Discusses 851210 Audit W/Energy Technology Engineering Ctr Re Computer Program Used by Tera to Track Technical Issues Involved in Comanche Peak Review Team Design Adequacy Program.Civil/Structural Discipline Deviations Listed
ML20141K448
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/18/1985
From: Terao D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Norkin D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8601220528
Download: ML20141K448 (1)


Text

-

hesiyh5 MiyIul g*"8%

UMTED STATES g

  • g NUCLEAR REGULATORY COMMisslON g

WASHINGTON, D.C. 20665 DEC 1 B 1985 Docket Nos: 50-445/50-446 MEMORANDUM FOR: Donald Norkin Team Leader DAP Evaluation Team IE FROM:

David Terao DAP Evaluation Team. IE

SUBJECT:

AUDIT OF CPRT ISSUES TRACKING SYSTEM y

On December 10, 1985, the NRC staff (D. Terao) and consultant (P. Chen ETEC) audited the computer program used by TERA to track the technical issues e

involved in the CPRT Design Adequacy Program. At the audit, the Issues Record category was not functioning properly and the issues could only be tracked throughtheDiscrepancy/IssueResolution(DIR)Reportcategory. At this time there were no items inputted into the Corrective Action List; there were no deficiencies listed in any discipline; and, there were no discrepancies, observations, nor deviations in the piping discipline. As previously noted, all issues identified are considered open.

}

The staff found only two deviations identified and both were in the

{

civil / structural di.scipline. The two deviations were:

(1) Steam Generator Upper Lateral Restraint Connections (D-0003), and L

(2) BuildingAirGapDimension(D-0004).

The staff audited the option in the computer program'which can identify the Issue Number by submitted a keyword. For example, the use of keyword "A307" resulted in a display of issue numbers E-0324. E-0369, and E-0372. Several keywords were audited by the staff and the issue numbers displayed indicated i

that the issues identification effort was being perfonned thoroughly. The

[

staff noted that the keyword "FUB-II" did not result in any issue numbers. The

[

reason being that "FUB-II" was incorrectly inputted into the computer as "FVB II "

David Terao DAP Evaluation Team, IE cc: