OPERATING DATA REPORT
'4 i
DOCKET NO. 50-348 DATE 1-1-86 i
COMPLETED BY.T n_mnanrd 1
l TELEPHONE (205)899-5156 s
OPERATING STATUS g, g,gg %.
Joseph M. Farley - Unit 1 ytes
- 2. Reporting Penod:
December. 1985
- 1) Cuinulative data since
- 3. Licensed Thennal Power (MWt): 2.652 12-1-77, date of commercia]
860 operation.
- 4. Nameplate Rating (Gross MWe):
829
- 5. Dessa Electrical Rating (Net MWe):
860.9
- 6. Maximen Dependable Capacity (Gross MWe):
816.5
- 7. Maximum Dependable Capacity (Net MWe):
i
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
I N/A
- 9. Power Level To Which Restricted,If Any (Net MWe): N/A N/A
- 10. Reasons For Restrictions,If Any:
O
~
l This Month Yr..to-Date~
'Cuntalative i
744 8,760 70,872
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 744.0 7,504.1 49,633.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.0 744.0 7,381.2 48,405.6 l
- 14. Hours Generator On.Line 0.0
. o,o o,o
- 15. Unit Reserve Shutdown Hours I
- 16. Gross Thermal Energy Generated (MWH) 1,943,431 18,970,967 122,871,542 648,528 6,209,066 39,303,380
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 616.162
's.868.672 36.997.718
- 19. Unit Service Factor 100.0 R4.1 68.1
- 20. Unit Availability Factor 100.0 84.3' 68.3 101.4 82.1 65.3
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 99.9 80.8 63.0 0.0 1.8 11.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 11/^
l
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 08-06-77 08-09-77 f
INITIAL ELECTRICITY 08-20-77 08-18-77 l
COMMERCIAL OPERATION 12-01-77 12-01-7 d
fte'*it8geygggy,.
y, i
Pk (9/77) i t
-irw-1
-+e-C w-m----
r-
.-=r
- yw----%
haw-i+-
e = - - -
+---t+e--
+eaF+y a
q-as,
- yey, e-y p--rw-*mw-w W-9N-w-
1r9 "T--aw-gr eyr-+ = -MW y
UNIT I
DA"II 1/'/04 COMPLETED SY J.D. Woodard TELEPHONE (205)899-5156 j
310NTl!
December, 1985 j
DAY AVERACE DAILY POWER LEVEL DAY AVERACE DAILY POWER LEVEL (5tWe-Net)
(31We-Net) 821 833 g
37 82 7 gg 833 2
~
~~
~
.j p- -
. _ _ _....._.. _. g 9 _.
g33 g
3 830 833 4
.j.
3 gg 834 764 6
830 22 832 d
832 832 7
23 829 g
24 829 835
,y gg.
gg 827 26 833 i
13 804 2y 831 822 12 g
831 i
l3 826 3
R11 832 833 i
14 30 833 832 15 33 i
16 8 34 ELTTRUCTIONS On this formst. list the. 2venge ds:Iy unit power Icvelin MWe Net for each day in the reporting month. Compute to the neare:t whole me;swatt.
(9p7)
O l
l t
-,n
-w
,-ns
,_,_--.,,-.,.,,pn.,-
-,.e., ~,,,,,
__ng
q
~
O O
O UNIT SiluTDOWNS AND POWER RE MJCHONS DOCKETNO. _50-348
,y UNITNAME J.M.Farley - Unit 1
~d DATE 1/3/96 REPORTMONTil December COMPLETED gy
.T_n Unodard TELEPilONE (20 s M99-5156 "t.
b C
3E
}
- Ej Licensec Ev, Cause & Cosrective
} I ac No.
Date k
.g ok jiji g Repost #
g Psevent Recurrence o}o Event g'g Acthus so 6
vs Le d
THERE WERE NO 1 NIT SHUTDOWN i OR SIGNIF [ CANT POWER REDUCT 'ONS DURI NG THE MONTH OF DECEMBER.
l l
3 3
4 F: Forced Reason:
Meshod:
Exhibi: O. Instructions S: Sclieduled A Eaguipmens Failure (Explain) 1 Manual for Prepuation of Data B-Maintenance of Test 2-Manual Scrasa.
Enesy Sheces for I.icensee C-Refueling 3 Aul.unatic Scraen.
Event Rep ws (LER) FileINUREG-D-Reguiasosy Restricekwi 4 Osher (Explake) 0164)
E-Opesanor Training & Ikense Examination F-Administrative 5
G-Operati mal Earor (Explain)
Exliibit 1 Same Source (9/77) lI Oshcs (Explaki)
TM '
maan, Au,.
.. - ^
- A!abama Powtr Company 600 North 18th Strxt
'- Post Office Box 2641 Birmingham Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building -
AlabamaPower
!m scutwn e;ec:rc system January 13,198ti Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant
- Unit 1
~
Monthly Operating Data Report Attached are two (2) copies of the December 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, ~ required by Sectior.
6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Yours very ru y,.
l R. P. Mcdonald RPM /dCE:amh/F-2 Enclosures xc: Director. IE (10 copies)
- Director, RII (1 copy)
Yg%
,,l\\
i
1 a
J
-JOSEPH M. FARLEY NUCLEAR PLANT LMIT 1 NARRATIVE SLMEARY OF OPERATIONS i
December, 1985 l'
'1here were no unit shutdowns or significant power reductions during the month of December.
'Ihe following major safety-related maintenance was performed in the i
month of December.
l i'
i
}
i 1.
Miscellaneous corrective and preventive maintenance was performed t
l on diesel generators.