! 4 i
i i
i l
July 1, 1997 Mr. D. M. Smith, President
[
l PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195
SUBJECT:
SENIOR REACTOR AND REACTOR INITIAL EXAMINATIONS -
l l
PEACH BOTTOM
Dear Mr. Smith:
In a telephone conversation on June 23,1997, between Mr. Carl Sisco and Mr. Ross Moonitz, arrangements were made for the administration of licensing examinations at the Peach Bottom facility during the week of September 22,1997.
i l
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Interim Revision 8, if NUREG-1021, " Operator Licensing l
Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination out!ines by July 11,1997. The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by August 15,1997.
l Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examination and operating tests, it will be l
necessary for your staff to provide adequate space and accommodations in accordance l
with ES-402, and to make the simulation facility available on the dates noted above. In j
accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating j
tests until the examination results are final.
l Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be
/
l in effect while the written examinations and operating tests are being administered.
O j
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [ Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least j
i 14 days before the first examination date.
1111ll1111lHI IELA 9707140001 970701 PDR ADOCK 05000277 V
i l
I l
Mr. D. M. Smith 2
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on l
April 30, 2000.
l The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including i
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Offi.:e of Information and Regulatory Affairs, NEOB-19202, (3150-0101), Office of Managemont and Budget, Washington, DC 20503.
l The NRC may not conduct or sponsor, and a person is not required to espond to, a l
collection of information unless it displays a currently valid OMB contral number, i
l Thank you for your cooperation in this matter. Mr. Russ Moonitz has seen advised of the l
policies and guidelines referenced in this letter, if you have any quest.ons regarding the NRC's examination procedures and guidelines, please contact Carl Sir co at l
(610) 337-5076 or me at (610) 337-5211.
l l
Sincerely, l
i ORIGINAL SIGNED BY:
i l
i Glenn W. Meyer, Chief l
Operator Licensing and Human Performance Branch Division of Reactor Safety Docket No. 50-277; 50-278 l
l
[
s i
4
)
l l
Mr. D. M. Smith 3
cc:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director, Licensing T. Mitchell, Vice President, Peach Bottom Atomic Power Station i
l G. Rainey, Senior Vice President, Nuclear Operations D. B. Fetters, Vice President, Nuclear Station Support T. Niessen, Director, Nuclear Quality Assurance A. F. Kirby,111, External Operations - Delmarva Power & Light Co.
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station G. J. Lengyel, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel V. Cwietniewicz, Director of Training J. A. Isabella, Manager, Joint Generation, Atlantic Electric W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas R. McLean, Power Plant Siting, Nuclear Evaluations J. Vannoy, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania I
State of Maryland TMl - Alert (TMIA) l
)
l l
l l
\\
e Mr. D. M. Smith 4
i' Distribution:
l Region i Docket Room (with concurrences) l l
W. Axelson, DRA R. Keimig, DRP l
P. Swetland, DRP t
l K. Gallagher, DRP i
l D. Screnci, PAO (1) l C. Sisco, DRS NRC Resident inspector l
PUBLIC W. Dean, OEDO l
J. Shea, NRR J. Stolz, PDI-2, NRR inspection Program Branch, NRR (IPAS)
Nuclear Safety Information Center (NSIC)
R. Correia, NRR F. Talbot, NRR DRS OL Facility File l
DOCDESK l
DRS Files (2) l l
)
i l
DOCUMENT NAME: A:lNITEXAM.PB T3 receive e copy of this document, Indicate in the bcs:
'C' = Copy without ettechment/ enclosure
- [* = Copy with attechment/ enclosure
- N" - No copy 0FFICE Rl/DRS _
l Rl/DRS
_ l
/
l l
l NAME CSisco L b GMeyer (A
DATE 06/30/97 0$/ i /97 ( F 06/
/97 06/
/97 06/
/97 l
07FICIAL RECORD COPY
,