Text
--. -
s j
(]
N.R.C.
OPERATING DATA REPORT v
DOCKET NO.
50-315 DATE 2/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 OPERATING STATUS 1.
Unit Name D.
C.
Cook Unit 1 2.
Reporting Period JAN 86 : notes l
l 3.
Licensed Thermal Power (MWt) 3250 :
4.
Name Plate Rating (Gross MWe) 1152 :
5.
Design Electrical Rating (Net MWe) 1030 l l
6.
Maximum Dependable Capacity (GROSS MWe) 1056 :
j 7.
Maximum Dependable Capacity (Net MWe) 1020 ---------
8.
If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since l
Last Report Give Reasons ________________
1, 9.
Power Level To Which Restricted. If Any (Net MWe) _________________
- 10. Reasons For Restrictions. If Any:____________
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 744.0 744.0 97176.0
- 12. No. of Hrs. Reactor Was Critical 744.0 744.0 69033.4
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
, ()14.
Hours Generator on Line 744.0 744.0 67596.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Therm. Energy Gen. (MWH) 2182101 2182101 197177784 i
2
- 17. Gross Elect. Energy Gen. (MWH) 707310 707310 64684850 1
- 18. Net Elect. Energy Gen. (MWH) 680160 680160 62227317
- 19. Unit Service Factor 100.0 100.0 71.0
- 20. Unit Availability Factor 100.0 100.0 71.0
- 21. Unit Capacity Factor (MDC Net) 89.6 89.6 64.1
- 22. Unit Capacity Factor (DER Net)
~88.8 88.8 61.6
- 23. Unit Forced Outage Rate 0.0 0.0 7.7
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
4
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Uni tE~In~~Tekt StAE~uS~ (Phioh~E~o~Commebc5A5~bp~er$tI~o~n5$~~ ~~~
~
~
~ ~ ~
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
1 1
8604240308 860131 PDR ADOCK 0500 g5 R
i i
i
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKE1 NO.
50-315 UNIT ONE DATE 2/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901' MONTH JAN 86 i
AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1
913 17 914 2
914 18 915 J
3 914 19 914 4
916 20 914 5
916 21 914 i
6 914 22 915 7
916 23 915 8
915 24 914 9
913 25 913 10 914 26 914 11 917 27 912 12 915 28 915 i
13 914 29 913 14 913 30 916 15 913 31 914 l
16 912 i
i i
s l
l O 4
i
,n
,.n-,-
--,,---na.-
n.-,,
,.,,n
..,----,,...,,--.,,-,-r-,
i 50-315 IMM?KEI NO.
llNil'SlHilDOWNS AND FOWLH HlilllN'llONS tifN I~ N AhlE D.C. Cook, Unit 1 l)A'IE February 7. 1986 B.A. Svensson CDAfri ETEI) hY HIPON'Iklf)Niil January, 1986 616/465-5901
'IEl.I.PflONE q
Y ue.9.
k!
r: _.,
re c: l.
Cause & Cinecolive
.2 e E
,, E *y I ircusrc
[ 8,,
,y"g 4, non,,,
N..
Date 9,
gg g
jgg Evens a7 I"
3 85
- Ng Hepane &
d'O U
l*f evcut Hectisscm e Q
S There were no Unit shutdowns or None significant power reductions during the month. Tha Unit has operated at a nominal 0% administratively imposed power limit to minimize steam generator tube degradation.
I i
.1 1
1: Foeced Heasim:
bicilmil; liitoliin G. Insisucsi.wis S: Silicifulcil A liipiipmens F,61aue(Emplain)
I hianual foi l'acpasation of Isaia Il blaintenance of Test 2 klanual Scsam.
Enisy Shecis los l Acnsee C NcInclin3
.I Automatic Sesam.
Evens Repose il l'Ril'ile INilRI G-Il Regulatosy Hestsiction
-l Otlics Ilimplain) 0161) l' Opcianos I~saining & Ikcuse l xamittati*ne 5
F-Asiminisseative ITlolui I. Saine Senure G Ogiesatinual 1:esus 11 xplain)
I'l/1'll II Ollic: t hspiain)
Docket No.:
50-315 Unit Name:
D.C. Cook Unit 1 Completed By:
A.
