PARSONS
/
Parsons Power Group inc.
- 2675 MorDantown Road a Reading, Pennsylvania 19607 * (610) 855 2000 Fax: (C10) 855-2001 July 29,1997 Docket No. 50-336 Parsons NUM2-PPNR-0358-L U.S. Nuclear Regulatory Commission Attention: Document Control Desk l
Washington, D.C. 20555 l
Millstone Nuclear Power Station Unit No. 2 Independent Cctrective Action Verification Program (ICAVP)
Gentlemen:
This letter transmits Revision 3 of Project Procedure PP-07, " Discrepancy Reports". Rese revisions incorporate the changes requested by your letter dated July 24th to reflect the added requirement for i
conducting a preliminary assessment of the potential significance of discrepancies.
Revision 3 replaces in its entirety Revision 2 of the Project Procedure PP-07.
Please call me at (610) 855-2366 if you have any questions.
Sincerely,
/0
~
' (/y
, i (A Daniel L. Curry Parsons ICAVP Project Director DLC:djv Attachments:
cc:
E. Imbro (2) - USNRC H. Eichenholz - USNRC R. Laudenat - NNECo f
J. Fougere - NNECo Rep. Teriy Concannon - NEAC CO
/
9707310189 970729 PDR ADOCK 05000336 P