Informs That Wolf Creek Evaluated Ameron Response to Findings Identified During Audit Conducted on 970122-23 & 970128-31.Evaluation Found Responses to Findings Ron 01/97-001-011 Conditionally AcceptedML20141K404 |
Person / Time |
---|
Site: |
Wolf Creek |
---|
Issue date: |
03/28/1997 |
---|
From: |
Krause T WOLF CREEK NUCLEAR OPERATING CORP. |
---|
To: |
Lamb M AMERON |
---|
References |
---|
QS-97-0016, QS-97-16, NUDOCS 9705290076 |
Download: ML20141K404 (17) |
|
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20141K4131997-05-20020 May 1997 Submits Evaluation of Ameron Corrective Action Status Rept to Wolf Creek Supplier Quality Audit Findings ML20141K4041997-03-28028 March 1997 Informs That Wolf Creek Evaluated Ameron Response to Findings Identified During Audit Conducted on 970122-23 & 970128-31.Evaluation Found Responses to Findings Ron 01/97-001-011 Conditionally Accepted ML20141K6441997-02-27027 February 1997 Forwards WCNOC Supplier Quality Rept of NUPIC Joint Audit Performed by Wcnoc,Union Electric & TVA of Brea,California Facility on 970122-23 & Little Rock,Ar Facility on 970128-31 ML20081D5081995-03-0101 March 1995 Forwards Analysis Summary Rept Re RCS Drain Down Event,Rept Summarizes Analyses to Determine RCS & ECCS Conditions During Actual Event ML20077K4511991-07-25025 July 1991 Forwards Chapter 14 to Updated Sar,Initial Startup Rept, Documents in Response to Item 4,operating License for Facility & Milestone Schedule,Per NRC ML20072P0161983-07-13013 July 1983 Informs That No Changes to Emergency Plan Adopted Since Nov 1982 Rev,In Response to .Certificate of Svc Encl ML20076L5781983-07-11011 July 1983 Discusses Status of 830406 Proposed Stipulation of Contentions.No Agreement Reached Amongst Counsel at 830427 Conference Call.Fema Cannot Commit Resources to Preparing Testimony for 830830 Prefiling ML20076L6011983-07-11011 July 1983 Discusses Status of 830406 Proposed Stipulation of Contentions.No Agreement Reached Amongst Counsel at 830427 Conference Call.Fema Cannot Commit Resources to Preparing Testimony for 830830 Prefiling ML20083P3761983-01-13013 January 1983 Advises of Establishment of Task Force to Oversee Completion of Bm,Ef & Eg Sys,Preparation & Completion of Associated Quality Documentation & Review of Documentation.Task Force Will Commence on 830120 & Be Chartered for 30 Days ML20010J5791981-09-29029 September 1981 Forwards Applicant Further Response to Financial Qualifications Discovery Requests of Intervenor Kansans for Sensible Energy.Related Correspondence ML20010D1901981-08-17017 August 1981 Ack Receipt of 810813 Ltr Requesting Rescheduling of Osann Deposition.Lists Available Dates for Rescheduling.Related Correspondence ML19352A9501981-05-29029 May 1981 Comments on Revision 1 to Environ Rept for Facility,Per 810506 Request.Lists Species Present in Proposed Project Area.Nrc Should Evaluate Possible Effects of Const on Listed Endangered Species ML20005B3311981-05-29029 May 1981 Informs That 810529 Ltr Forwarding Constituent 810320 Comments on Proposed Rule 10CFR2 Allowing Interim Licensing of Nuclear Reactors Before Safety Procedure Completion Has Been Sent to NRC ML19350E2901981-05-29029 May 1981 Ack Receipt of Constituent Ltr.Subj of Ltr Does Not Fall within DOE Purview & Will Be Forwarded to NRC ML19347F4221981-05-14014 May 1981 Advises That Proposed Action Re Revision 1 to Environ Rept Does Not Affect Ongoing or Planned Water & Power Projects ML19350E3031981-03-20020 March 1981 Requests Congressional Assistance to Require NRC to Expedite Licensing of Nuclear Power Plants.Facility Fuel Load Delays Discussed.Aif Ltr Dtd 810217 Forwarded ML19270G1781979-04-27027 April 1979 Supports Nationwide Halt to Nuclear Plant Const.Cites Wolf Creek Controversy as Example ML20027A4981978-11-30030 November 1978 Presents Results of Review of Low Strength Values for Facility Base Mat 90-day Concrete Cylinders.Base Mat Concrete Meets Spec Requirements & All Matls Used in Mix Are Acceptable ML20027A5001978-04-19019 April 1978 Forwards Dh Campbell & Lm Meyer Repts W/Results of Petrographic Examination,Compressive Strengths & Chem Analysis of Concrete Cylinders & Other Samples.Basemat Concrete Probably Exceeds 5000 Psi Strength Requirement 1997-05-20
[Table view] |
Text
_ - -.
