s j

(]

N.R.C.

OPERATING DATA REPORT v

DOCKET NO.

50-315 DATE 2/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUS 1.

Unit Name D.

C.

Cook Unit 1 2.

Reporting Period JAN 86 : notes l

l 3.

Licensed Thermal Power (MWt) 3250 :

4.

Name Plate Rating (Gross MWe) 1152 :

5.

Design Electrical Rating (Net MWe) 1030 l l

6.

Maximum Dependable Capacity (GROSS MWe) 1056 :

j 7.

Maximum Dependable Capacity (Net MWe) 1020 ---------

8.

If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since l

Last Report Give Reasons ________________

1, 9.

Power Level To Which Restricted. If Any (Net MWe) _________________

10. Reasons For Restrictions. If Any:____________

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 744.0 97176.0
12. No. of Hrs. Reactor Was Critical 744.0 744.0 69033.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0

, ()14.

Hours Generator on Line 744.0 744.0 67596.6

15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2182101 2182101 197177784 i

2

17. Gross Elect. Energy Gen. (MWH) 707310 707310 64684850 1
18. Net Elect. Energy Gen. (MWH) 680160 680160 62227317
19. Unit Service Factor 100.0 100.0 71.0
20. Unit Availability Factor 100.0 100.0 71.0
21. Unit Capacity Factor (MDC Net) 89.6 89.6 64.1
22. Unit Capacity Factor (DER Net)

~88.8 88.8 61.6

23. Unit Forced Outage Rate 0.0 0.0 7.7
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

4

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Uni tE~In~~Tekt StAE~uS~ (Phioh~E~o~Commebc5A5~bp~er$tI~o~n5$~~ ~~~

~

~

~ ~ ~

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i

1 1

8604240308 860131 PDR ADOCK 0500 g5 R

i i

i

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKE1 NO.

50-315 UNIT ONE DATE 2/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901' MONTH JAN 86 i

AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1

913 17 914 2

914 18 915 J

3 914 19 914 4

916 20 914 5

916 21 914 i

6 914 22 915 7

916 23 915 8

915 24 914 9

913 25 913 10 914 26 914 11 917 27 912 12 915 28 915 i

13 914 29 913 14 913 30 916 15 913 31 914 l

16 912 i

i i

s l

l O 4

i

,n

,.n-,-

--,,---na.-

n.-,,

,.,,n

..,----,,...,,--.,,-,-r-,

i 50-315 IMM?KEI NO.

llNil'SlHilDOWNS AND FOWLH HlilllN'llONS tifN I~ N AhlE D.C. Cook, Unit 1 l)A'IE February 7. 1986 B.A. Svensson CDAfri ETEI) hY HIPON'Iklf)Niil January, 1986 616/465-5901

'IEl.I.PflONE q

Y ue.9.

k!

r: _.,

re c: l.

Cause & Cinecolive

.2 e E

,, E *y I ircusrc

[ 8,,

,y"g 4, non,,,

N..

Date 9,

gg g

jgg Evens a7 I"

3 85

  • Ng Hepane &

d'O U

l*f evcut Hectisscm e Q

S There were no Unit shutdowns or None significant power reductions during the month. Tha Unit has operated at a nominal 0% administratively imposed power limit to minimize steam generator tube degradation.

I i

.1 1

1: Foeced Heasim:

bicilmil; liitoliin G. Insisucsi.wis S: Silicifulcil A liipiipmens F,61aue(Emplain)

I hianual foi l'acpasation of Isaia Il blaintenance of Test 2 klanual Scsam.

Enisy Shecis los l Acnsee C NcInclin3

.I Automatic Sesam.

Evens Repose il l'Ril'ile INilRI G-Il Regulatosy Hestsiction

-l Otlics Ilimplain) 0161) l' Opcianos I~saining & Ikcuse l xamittati*ne 5

F-Asiminisseative ITlolui I. Saine Senure G Ogiesatinual 1:esus 11 xplain)

I'l/1'll II Ollic: t hspiain)

Docket No.:

50-315 Unit Name:

D.C. Cook Unit 1 Completed By:

A.

