Text
-
T 1
OPERATING DATA REPORT DOCKET NO.
50-244 DATE February 13, 198'6 COMPLETED BY EM h Andrew E. McNanura TELEPHONE 315-524-4446 Ext. 301 OPERATING STATUS Ginna Station
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Notes
- 2. Reporting Period:
January. 1986 1520 Reactor power level reduction
- 3. Licensed Thermal Power (MWt):
490 due to coastdown comunced on
- 4. Nameplate Rating (Gross MTe):
1/lS. OttOz details are 470
- 5. Design Electrical Rating (Net MTe):
g
- 6. Maximum Dependable Capacity (Gross MTe):
490 470
- 7. Maximum Dependable Capacity (Net MTe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, If Any (Net MTe):
- 10. Reasons For Restrictions, if Any:
This Month Yr.-to-Da te Cumulative II. llours In Reporting Period 106.768.63 744 744
- 12. Number of flours Reactor Tas Critical 744 744 109,031.17 0
0 1,687.55*
- 13. Reactor Reserve Shutdown llours 744 744 106,768.13
- 14. Ilours Generator On-Line 8.5*
0 0
- 15. Unit Reserve Shutdown flours
- 16. Gross Thermal Energy Generated (MTil) 1.056.672 1.056.672 148.779.297 354.245 354.245 48.647.101
- 17. Gross Electrical Energy Generated (MTil)
- 18. Net Electrical Energy Generated (MWil) 336,106 336,106 46,139,423
- 19. Unit Service Factor 100%
75.26%
100%
100%
100%
75.27%
- 20. Unit Availability Factor 96.12%
96,12%
70.80%
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net) 96.12%
96.12%
70.80%
0%
0%
7.29%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Anntnl Refueling and Maintenance - Februarv 8 - Annrovirrntnly 49 riavn duration
- 25. If Shur Down At End of Rr port Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecas t
' Achieved INITIAL CRITICALITY
!!:ITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative '!'otal Comencing January 1,1975 8604240290 860131 PDR ADOCK 05000244 ff R
'i AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT E.E. Ginna Nuclear Power Plant DATE February 13, 1986 COMPLETED BY b h & M'71cee- -
Andrew E. McN'amara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH January, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
478 17.
458 2.
477 18, 454 3.
479 19.
449 4.
478 20.
445 5.
478 21, 425 6.
478 22.
437 7.
478 23.
431 8.
478 24.
425 9.
4,8 25.
422 10.
479 26.
416 11.
478 27.
411 12, 477 28.
407 13.
474 29.
402 14.
475 30.
~397 15.
468 31.
393 16.
462 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole mc:1 watt.
- l
e DO( KET NO.
50-244 UNIX NAMI: R.E. GINNA NUCl. EAR POWER Pl: ANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE Feb ary 13 198_6
< OMPl.E'I ED HY
_ _ _d.,,MQF - -
Arx1rew F.. Mctbnnra REPORT MONTil JANUARY. 1986 TEl.EPIIONE 115-524-4446 Ext. 301 Ginna Station n
w 0
N c
1,*[ D Eq 0
Licensee E,
gm Cause & Corrective e
I Event 2.
g*
Action to No.
Da te 1
'i a 2
3 -E j
j $ ",
Report #
!d Prevent Recurrence 2
g U
o The unit experienced no shutdowns or major power level reductions in the report period. See page 4 of report for additional details.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A Equipr:.ent Failure (Explain) 1 -Manual for Preparation of Data B-Mairtenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regclatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 w
crv. ess as-as II-Other (Explain)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E.
Ginna Fuclear-Power Plant DATE February 13. 1986 COMPLETED BY h E NMc.. -- - -
Andrew E. McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH January, 1986 The reactor power level was maintained at - 98% due to main feedwater pump vibration problems from the beginning of the report period until 1/15 when a power level reduction to coast-down commenced.
1
GINNA STATION MAINTENANCE REPORT
SUMMARY
JANUARY, 1986 During the month of January, routine maintenance and inspections were completed.
Major safety related work included:
1.
Replace Handwheel and nut on charging valve 291.
2.
Replace Flange gaskets on Equipment Hatch equalizing valve.
3.
Replace Spent Fuel Pit Skimmer Filter.
4.
Replace Waste Holdup Tank Filters.
5.
Perform M-40 Snubber Inspection.
6.
1-D Service Water Pump / Motor Major Overhaul.
7.
A& B Emergency Diesels Take Oil Samples.
8.
Security Diesel Preventive Maintenance Inspection.
9.
Spent Fuel Pit Recizc. Fump Preventive Maintenance Inspec-tion.
10.
lA Component Cooling Pump Circuit Breaker Preventive Maintenance.
11.
1B Component Cooling Pump Circuit Breaker Preventive Maintenance.
12.
1B Service Water Pump Circuit Breaker Preventive Mainten-t ance.
13.
Monthly Periodic Test of IE Batteries.
14.
Radiation Monitoring System Annual Calibration & Mainten-ance.
15.
Control Room Toxic Gas Monitor Maintenance.
16.
Aux. Feedwater System Instrumentation Annual Calibration.
l
3
,,.i.
ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER N.Y. 14649-0001
,, u ~ 0 c
.~. c.m,. s a e.2 7 00 GINNA STATION February 13, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for January, 1986 l
Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached j
herewith is the monthly operating status report for Ginna Station for the month of January, 1986.
Very truly yours,
/
Stanley M.
Spector Superintendent of Ginna Production i
l SMS/eeg Attachments cc:
Dr. Thomas E. Murley NRC (1) d 9
0 n