67)' b a
W@ NUCLEAR OPERATING r
iF . CREEK March 28,1997 l
QS 97-0016 Ameron Protective Coating Group i1605 Vimy Ridge Road P.O. Box 192610 Little Rock, AR 72219 2610 Attention: Mr. Michael Lamb, Quality Assurance Manager
Subject:
Evaluation of Ameron Response to WCNOC/ Supplier Quality Audit Findings
Reference:
WCNOC Audit Report- A350-K002 Ameron Response - letter dated 2/27/97
Dear Mr. Lamb:
Wolf Creek Nuclear Operating Corporation / Supplier Quality has evaluated the Ameron response to the findings identified during the audit conducted 1/22-23/97 and 1/28-31/97.
The evaluation found that responses to findings RON 01/97-001 through 01/97-011 are conditionally accepted, with additional responses required for RON's 01/97-009 and 010 by 5/1/97. Below is a status of the findings and the ,
required action to be taken by Ameron.
RON NUMBER FINDING STATUS ACTION REQUIRED 01/97-001 Open Corrective action status update due $/1/97 01/97-002 Open Corrective action status update due 5/1/97 j 01/97-003 Open Corrective action status update due 5/1/97 l
01/97-004 Open Corrective action status update due 5/1/97 01/97-005 Open Corrective action status update due 5/1/97 01/97 006 Open Corrective action status update due 5/1/97 gggi, esa l
01/97-007 Open Corrective action status update due 5/1/97 Eis".
em 01/97-008 Open Additional response required by 5/1/97 to address whether W1041 " Purchase Orders will include the requirement to
!=iE, E
i l impose the calibration suppliers quality program and MIL STD 45662A or ANSI Z510 in Ameron purchase orders to g, calibration suppliers. g,
==
01/97-009 Open Additional response required by 5/1/97 to address the i
frequency of audits. Also as stated in the original audit report, audits of Brookfield and Fluid Power must be conducted within six months our audit exit meeting.
Open Corrective action status update due 5/1/97 01/97-010_
Open Corrective action status update due 5/1/97 g 01/9311 I hh P. O. Box di t / Burhngton. KS 66839 / Pnone:(316) 364-8831
'a Equal Opportunity Employer M/F/HCNET 9705290076 970328 PDR ADOCK 05000482 (: .ggfd lP PDR
_ _ _ _ _ . m . . _ ..._ __ ._____-.m. _ . . _ _ . _ _ . . _ _ . _ _ _ . _ _ . . _ _ _ _ _ _ . _ - . _ . _ . . . - _ . _ .
QS 97-0016 As noted in the above table, a corrective action status update for all findings is due on 5/1/97. The updates are important to ensure that corrective action due dates are being met and implemented as required.
Should you have any questions about the evaluation, please contact me at (316)364-4156 or Mr. Vic Canales, Supervisor Supplier / Materials Quality at (316) 364 4214.
Sincerely,
[ s T:-'
Terry L. Krause Supplier Quality Specialist Ill
Attachment:
Ameron Response cc: V. J. Canales (AE SQ), w/o - NPRDS A350 File ,
J. D. Kitchens (AE PUR), w/o NUPIC Membership, w/a l W. B. Norton (CC-PIA), w/o N. S. Hawkins - NSRC (CC-PIA), w/o j D. G. Long (AE ME), w/o Vault (CC-DS), w/a i R. L. Traudt (CC DES), w/a Document Services (CC-DS), w/o l l
l l
l l
1 t
I l 1 i
l r
l
=
February 27,1997 A
AMERON IN T E R N ATIO N A t, PaoTECTwa COAT 1Nos Gnour 1160s Vimy Ridge Rrad I.ittle Rock. Arkansas 72209 eg ause RO. Box 192610 Wolf Creek Nuclear Operating Corp uttle Pock. Arkansas 72219 2610 PO Box 411 Telephone: sols 4ss.4500 Burlington, Kansas 66839 Fax:50lI455 3061 Intemet: www.ameron. net.com E mail: wstoane@aol.com Terry:
Please find attached the Ameron International Protective Coatings Group response to the Noncompliance Reports initiated during your recent NUPIC audit ofour facilities. Please note that each Corrective Action has been assigned to a responsible manager and that each action has also been assigned a Target Completion date. A few of the Corrective Actions have already been implemented. However, several of the Corrective Actions will require some changes to the computer system and will not be implemented until the new, S2K computer system is up and running. This explains the lengthy time lines that have been defined for some of the Corrective Actioru.
If you have any questions or comments regarding the proposed Corrective Actions, please contact me immediately. Otherwise I will get in touch with you over the next couple of weeks.
