Text
4
/
o UNITED STATES 8
g g
NUCLEAR REGULATORY COMMISSION g
E WASHINGTON, D. C. 20555 o
i
%,..... /
JAN 171986 Docket No. 50-29
~
MEMORANDUM FOR: Sholly Coordinator Division of PWR Licensing-A FROM:
George E. Lear, Director PWR Project Directorate #1, PWR-A
SUBJECT:
RE0 VEST FOR PUBLICATION IN BIWEEKLY FR NOTICE - NOTICE OF CONSIDERATION OF ISSilANct UF AMENDMENT TO FACILITY OPERATING LICENSE AND PROPOSED N0 SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION AND OPPORTUNITY FUK HEARING (TAC 60473)
Yankee Atomic Electric Company, Docket No. 50-29, Yankee Nuclear Power Station, Franklin County, Massachusetts Date of amendment reouest: January 6, 1986 Description or amendment request: The proposed change would modify the Technical Specifications (TS) to allow submission of a supplement to the January 1 semiannual radioactive effluent release report. The supplement would contain the dose anc meteorological summary report, and would be required within 150 days of January I each year.
Basis for proposed no significant hazards consideration determination: The Comission has provided guidance concerning the application of standards for making a no significant hazards consideration detennination by providing certain examples (April 6, 198.$, 48 FR 14870). Example (i) of actions involving no significant hazards consideration involves a change that constitutes a purely administrative change to the TS; for example, a i
change to achieve consistency throughout the IS, correction of an error, or hD P
.o
,a Sholly Coordinator JAN 17 m i
a change in nemenclature. The administrative controls section of the current TS requires the submission of the radioactive effluent release report within 60 days after January 1 and July 1 each year. The January 1 report currently is required to include a summary of the previous year's hourly meteorological data, and an assessment of radiation doses from radioactive liquids and gases. The proposed cnange would allow an additional 90 days (total of 150 days) after January 1 to provide the nourly neteorlogical data and dose assessment.
Ihis proposed change does not modify the information to be submitted, only the date of submission.
Inis proposed change constitutes an administrative change to the TS.
t!ased on this discussion, the staff proposed to determine that the I
requested action could not involve a significant hazards consideration.
Local Public Document Room location: Greenfield Comunity College,1 College Drive, Greenfield, Massachusetts 01301.
Attorney for licensee: Thomas Dignan, Esquire, Ropes and Gray, 225 Franklin Street, Boston, Massachusetts 02110.
NRC Project Director: George E. Lear.
i George E. Lear, Director j
PWR Project Directorate #1 Division of PWR Licensing-A LD D/ PAD # :PWR-A PM/pD*1 Office:
LA/ PAD #1 Surname: PShuttleW ff Glea Date:
1/ /~/ /86 1/l}/86
/
86 1/s7/86
.~
1
., o JAN 171986 3-i Distribution Copies:
Docket File 50-244 l
NRC PDR Local PDR PAD #1 r/f 1
TNovak, Actg. Dir.
JScinto w/ incoming i
Glear CRossi Glainas DCrutchfield PShuttleworth I
CMiller OELD LHamon OPA ACRS (10)
Yankee-Rowe tile 1
e r
i l
l 1
l l
i i
i I
(
_ _ _ =. _ _..
r-7 JAN 171986 Distribution Copies:
' Docket File'50-244 NRC PDR Local PDR PAD #1 r/f TNovak, Actg. Dir.
JScinto w/ incoming GLear CRossi Glainas DCrutchfield PShuttleworth Chiller OELD LHarmon UPA ACRS (10)
Yankee-Rowe file i