Informs That Staff Has Terminated Review of TR NEDC-32160P, Calibration Interval Extension, Dtd Dec 1992 & Closed TAC M85776
ML20141J764
Person / Time
Issue date: 08/18/1997
From: Matthews D
NRC (Affiliation Not Assigned)
To: Rausch T
BWR OWNERS GROUP, COMMONWEALTH EDISON CO.
References
PROJECT-691 TAC-M85776, NUDOCS 9708210227
Download: ML20141J764 (8)


Text

_ _ _ - _ - _ _ _

65 "'et,g\ UNITED STATES

$ , #a NUCLEAR REGULATORY COMMISSION WASHINGTON, D.c. SteeHott 0

..... August 18. 1997 Thomas J. Rausch, Chairman Boiling Water Reactor Owners' Group Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place,4th Floor ETWill Downere Grove,IL 60515

SUBJECT:

CLOSEOUT OF TAC NO. M85776 REVIEW OF BOILING WATER REACTOR OWNERS GROUP LICENSING TOPICAL REPORT NEDC 32160P, "CAllBRATION INTERVAL EXTENSION," DATED DECEMBER 1992

Dear Mr Donovan:

1

}

By letter dated June 13,1996, the staff issued a status report on the review of the Boiling Water Reactor Owners Group (BWROG) Topical Report NEDC 32160P, " Calibration Interval Extension," dated December 1992. The staff concluded that the extended surveillance intervals proposed in Topical Report NEDC 32160P were inadequately justified by the topical report evaluations and the additional data and analyses provided in the BWROG response': to the staff's request for additional information.

During management meetings between the NRC and BWROG held on July 10,1996 and October 23,1996, the BWROG discussed the status of the topical report and indicated that it wmid meet with the NRC technical staff to discuss the open items described in the staff's status report. Four months later, by letter dated February 24,1997, the staff advised the BWROG that, unless it heard from the BWROG within 30 days, it would terminate its review of NEDC 32160P. Thai BWROG responded by requesting a meeting and on March 5,1997, the staff issued a notice of a meeting to be held in Rockville, Maryland on March 28,1997. However, this meeting was cancelled and, to date, the BWROG has not arranged to reschedule the meeting with the NRC or to otherwise indicate a desire to actively pursue closure of the identified open issues. Therefore, the staff has terminated its review of NEDC 32160P and closed TAC No. M85776 on the assumption that review of this topical report is no longer being pursued.

W/4 y:OS 0 mmcanas 9708210227 970010 mm ""

  • DR TOPRP EUTOGBWR g g P401

Thomas J. Rausch 2- August 18, 1997 Wilson, at (301) 4151108.if you have any questions concerning this (notter, pleas Sincerely,

@ wd David B. Matthews, Chief Generic issues and Environmental Projects Branch Division of Reactor Program Management Offi?e of Nuclear Reactor Regulation Project No. 691 cc: See next page I

-~

i d

Thomas J. Rausch 2- Augut 18, 1997 If you have any questions concerning this matter, please contact the project manager, Jim Wilson, at (301) 4151108.

Sincerely, Original Signed By:

David B. Matthews, Chief Generic Issues and Environmontal Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 691 cc: See next page DISTRIBUTIOB1 PUBLIC PGEB r/f SCollins JWermlel MCase CDoutt Central DMatthews JMauck JHWilson JRoe FMmiraglia Document Name: BWROGINT.CLO ,

1 lOFC PGEBOffj (A)SC:PGE@ 4:fflCB C:fGEp lNAME JHWilskn:sw MJCas[ MY DBhutkipews lDATE 0 8/47S 7 08497 d b8/M7 08//V97 OFl:lCIA'. RECORD COPY

I s -

Project No. 691-Solling Water Reactor Owners Group

-cc Carl D. Terry Vice President Nuclear Engineerin Niagara Mohawk, Power Corporation g Nine Nile Point-2 P0 Lox 63 Lycoming NY 13093 Drew 8. Fetters PECO Energy Nuclear Group Headquarters '

MC 62C-3 I

965 Chesterbrook Blvd.

Wayne,-PA- 19087  :'

i John Hosner Commonwealth Edison Executive Towers, 4th Floor

-1400 Opus Place Downers Grove, IL 60515

- George T.' Jones Pennsylvania Power & Light MC A6-1 Two North Ninth Street Allentown, PA 18101 -

Lewis H. Sumner Southern Nuclear / Georgia _ Power E. I. Hatch Nuclear Power Plant U.S. Route 1 North, Box 439 Baxley, GA 31513

'L'. A.' England Entergy Operations Inc.

PO Box 31995 Jackson, MS- 39286 K.'K. Sedney GE Nuclear Energy-175 Curtner Ave, N/C 182 San. Jose,-CA' 95125

, $* ** ev y .4 UNITED STATES

, s* f} NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. SottH001

\ . . . . . */j ' August 18, 1997 i

Thomas J. Rausch, Chairman Bolling Water Reactor Owners' Group Commonwealth Edison Company Nuclear Fuel Services 1400 Opus Place,4th Floor ETWill Downers Grove,IL 60515

SUBJECT:

CLOSEOUT OF TAC NO. M85776 REVIEW OF BOLLING WATER REACTOR OWNERS GROUP LICENSING TOPICAL REPORT NEDC 32160P, " CALIBRATION INTERVAL EXTENSION," DATED DECEMBER 1992

Dear Mr. Donovan:

By letter dated June 13,1996, the staff issued a status report on the review of the Bolling Water Reactor Owners Group (BWROG) Topical Report NEDC 32160P, " Calibration Interval Extension," dated December 1992. The staff concluded that the exten6Jd I

curveillance intervals proposed in Topical Report NEDC 32160P were inadequately justified by the topleal report evaluations and the additional data and analyses provided in the BWROG responses to the staff's request for additional information.

During management meetings between the NRC and BWROG held on July 10,1996 and October 23,1996, the BWROG discussed the status of the topical report and indicated that it would meet with the NRC technical staff to discuss the open items described in the staff's status report. Four months later, by letter dated February 24,1997, the staff advised the BWROG that, unless it heard from the BWROG within 30 days, it would terminate its review of NEDC 32160P.- The BWROG responded by requesting a meeting and on March 5,1997, the staff issued a notice of a meeting to be held in Rockville, Maryland on March 28,1997. However, this meeting was cancelled and, to date, the BWROG has not arranged to reschedule the meeting with the NRC or to otherwise indicate a desire to actively pursue closure of the Identified open issues. Therefore, the staff has terminated its review of NEDC 32160P and closed TAC No. M85770 on the assumption that review of this topical report is no longer being pursued.

Thomas J. Rausch 2- August 18. 1997 l

if you have any questions concerning this matter, please contact the project manager, Jim Wilson, et (301) 4151108.

Sincerely, David B. Matthews, Chief Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation .

Project No. 691 cc: See next page i

+

t i

i

-l-5 t

- , , -,n-.- . - - - , , - . -,, ,..,,m,-, , , , , - - - - + - , . . _ - , -- ,,- - ,-r-- , --

Thomas J. Rausch 2- "9" IO' l If you have any questions concerning this matter, please contact the project manager, Jim Wilson, at ;301) 4151108, l

Sincerely, Original Signed By:

David B. Matthews, Chief Generic lasues and Environmental Projects Branch Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 691 cc: See next page DISTRIBUTION:

PUBLIC PGEB r/f SCollins JWermlel MCase CDoutt Centr.11 DMatthews JMauck JHWilson JRoe FMmiraglia Document Name: BWROGINT.CLO , t OFC PGEB( % Q (A;.,C:PGE@ C:7mp

$:HICB NAME JHWilskn:sw MJCasM kNY DhhAthlpews 3 ATE 08//=797 08497h b8/M7 08/497 OFFICIA'. RECORD COPY

t Project No. 691 Boiling Water Reactor Owners Group cc: Carl D. Terry Vice President, Nuclear Engineering Niagara Mohawk Power Corporation Niu Mile Point-2 PO Box 63 Lycoming, NY 13093 ,

Drew B. Fetters PECO Energy Nuclear Group Headquarters MC 62C-3 965 Chesterbrook Blvd.

Wayne, PA 19087 John Hosner Commonwealth Edison Executive Towers, 4th Floor 1400 Opus Place.

Downers Grove, IL 60515 George T. Jones Pennsylvania Power & Light MC A6-1 Two North Ninth Street Allentown, PA 18101 Lewis H. Sumner Southern Nuclear / Georgia Power E. I. Hatch Nuclear Power Plant U.S. Route 1 North, Box 439 Baxley, GA 31513 L. A. England Entergy Operations Inc.

PO Box 31995 Jackson, MS 39286 K. K. Sedney GE Nuclear Energy 175 Curtner Ave, M/C 182 San Jose, CA 95125