Sincerely,
?.A.b, -
t licheal Lamb Quality Manager i
ec. K. Kolinek, J. Garnett, G. Smith, S. McKown, R. Gasmena, C. Stanley, H. Kline, S. Bosan, A. Warren, M. Jones du ..itI wpi, M. larnb,2/27/97, wrmon 1 t
l
Page 1 RON NO: N/A RESPONSIBLE MANAGER: J. Garnett AUDITOR RECOMMENDATIONS AND CONCERNS
- 1) When raw materials are transferred from the original vendor bag into paper bags during the weigh out process, the auditors observed that several raw materials were transferred to unmarked bags and then the multiple unmarked bags were marked with the raw material codes. The auditors suggest that the bags should be marked prior to the transfer of raw materials to the bag to eliminate the possibility of a mix up later. This suggestion needs to be reflected in practice and procedure.
Target Comoletion Date: 4/30/97 l 2) Partial, open bags of raw materials are exposed to changes in l humidity accumulation and potential contamination. Ameron needs to address this problem with a corrective action. Potential corrective actions would include taping bags closed or putting the opened bags into plastic boxes that can be sealed closed.
Target Comoletion Date: 7131197
\
i l
I
Page 2 l
RON NO: 01/97-001 RESPONSIBLE MANAGER (S): H. Kline, S. Bosan
- 1) Ameron needs to make sure that the " Certified Product Alert Notice" show up on the computer system for all of the " Nuclear products" Target Comoletion Date: 6/30/97 I
i l l
- 2) A " sign-off" procedure needs to be instituted where the " authorized" approval of changes to Nuclear formulas includes a signature to a statement indicating that the current revised version of the formula has been reviewed and the indicated changes to the formula will not affect the essential characteristics / properties of the formula as it l
had been previously qualified for Nuclear applications. Sianature Qale Target Comoletion Date: 7/31/97
- 3) More inclusive documentation i.e.. test results cross referenced and indicated on the formula version history, as well as, some text explanation of the technical justification for the formula version l change. Not just and indication of the change that is being made but also some information as to why thct change is being made.
Target Comoletion Date: 7/31/97
- 4) 3366 and 3367 require back-tracking to make up the product definition / documentation of the product criteria on a Product j
Change Order or Development Criteria sheet.
Target Completion Date: 7/31/97 i .
l:
f:
Page 3 -
l ON NO: 01/97-001 Continued
- 5) The Auditors suggested setting up " master" Nuclear product files for l
each product so "all" the information pertaining to that product could i be more easily accessed during future NUPIC audits. I l
1 Target Completion Date: 6/30/97 1
I l 6) Review the following Work Instructions applicability and current
} application and revise accordingly-a) W1012 b) Wl015 c) Wl019 l d) W1020 l
! Taraet Completion Date:
6/30/97 l
l l l 1
l
. I l
l I
l 1
i l
l l l
i l
. .-. --. - . = , - .- -- - . - -
j Page 4 i RON NO: 01/97-002 RESPONSIBLE MANAGER (S): R. Gasmena, J. Garnett j S.McKown
- 1) Generate list of Critical / Non-critical raw materials used in Nuclear i batches. RG Target Comoletion Date: 2/25/97 Completed l l
l
- 2) Establish procedure and responsibility to review this list for l l completeness and correctness on a periodic basis and when new,
! Nuclear grade formulas are added to the production mix. RG Target Comoletion Date: 6/30/97 l
l c l
l
- 3) Determine in-coming raw material acceptance criteria for critical and ,
l non-critical raw materials: RG. !
l i
a) Critical raw materials,100% lot tested by Ameron QC Taraet Comoletion Date: 2/25/97 Implemented b) Non-critical raw materials accepted by Certificate of Analysis from Vendor l
l Taraet Comoletion Date: 9/30/97 l
i 4
1
l Page 5 j l
1 l
ON NO: 01/97-002 Continued
- 4) Establish methodology for transferring " acceptance" requirements to a) Vendor's. (Utilize PO's to identify requirements for specific raw materials to the vendors.) SM Target Comoletion Date: 7/31/97 b) Ameron's in-coming Raw Material Receiving Personnel JG Taraet Comoletion Date: 7/31/97 l
I l
l j
Page 6 l l
l l
l RON NO: 01/97-003 RESPONSIBLE MANAGER (S): M. Lamb
- 1) Revise Section 1.0 of the Ameron Quality Manual to reflect the current Ameron International organizational status in text and charts. l l
l Taroet Comoletion Date: 5/15/97 l
I i
t :
! Page 7 l
l l
l l
RON NO: 01/97-004 RESPONSIBLE MANAGER (S): R. Gasmena, M. Lamb
- 1) Contact B. Wilson to obtain a copy of his Lead Auditor Certification l for historical file records. RG Target Comoletion Date: 5/15/97 1
- 2) Probams with Certificate of Compliance: ML a) Ameron Order # 570680 for Wolf Creek needs to have Certs generated. )
Target Comoletion Date: 3/31/97 b) C1eck other Nuclear Record hies for completeness of paper work. j Taract Comoletion Date: 5/15/97 l
l l
l
- 3) Calibration System needs to be brought up to date. Data sheets need to reflect As Found, As Adjusted, Date Checked and By Whom.
