Assessment J. Sipek, Director - Licensing Nathan Schloss, Economist Office of the Attomey General (See attached continued distribution) DOCUMENT: r:\\lNSPRPTS\\ POWERS \\ CLIN \\CLl97006.DRP . To receive a copy of this document, indicate in the box "C" = Copy without attach /enci ! "E" = Copy with attach /enci "N" = No copy i OFFICE @l, / Alli { NAME M dp Qhell f 05/f/97 05/h97 DATE ' OFFICIAL RECORD COPY lff!.!!,..s . _,

.. .. . _ - - - . - . - . - ~ . . . . - - -.. - . . - . ~ . .- . . . . . . - - . . . . - . . . - . . - - . . . . . . . i i W. Connell -3- l (Distribution continued) cc w/ encl: G. Strambeck, Regulatory Licensing Services Project Manager General Electric Company Chairman, DeWitt County Board -) State Liaison Officer Chairman, Illinois Commerce Commission ,

Docket File w/enci DRP w/enci OC/LFDCB w/enct PUBLIC IE-01 w/ encl SRI Clinton, Dresden, Rlli PRR w/ encl LaSalle, Quad Cities CAA1 w/enci(E-mail) Project Manager, NRR w/enci A. B. Beach, w/ encl Rlli Enf. Coordinator, w/ encl Deputy RA, w/enci TSS w/ encl DRS (2) w/enci , ' J. LieM = n, OE J. Goldberg, OGC R. Zimnerman, NRR ' , ! ! \\ \\ 200034 . }}