' East Stroudsburg University Docket No. 070-01029 East Stroudsburg, PA 18301-2999 License No. SNM-982 r
i During an NRC inspection conducted on April 30,1997, violations of NRC requirements were identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement Policy), NUREG 1600, the violations are listed below:
A.
License Condition 14.A. of NRC License No. SNM-982 requires that sealed sources containing licensed material be tested for leakage /or contamination at intervals not to exceed six months.
j l
Contrary to the above, as uf April 30,1997 a sealed source containing 48 grams of plutonium-239 was not being tested for leakage /or contamination at intervals not to exceed six months. Specifically, the source which was in use was last tested for leakage on November 1,1995 a time interval greater than six months.
This is a Severity Level IV violation (Supp!ement VI).
B.
License Condition No.17 of NRC License No. SNM-982 requires that the licensee conducts its program in accordance with the statements, representations, and procedures contained in a letter dated March 21,1990.
1 1.
Section 7.0 of the letter (Surveying of Area) requires that the laboratory in the vicinity of the Howitzer be surveyed prior to and following the use or testing.
Contrary to the above, as of April 30,1997 the required survey has not been performed prior to and following use or testing in 1996 or 1997.
Specifically, the last routing survey was conducted on November 1, 1995 at the time of the leak testing.
2.
Section 7.0 of the same letter requires that the Neutron Survey Meter be commercially calibrated annually.
Contrary to the above, as of April 30,1997 the Ludlum Model 15 (Portable Neutron Survey Meter) is not being commercially calibrated annually. Specifically, the meter was last calibrated commercially October 31,1994, a time interval greater than annually.
These are Severity Level IV vio:ations (Supplement VI).
OFFICIAL RECORD COPY 9705280136 970521 PDR ADOCK 07001029 C
-... -.... - - - - - - ~. -.
.s r
b i
,x-I' Notice'of Violation l
- Pursuant to the provisions of 10 CFR 2.201,' East Stroudsburg University is hereby required to submit a written statement or explanition to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555, with a copy to the Regional ~ Administrator, Region I, within 30 days of the date of the letter-i
- transmitting this Notice of Violation (Notice). This reply should be clearly marked as a j
" Reply to a Notice of Violation", and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the l
corrective steps that have been taken and the results achieved,-(3) the corrective l
. steps that will be taken to avoid further violations, and (4) the date when full i
l-compliance will be achieved. Your response may reference or include previous docketed correspondence, if the correspondence adequately addre'sses the required l
response. If an adequate reply is not received within the time specified in this Notice, L
an order or a Demand for Information may be issued as to why the license should not i
be modified, suspended, or revoked, or why such other action as may be proper
[
should not be taken. Where good cause is shown, consideration will be given to extending the response time.
. Because your response will be placed in the NRC Public Document Room (PDR), to the extent possible, it should not include any personal privacy, proprietary, or safeguards L
information so that it can be placed in the PDR without redaction. However, if you find it necessary to include such information, you should clearly indicate the specific infortnation that you desire not to be placed in the PDR, and provide the legal basis to support your request for withholding the information from the public.
J l