ML 1
Target Comoletion Date: 4/30/97 l
I i
l i
i l
- . l Page 8 l
RON NO: 01/97-005 RESPONSIBLE MANAGER (S): M. Lamb
- 1) Revise Work Instruction Wl005 for a) Periodic intemal audits b) Periodic Management reviews Target Completion Date: 5/15/97
- 2) Management Reviews need to be documented better and evidence
. needs to be filed so that it is more accessible. Establish practice.
l l
Taraet Completion Date: 7/31/97 i
j
)
Page 9 l
RON NO: 01/97-006 RESPONSIBLE MANAGER (S): M. Lamb
- 1) Implement the following Work Instructions:
a) W1094 Customer Interface i
Target Comoletion Date: 6/15/97 1 I
l b) W1099 Contract Review Taroet Comoletion Date: 6/15/97 i l c) Wl158 ? Nuclear Orders Target Comotetion Date: 7/15/97 d) Wl098 Auditor Qualifications Target Comoletion Date: 7/15/97 1
1 4
Page 10 I
RON NO: 01/97-007 RESPONSIBLE MANAGER (S): G. Smith, M. Lamb
- 1) Review W1099 and Wl094 for accuracy, completeness and current application. GS l Target Comoletion Date: 5/15/97 I
- 2) Develop method / procedure where all of the requirements of new, Nuclear orders are reviewed prior to acceptance of the initial PO. GS Target Comoletion Date: 5/15/97
- 3) Develop method / procedure where "all" Nuclear PO requirements are related to all of the personnel involved in the entire Nuclear production process from Raw Material procurement through Product Shipment. GS Target Comoletion Date: 6/30/97 l
i i
i l Page 11 1
1 RON NO: 01/97-008 RESPONSIBLE MANAGER (S): M. Lamb, S. McKown ;
l
- 1) Revise W1041 to reflect current practice. ML 1
- Target Completion Date
- 6/15/97
- 2) Implement procedure where our Quality System requirements are listed as part of the Ameron PO for calibration services. SM l l
l Target Comoletion Date: 4/30/97 l l
i
Page 12 RON NO: 01/97-009 RESPONSIBLE MANAGER (S): M. Lamb
- 1) Revise Wl004 to reflect current practice.
a) Indicate that Ameron will conduct audits of suppliers and / or do incoming calibration check to verify calibration services' I work.
]
b) Establish an Audit Schedule for Calibration Services.
Taraet Comoletion Date: 6/15/97
- 2) Set up master file for all calibration services used.
Taraet Comoletion Date: 5/15/97 l
l i
4
+
l ,
l Page 13 l
I 1
l l RON NO: 01/97-010 RESPONSIBLE MANAGER (S): R. Gasmena
- 1) Establish method / procedure to inform Raw Material Receiving l personnel of the individual raw material receiving requirements.
Ig.rget Comoletion Date: 9/30/97
- 2) Review Raw Material Procurement Sheet requirements for critical /
non-critical Raw Materials for Nuclear products.
Target Completion Date.; 9/30/97
- 3) Set up method / procedure to require identification of QC personnel conducting individual tests and M & TE used on individual tests during QC Raw material Testing. These records need to allow traceability to training records and M & TE calibration records for Nuclear " critical" raw materials.
Taraet Comoletion Date: 8/31/97
Page 14 l
RON NO: 01/97-011 RESPONSIBLE MANAGER (S): M. Lamb l
- 1) Calibrate M & TE that is due for calibration / remove from service.
Target Completion Date: 4/30/97 l
l
- 2) Document Calibration on SN0002 Scale and SNC11 Wt/ gal cup.
Taraet Completion Date: 2/19/97 Completed 1
- 3) Deiine calibration procedures which are needed. Write and implement these Work Instructions as required.
Target Comoietion Date: 10/15/97 1
1 l 4) Write and implement Work Instructions for Receiving personnel i indicating that nev', in-coming M & TE and retuming M & TE which has been sent out for calibration must first be routed through QA for verification and entry into the calibration system and then forwarded to the department that has purchased the equipment.
Inget Completion Date: 10/15/97 l
doc. nupici wpd, M Lamb,2/27/97. Version 3.