S.

Puplis Telephone:

(616) 465-5901 Date:

February 7, 1986 Page:

1 of 1 MONTHLY OPERATING ACTIVITIES - JANUARY, 1986 HIGHLIGHTS:

The reporting period began and ended with the reactor in Mode 1 at 90% rated thermal power.

Three Engineered Safety Features (ESF) actuations occurred during the reporting period.

Gross electrical generation from the month of January was 707,310 MWH.

SUMMARY

01-07-86 At 0452, No. 1 Boric Acid Transfer Pump was declared inoperable due to a pump leak.

The pump was declared operable at 1847 on 01-16-86.

01-20-86 At 0449, an Engineered Safety Features (ESP) actuation occurred due to a high alarm on containment gaseous radioactivity monitor ERS-1305, resulting in a containme'nt purge isolation signal.

The increase in containment activity is believed to be due to packing leakage while cycling PORV motor operated isolation valve, 1-NMO-151, as part of IST valve operability tests.

At 1439 and 1440, Engineered Safety Features (ESP) actuations occurred due to high alarms on containment particulate radioactivity monitors ERS-1301 and ERS-1401 respectively, resulting in containment purge isolation signals.

01-31-86 At 1155, and earthquake occurring 30 miles northeast of Cleveland, Ohio, measuring 5.0 on the Richter scale.

No observable effects were sensed in the plant and no seismic instrumentation was activated.

A RCS leak rate test was initiated as well as a tour of all plant safety related areas.

No increase in RCS leakage er damage was found.

_ _ _ ~

~_

1

. e 1.

i DOCKET NO.

50 - 315 j

U:.li NAME D. C. Cook - Unit No. I l

DATE 2-7-86 COMPLETED BY B. A. Svensson l

TELEPHONE (616) 465-5901 PAGE 1 of 1 l

MAJOR SAFETY-RELATED MAINTENANCE JANUARY, 1986 M-1 Discovered packing leak and body-to-bonnet leak on 1-IRV-300 RHR Pump Discharge Line Regulating Valve to CVCS Purification System. Disassembled and cleaned valve.

Reassembled with new gaskets and packing.

Retested valve satisfactorily.

l M-2 2-CS-414-3, Primary Water Valve to No. 3 Boric Acid Transfer j

Pump suction was leaking by.

Replaced diaphragm and gasket.

Valve now works properly.

l M-3 Unit 1 No. 1 Boric Acid Transfer Pump was leaking. Rebuilt pump, reinstalled, and retested satisfactorily.

I C&I-1 Bistable 2PB-456D, Pressurizer Pressure Set II, drifted twice

}

in two weeks.

Replaced defective bistable with new bistable, performed calibration, performed surveillance test procedure and declared Pressurizer Pressure Channel Set II operable.

l i

l E.

I 1

i I

l I

s i

I i

1

}

c i

l 1

c.

3 igjZT

,,,,,, IN0 LANA &_MICHIGA_N. ELECTRIC _ COMPANY 3

Donald C. Cook Nuch,ar Plant j

P.O. Box 458. Bndgman, Mchgan 49106 I

f February 7, 1986 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission i

Washington, D. C.

20555 Gentlemen:

l Pursuant to the requirements of Donald C. Cook. Nuclear plant Unit 1 Technical Specification 6.9.1.6, the attached Monthly Operating Report I

i for the Month of January, 1986 is submitted.

i i

Sincerely, t

i W. G. Smith, Jr.

Plant Manager l

l WGS:ab i

Attachments 4

j j

cc:

J. E. Dolan n

~

M. P. Alexich R. W. Jurgensen j

NRC Region III B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Miezzwa F. S. VanEelt, Jr.

P. D. Renniz 1

D. R. Hahn 2

Z.

Cordero J. J. Markowsky J. F. Stietzel i

PNSRC File INPO Records Center ANI Nuclear Engineering Department i

I i

)

k Y'

i