ML20141K295

From kanterella
Jump to navigation Jump to search
Informs That Next Rev to Westinghouse Ssar Be Submitted Under Oath & Affirmation to Comply W/Regulations in 10CFR52. to Correct Problem for Past,Revisions to Ssar Not Submitted Under Oath & Affirmation,Submitted Actions Required
ML20141K295
Person / Time
Site: 05200003
Issue date: 05/21/1997
From: Quay T
NRC (Affiliation Not Assigned)
To: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 9705280432
Download: ML20141K295 (3)


Text

_ _ _ . _ _ . _ - -

Dcrtd MC.

je' # %g i

y* -t g

g

,j

~t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30056-0001

%..... May 21, 1997 Mr. Nicholas'J. Liparulo, Manager Nuclear Safety and Regulatory Analysis hpOI Nuclear and Advanced Technology Division Westinghouse Electric Corporation P.O. Box 355 Pittsburgh, PA 15230 ,

SUBJECT:

SUBMITTAL OF THE AP600 APPLICATION UNDER OATH OR AFFIRMATION

Dear Mr. Liparulo:

It has come to the attention of my staff that revisions to the standard safety {

analysis report (SSAR) for the AP600 have not been submitted under oath or affirmation. This practice does not comply with the regulations.in 10 CFR Part 52. Specifically, 10 CFR 52.45(d) states in part that the applicant for a standard design under Subpart B

...must comply with the filing requirements of 10 CFR 50.30(a)

(1)-(4), and (6) and 50.30(b) as they would apply to an applica-tion for a nuclear power plant construction permit...." (emphasis added).

10 CFR 50.30(b) states the following:

"Each application for a license, including whenever appropriate a construction permit, or amendment of it, and each amendment of each application must be executed in a signed original by the applicant or duly authorized officer thereof under oath or affir-nation" (emphasis added).

Therefore, it is required that the next revision to the Westinghouse SSAR be submitted under oath and affirmation. In order to correct the problem for past revisions to the SSAR that were not submitted under oath and affirmation, Westinghouse is required to take the following actions.

(1) In the next revision to the SSAR Westinghouse will provide a statement under oath or affirmation that all previous revisions that are in effect (based on the List of Effective Pages) are true and correct.

(2) The process described above will also have to be implemented for the Probabilistic Risk Assessment and the Certified Design Material for the I AP600 because these documents were also not submitted under oath or affirmation.

y2)i h (3) All future material that Westinghouse submits for the AP600 for staff review must be submitted under oath and affirmation.

26033

,7032.o 22 970s21 DR ADOCK 0520 3 tiRC @ gg gsCOPY j

l

l Mr. Nicholas J. Liparulo May 21, 1997 If you have any-questions regarding this matter, you can contact Jerry Wilson at (301) 415-3145. Failure to comply with this request could cause a delay in the review schedule for the AP600.

Sincerely, 1

original signed by: j Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No.52-003 l cc: See next page DISTRIBUTION:

l Docket File PDST R/F MSlosson PUBLIC SWeiss TQuay TKenyon BHuffman JSebrosky DJackson JMoore, 0-15 818 WDean, 0-17 G21 ACRS (11)

I DOCUMENT NAME: A:0ATH.PST

r. ca. . ..,y . iw. m . i.ac . i. u,. w : c . co,, iihoui .et.ch nti.ncio.or. . copy with .et. chm.nt/.nclosur. "N" . No copy 0FFICE PM:PDST:DRPM l PDST:DRPM . 0GC D:PDST:DRPM l l NAME JMSebrosky 4A) JWilso Q ll) t h evt&' TRQuay'024 DATE 05/r/97 05/ 6/97'/ / 05/ 7 /97 05/6/97sd*'nts <

CFFICIAL RECORD COPY l

Mr. Nicholas .1. (iparulo .

Docket No.52-003 Westinghousa 51ectric Corporation AP600 cc: Mr. B. 8.. :4cIntyre Mr. Ronald Simard, Director I Advanced Plant Safety & Licensing Advanced Reactor Programs  !

Westinghouse Electric Corporation Nuclear Energy Institute Energy Systems Business Unit  !

1776 Eye Street, N.W. , 1 P.O. Box 355 Suite 300 l Pittsburgh, PA 15230 Washington, DC 20006-3706 Ms. Cindy'L. Haag Ms. Lynn Connor Advanced Plant Safety & Licensing l Doc-Search Associates Westinghouse Electric Corporation Post Office Box 34 Energy Systems Business Unit Cabin John, MD 20818 Box 355 Pittsburgh, PA 15230 Mr. James E. Quinn, Projects Manager LMR and SBWR Programs Mr. M. D. Beaumont GE Nuclear Energy Nuclear and Advanced Technology Division 175 Curtner Avenue, M/C 165 Westinghouse Electric Corporation San Jose, CA 95125 One Montrose Metro 11921 Rockville Pike Mr. Robert H. Buchholz Suite 350 GE Nuclear Energy Rockville, MD 20852 175 Curtner Avenue, MC-781 Mr. Sterling Franks '

U.S. Department of Energy Barton Z. Cowan, Esq.

NE-50 Eckert Seamans Cherin & Mellott 19901 Germantown Road 600 Grant Street 42nd Floor Germantown, MD 20874 Pittsburgh, PA 15219 Mr. S. M. Modro Mr. Ed Rodwell, Manager Nuclear Systems Analysis Technologies PWR Design Certification i

Lockheed Idaho Technologies Company Electric Power Research Institute -

Post Office Box 1625 3412 Hillview Avenue Idaho Falls, ID 83415 Palo Alto, CA 94303 Mr. Frank A. Ross Mr. Charles Thompson, Nuclear Engineer l U.S. Department of Energy, NE-42 AP600 Certification Office of LWR Safety and Technology NE-50 '

19901 Germantown Road 19901 Germantown Road l Germantown, MD 20874 Germantown, MD 20874 1

1

- _ _ _ _ _ _ _ _ . . _ . __ _ _ _ - - - ___ ._ ._ ._ - _. . - - . - .