O Enti gy operattions,Inc.
Port Gbson, MS 39150 Tel 601437 6470 W.K.Hughey g suy a ne July 1,1997 -
U.S. Nuclear Regulatory Commission Mail Station P1-37 i
Washington, D.C. 20555 Attention:
Document Control Desk
Subject:
Inservice Inspection Program for the 2nd Ten-Year Interval 4
l Grand Gulf Nuclear Station Docket No. 50-416 License No. NPF-29
References:
- 1. GNRO-96/00066, dated July 12,1996
- 2. GNRO-96/00121, dated November 1,1996 i
GNRO-97/00062 Gentlemen:
i Attached is the Grand Gulf Nuclear Station (GGNS) updated Inservice inspection (ISI) program for our 2nd ten-year interval for your information. The program has been updated to the 1992 Edition with portions of the 1993 Addenda of ASME l
Section XI. This fulfills our commitment to provide a copy of the updated program
)
to you after it became effective (Ref.1 & Ref. 2).
fL's 'l The updated program includes all examination requirements and, therefore,
/,
contains no relief requests.1 During verbal conversations with the staff during the [.
I review of our proposal to update to the 1992 Edition with portions of the 1993 Addenda of ASME Section XI, we expressed our desire to attempt the examinations with the technology available today and to completely reevaluate the need for relief after attempting the examination. The staff iesponded favorably and indicated that they expected this approach. if we determine that relief is needed for an examination requirement during this interval, the provisions of 9707070369 970701 PDR ADOCK 05000416 e
PDR 1 10CFR50,55a(g)(5)(iv) requires that, where an examination requirement is determined to 0"I'OOO2 be impracticai and is not.inciuded in tne revised inservice inspection program, the basis for the determination must be demonstrated to the satisfaction of the Commission.
G9706263 DOC
l GNRO-97/00062 l
Pags 2 of 2 i
l 10CFR50.55a(g)(5)(iii) apply. We have reviewed 10CFR50.55a and NUREG 1482, l
" Guidelines for Inservice Testing at Nuclear Power Plants"2 and believe our l
approach is consistent with these requirements and guidelines. If you find l
otherwise, please advise.
GGNS has not identified a requirement for the NRC to approve the actual program l
(Ref.1); therefore, the program has been implemented at our site.
If you have any questions, please contact Sheri Mahoney at 601-437-6552 or Steve Lewis at 601-437-6194.
Yours truly, f
V~ N' SBM/be attachment:
GGNS Inservice inspection Program for the 2nd Ten-Year Interval cc:
Ms. J. L. Heredity-Dixon, GGNS Senior Resident (w/o)
Mr. L. J. Smith (Wise Carter) (w/o)
Mr. N. S. Reynolds (w/o)
Mr. H. L. Thomas (w/o)
Mr. E. W. Merschoff (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011
)
Mr. J. N. Donohew, Project Manager (w/2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 2 Although NUREG-1482 gives guidance for inservice testing, it also provides guidance for the application of the generai requirements of 10CFR50.55a for nuclear power plants.
G9106263 DOC