Advises of NRC Planned Insp Effort Resulting from Plant Ppr. Details of Insp Plan for Next 6 Months Encl
ML20141G885
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/14/1997
From: Doerflein L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 9705230062
Download: ML20141G885 (4)


Text

-- - . - - _. .-

May 14, 1997 3

Mr. Charles H. Cruse Vice President - Nuclear Energy 1 Baltimore Gas and Electric Company i Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway ,

Lusby, MD 20657 - 4702

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - CALVERT CLIFFS  !

Dear Mr. Cruse:

[

~

On March 25,1997, the NRC staff completed the semiannual Plant Performcnce Review l (PPR) of the Calvert Cliffs Nuclear Power Plant. The staff conducts these reviews for all  !

operating nuclear power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate planning and '

allocation of inspection resources. The PPR for Calvert Cliffs involved the participation of all technical divisions in evaluating inspection results and safety performance information ,

for the period October 1996 through March 1997. PPRs provide NRC management with a  !

current summary of licensee performance and serve as inputs to the NRC Systematic ,

Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews. ,

i This letter advises you of our p!snned int.pection effort resulting from the Ginna PPR l review. It is provided to minimize the resource impact on your staff and to allow for

~

scheduling conflicts and personnel availability to be resolved in advance of inspector arrival i onsite. The enclosure details our inspection plan for the next 6 months. The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not i listed due to their ongoing and continuous nature.

I We willinform you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337 5378. ,

Sincerely,

/

Original Signed by:

Lawrence T. Doerflein, Chief Projects Branch 1 Division of Reactor Projects 9705230062 970514 PDR ADOCK 05000317

,$fh,

. rm '

0FFICIAL RECORD COPY it:4v 4

t

  • s 1

Charles H. Cruse 2 Docket Nos. 50-317,50-318 License Nos. DPR-53, DPR-69  :

Enclosure:

Inspection Plan -

i cc ' i/ encl: ,

T ritchett, Director, Nuclear Regulatory Matters (CCNPP)

R. McLean, Administrator, Nuclear Evaluations J. Walter, Engineering Division, Public Service Commission of Maryland K. Burger, Esquire, Maryland People's Counsel R. Ochs, Maryland Safe Energy Coalition  :

State of Maryland (2) i l

1

.l l

4

['

t c

Charles H.' Cruse- -3 i

I Distribution w/ encl:

D. Screnci, PAO J. Lanning, DRM Nuclear Safety Information Cen*er (NSIC)

PUBLIC NRC Resident inspector -

Region I Docket Room (with cone'urrences)  :

J. Wiggins, DRS L. Nicholson, DRP -

DRS Branch Chiefs  ;

R. Correia, NRR - r D. R. Taylor, NRR  !

L. Cunningham, NRR i D. Barss, NRR -

[

R. Nimitz, DRS  !

.. L. Doerflein, DRP i T. Moslak, DRP .

M. Oprendek, DRP l R. Junod, DRP Distribution w/ encl: (VIA E-MAIL) i I W. Dean, OEDO (WMD) i S. Stewart - Calvert Cliffs S. Bajwa, NRR A. Dromerick, NRR G. Vissing, NRR M. Campion, RI

. . inspection Program Branch, NRR (IPAS) i DOCDESK t

DOCUMENT NAME: G:\ BRANCH 1\CCLTR To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =

Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRP Al/DRP ,. [

NAME TMoslak J)t/j /m LDoerflein gt]j DATE 05/r i /97  !

05/4 /97 3

OFFICIAL RECORD COPY

l i

Calvert Cliffs inspection Plan Enclosure IP -Inspection Procedure Tl - Temporary Instruction CO - Core Inspection - Minimum NRC Inspection Program (mandatory all plants) lNSPECTION TITLE / PROGRAM AREAL

~~

lNSPECTION1 iTIPE;bFN *  ;
p (STARTj[ INSPECTION /s '

N: s 'DATESf

' COMMENTS E ,

IP 92903 Engineering followup to 5/19/97 RI- Long standing I Service Water System issues regarding issues SWS heat exchanger capability, IP 81700-1 Physical Security Program 6/2/97 CO IP 86750 Radwaste Transportation 7/28/97 CO Units 1 & 2 IP 84750 2 Radioactive Waste 8/25/97 CO Treatment Effluent /

Environmental Monitoring IP 40501 Review corrective actions 3rd Otr 97 RI BGE Appendix R from BGE Appendix R self- self assessment assessment identified vulnerabilities &

deficiencies IP 82302 Review of EP Exercise 9/15/97 CO Objectives & Scenarios lP 71001 Licensed Operator 10/20/97 CO Requalification IP 83750 Occupational Radiation 10/20/97 CO Exposure IP 82301 Evaluation of EP Exercise 11/17/97 CO IP 82701 Operational Status of the EP 1/12/98 CO Program IP 64704 Fire Protection Program 1/12/98 CO

,