Monthly Operating Rept for Dec 1985
ML20141J972
Person / Time
Site: Farley 
Issue date: 12/31/1985
From: Mcdonald R, Woodward J
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8601220085
Download: ML20141J972 (5)


Text

, -

r OPERATING DATA REPORT 5-DOCKET NO. 50-364 DATE l-1-86 COMPLETED BY J.D.Woodard TELEPHONE (7nswm-sl$6 OPERATING STATUS I

1 g, g,gg g Joseph M. Farley - Unit 2 Notes

2. Reporting Period: Decem!n r.

1985

1) Cumulative data since
3. Licensed Thermal Power (MWt): 2,652 i

7-30-81, dato of consnercini 860 operation.

4. Naampiste Rating (Gross MWe):

)

5. Design Electrical Rating (Net MWe): 829
6. Maximen Dependable Capacky (Gross MWe): -850.2 807.2
7. Maximum Dependable Capacky (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

M/^

i

O This Month YrloDete

Cu Inulative I

11. Hours In Reporting Period 744 8,760 38,785

/44.0 6.888.I 38.806.6

12. Number Of Hours Reactor Was Critical u.o 0.0 138.0
13. Reactor Reserve Shutdown Hours
14. Hours Generefor On Line 744.0 6.814.'l 31.392.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0,0
16. Grom Thermal Energy Gentreted (MW.4) 1.962.073 17.381.802 84.234.550
17. Gross Electrical Energy Genereted (MW 1) 647.616 5.776.406,

27.722.688

18. Net Electrical Energy Genersted (MWH) 617.116

'5.470.318 26.289.240

19. Unit Service Factar 100.0 77.8 86,1
20. Unit Availability Facto, 100.0 77.8 86.I
21. Unit Capacity Factor (Using MDC Net) 102.8 77.4 83.7
22. Unit (*specity Factor (Using DER Net) 100.1 75.3 81.8 0.0 2.2 4.8
23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Over Next 6 Months'(Type. Dete,and Durstfon of Each t:

Refueline/ maintenance nutane. 4/4/86. approximate 1'y 5 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Comnwrcial Operation):

Forecast Achieved INITIAL CRITICALITY

.05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 ff B601220085 B51231 pf gDR ADOCM OS000364 -

g9/77) (l PDR

(

\\

a

-.. ~........

tyngy 2

DAll 1l'/A^

COMPLETED BY J.D.Ww dard TELEPHONE (205)899-5156 St0NTl! December, 1985 s

DAY AVERACE DAILY POWER LEVEL DAY AVERnGE DAILY POWER LEVEL (AlWe Net)

(5tWe-Net) 827 842 g

g7 836 33 841 2

~ ~ ^

~

~~ g-g g9.

842 3

4' 837 20 841 836 842 5

21 6

836 22 840 7

715 23 838 g

840 34 8 17 1

9 838 15-840 10 835 26 841 gg 830 27 839 32 828 23 838 13 A"

23 A1A

[4 84 1 30 840 84 1 3g 3g 836 16 841

(?GTRUCTIONS On this form::. list the 2versge daily unit puwer levet in M%e Net for each day in the reporting month. Compute o

, the nesse:t whole me;2 watt.

(997)

O

-n-

,e.-

e

s., - -.

m-

,w aw--

+

i O

O O

50'-364 UNITS 11UTDOWNS AND POWER REIMJCIlONS DOCKETNO.

UNIT NAME J.M.Farlev - Unit,2 DATE 1/7/u COMPLETED sy r n iznnan,a REPORT MONTilDecember TELEP180NE onnnoo_sisA i

I

'i g{b

's n i

=

r.

N.'

thie g

S _g

[

g3$

li'8"5cc 55.,

Cause & C.useceive

~

-5 3" E.""8 83 y

IJ J

$Mf N#P'"I #

g PICvent Recurrence 4I'"' 8" E

O-d t

THERE WERE NO UNIT SHUTDOW IS OF SIGN [FICANT POWEF REDUi :TIONS DURI 4G-THE MONTH OF DECEMBER.

i i

I.

2 3

4 F: Forced Reason:

1 Method:

Exhibit G-las suctions S: Sclie.luled

. A Equigisnens Failure (Explain) 1 Manual fiw Prepasat6ami of Data B-Maintenance ed Test 2-Manual Scrasn.

Ensey Sheeas for I.iccusee C-Refueling 3 AutinnaticScrasa.

Event Rep x (LER)FileiNUREG-D-Regulanuy Ressaiction 4 Onlics (Esplain) 01611 E-Operator Trainina A license Examination F Adadaistrative 5

G-Operati mal Leur (Earlain)

Exhibis I Same S unee (9/77) li Othes (Explain)

~

^

L Malling Address Alibsma Power Comoany1 600 North 18th Street

^ Post Office Box 2641 Birmingham, Alabama 35291

. Telephone 205 783-6090 R. P. Mcdonald

' AlabahtiaIbn'er

~ SeniorVice President.

- Flintridge Building me sa.:vn ewnc s> stem January 13, 1986, Docket No. 50-364 Director, Office of Resource Management U.. S. _ Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Flaat Unit 2 Monthly Operating' Data Report Attached are two (2) copies of the December 1985 Monthly Operating

. Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Yours very tr y,

lx

}

/

i

/

. R. P. Mcdonald RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) s 6

A u mm m

m

. m.

c.-

m..

..m..-

m.

-.-r m.

m m.

m 1

JOSEPH M. FARLEY NUCLEAR PLANT LEIT 2' NARRATIVE SLEMARY OF OPERATIONS December, 1985 There were no unit shutdowns or significant power reductions during the month of December.

'Ihe following major safety-related maintenance was performed in the month of December.

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

9 0

_ -.