S.
Puplis Telephone:
(616) 465-5901 Date:
February 7, 1986 Page:
1 of 1 MONTHLY OPERATING ACTIVITIES - JANUARY, 1986 HIGHLIGHTS:
The reporting period began and ended with the reactor in Mode 1 at 90% rated thermal power.
Three Engineered Safety Features (ESF) actuations occurred during the reporting period.
Gross electrical generation from the month of January was 707,310 MWH.
SUMMARY
01-07-86 At 0452, No. 1 Boric Acid Transfer Pump was declared inoperable due to a pump leak.
The pump was declared operable at 1847 on 01-16-86.
01-20-86 At 0449, an Engineered Safety Features (ESP) actuation occurred due to a high alarm on containment gaseous radioactivity monitor ERS-1305, resulting in a containme'nt purge isolation signal.
The increase in containment activity is believed to be due to packing leakage while cycling PORV motor operated isolation valve, 1-NMO-151, as part of IST valve operability tests.
At 1439 and 1440, Engineered Safety Features (ESP) actuations occurred due to high alarms on containment particulate radioactivity monitors ERS-1301 and ERS-1401 respectively, resulting in containment purge isolation signals.
01-31-86 At 1155, and earthquake occurring 30 miles northeast of Cleveland, Ohio, measuring 5.0 on the Richter scale.
No observable effects were sensed in the plant and no seismic instrumentation was activated.
A RCS leak rate test was initiated as well as a tour of all plant safety related areas.
No increase in RCS leakage er damage was found.
_ _ _ ~
~_
1
. e 1.
i DOCKET NO.
50 - 315 j
U:.li NAME D. C. Cook - Unit No. I l
DATE 2-7-86 COMPLETED BY B. A. Svensson l
TELEPHONE (616) 465-5901 PAGE 1 of 1 l
MAJOR SAFETY-RELATED MAINTENANCE JANUARY, 1986 M-1 Discovered packing leak and body-to-bonnet leak on 1-IRV-300 RHR Pump Discharge Line Regulating Valve to CVCS Purification System. Disassembled and cleaned valve.
Reassembled with new gaskets and packing.
Retested valve satisfactorily.
l M-2 2-CS-414-3, Primary Water Valve to No. 3 Boric Acid Transfer j
Pump suction was leaking by.
Replaced diaphragm and gasket.
Valve now works properly.
l M-3 Unit 1 No. 1 Boric Acid Transfer Pump was leaking. Rebuilt pump, reinstalled, and retested satisfactorily.
I C&I-1 Bistable 2PB-456D, Pressurizer Pressure Set II, drifted twice
}
in two weeks.
Replaced defective bistable with new bistable, performed calibration, performed surveillance test procedure and declared Pressurizer Pressure Channel Set II operable.
l i
l E.
I 1
i I
l I
s i
I i
1
}
c i
l 1
c.
3 igjZT
,,,,,, IN0 LANA &_MICHIGA_N. ELECTRIC _ COMPANY 3
Donald C. Cook Nuch,ar Plant j
P.O. Box 458. Bndgman, Mchgan 49106 I
f February 7, 1986 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission i
Washington, D. C.
20555 Gentlemen:
l Pursuant to the requirements of Donald C. Cook. Nuclear plant Unit 1 Technical Specification 6.9.1.6, the attached Monthly Operating Report I
i for the Month of January, 1986 is submitted.
i i
Sincerely, t
i W. G. Smith, Jr.
Plant Manager l
l WGS:ab i
Attachments 4
j j
cc:
J. E. Dolan n
~
M. P. Alexich R. W. Jurgensen j
NRC Region III B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Miezzwa F. S. VanEelt, Jr.
P. D. Renniz 1
D. R. Hahn 2
Z.
Cordero J. J. Markowsky J. F. Stietzel i
PNSRC File INPO Records Center ANI Nuclear Engineering Department i
I i
)