Discusses Insp on 850801-0906 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000. Violations I & II Represent Breakdown in Mgt Sys to Ensure Compliance W/Tech Specs
ML20141G392
Person / Time
Site: Summer, 05000801 South Carolina Electric & Gas Company icon.png
Issue date: 01/06/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20141G395 List:
References
EA-85-121, NUDOCS 8601100173
Download: ML20141G392 (5)


Text

- - .. _ .- ~ --

.

..

JAN0 6 $86 Docket No. 50-395 License No. NPF-12 EA 85-121 jSouth Carolina Electric and Gas Company v' ATTN: Mr. O. W. Dixon, J Vice President, Nuclear Operations P. O. Box 764 (167)

Columbia, SC 29218 Gentlemen:

SUBJECT: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY (NRC INSPECTION REPORT NO. 50-395/85-34)

An NRC. inspection was conducted on August 1 - September 6, 1985 of activities authorized by NRC Operating License No. NPF-12 for the V. C. Summer facilit The inspection included a review of operational safety verifications, a review of licensee actions in preparation for refueling, a special review of the program for evaluating off-normal occurrences, and follow-up on operating events. As a result of this inspection, failures to comply with NRC regulatory requirements were identified and, accordingly, an Enforcement Conference to discuss these matters was held in the NRC Region II Office on October 8, 198 The inspection report was issued separately on October 23, 198 Violation I in the enclosed Notice of Violation and Proposed Imposition of Civil Penalties involves the failure to meet the Technical Specification requirements for low head safety injection for approximately one hour and fifteen minutes when the plant entered Mode 3 on August 23, 1985. At 6:20 a.m. on August 23, 1985, the V. C. Summer plant entered Mode 3 (hot standby). At 7:35 a.m. the licensee determined that both trains of low head safety injection had been previously rendered inoperable by the closure of motor operated cold leg injection header

. isolation valves XVG-8888A and XVG-8888 These valves were immediately returned to the required open position, thereby returning low head safety injection to the

,

generator standby Emergency Core Cooling System alignmen Subsequent licensee

'

investigation determined that multiple personnel errors resulted in the closure of XVG-8888A at approximately 10:30 a.m. on August 22, 1985, and XVG-88888 at approximately 3:50 a.m. on August 23, 1985. This violation is considered serious by the NRC'because the operators had sufficient information to indicate that both trains of low head safety injection were isolated and inoperable prior to and during entry into Mode 3 operatio CERTIFIED MAIL l RETURN RECEIPT REQUESTED

$"SEESh5 C

.

i

!

l ZEDI

.

.

South Carolina Electric and Gas Company 2 JANO 6 $86 Violation II in the enclosed Notice involves the failure to meet Technical Specification requirements which required that the OP Delta T setpoint shift be zero for a decreasing average reactor coolant temperatur Omitted jumpers in the OP Delta T trip instrumentation circuits allowed the trip setpoints of all three protection channels to vary in a nonconservative direction on decreasing

'T av This condition had existed since initial plant startup in October 198 The Westinghouse Site Service Manager had informed you of this potential problem on December 5, 1984 after a similar incident at the McGuire plant. You were again informed of the McGuire incident on March 22, 1985 via IE Inforraation Notice 85-23. Another opportunity to discover and correct the problem was missed following an August 24, 1985 reactor trip when an irregularity in the OP Delta T instrumentation response was identified but not properly evaluated. These failures to recognize the problem raise the significance of the violatio Violations I and II represent a breakdown in your management system for ensuring that conditions inconsistent with plant Technical Specifications do not develop or if they do, that they are quickly identified and corrected. To emphasize the importance of identifying and correcting plant conditions inconsistent with Technical Specification requirements, I have been authorized, after consultation with the Director, Office of Inspection and Enforcement, to issue the enclosed Notice of Violation and Proposed Imposition of Civil Penalties in the amount of Fifty Thousand Dollars ($50,000) for the violations described in the Notic These violations have been categorized as a Severity Level III problem in accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1985) (Enforcement Policy). The base civil penalty amount for a Severity Level III problem is $50,000. The escalation and mitigation factors in the Enforcement Policy were considered, and no adjustment of the base civil penalty amount was deemed appropriat You are required to respond to the enclosed Notice and should follow the instructions specified therein when preparing your response. In your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective actions, the NRC will determine whether further enforcement action is necessary to ensure compliance with NRC regulatory requirement In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be placed in NRC's Public Document Roo The response directed by this letter and the enclosure are not subject to the clearance procedures of the Office of Management and Budget issued under the Paperwork Reduction Act of 1980, PL 96-51 l o

-_ __

.

.

South Carolina Electric and Gas Company ~ 3

'Should you have any questions concerning this letter, we will be glad to discuss them with yo

Sincerely, ORIGINAL SIGNED BY JOHN A. OLSHINSKI J. Nelson Grace Regional Administrator Enclosure: Notice of Violation and Proposed Imposition of Civil Penalty w/ enc 1:

y0.S.Bradham, Director, Nuclear-

/ Plant Operations 4. G. Croley, Group Manager

/ Technical and Support Services W. R. Hunt, Associate Manager,

-

Surveillance Systems

. B. Knotts, J . A. Williams, Jr. , Special Assistant, Nuclear Operations

,

L

_ > -- .

F ;..

~*

.r M JAN 0 61986 South Carolina Electric and Gas-Company cc w/ enc 1:

,

O. S. Bradham, Director, Nuclear Plant Operations B. G. Croley, Group Manager Technical A Support Services S. R. Hunt, Associate Manager, Surveillance Systems J. B. Knots, J W. A. Williams, Jr. , Special .

. Assistant, Nuclear Operations fccw/ enc 1: Inspector RC Resident'

. Hopkins, Pro,iect Manager, NRR Document Control Desk

_ State of South Carolina DR ECY A

ACRS JMTaylor, IE RVollmer, IE JNGrace, RII

/JAAxelrad. IE TPoindexter, IE

~ Collins. IE

-

Lieberman, ELD Denton, NRR Stello, DED/ROGR R

,

Hayes, 01

!- Connelly, OIA

, Crooks, AE00 IE:ES File IE:EA File See Attached Concurrence Sheet IE:ES ELD Ril ES:D IE:DD IE:D

! TPoindexter JLieberman JNGrace JAxelrad RVn11mer JTayinr 12/ /85 12/ /85 12/ /85 12/ /85 12/ /85 12/ /85 t

i RII' RII RI hW1/b/86 ker GJen 1/3 86 s J01 ~lnski 1/3/86

- _ _ __________________a

, .

,

-

H

, ,

South Carolina Electric and Gas Company JAN O 61986

[. cc w/ encl:

0. S. Bradham, Director, Nuclear Plant Operations 8. G. Croley, Group Manager Technical & Support Services S. R. Hunt Associate Manager, Surveillance Systems J. 8. Knots. J W. A. Williams, Jr., Special Assistant, Nuclear Operations bec w/ enc 1:

NRC Resident Inspector J.Hopkins,ProjectManager,NRR -

Document Control Desk State of South Caroline PDR SECY CA ACRS JMTaylor. IE RVollmer. IE JNGrace, RII JAAxelrad. IE

, TPoindexter. IE JCollins, IE

-

JLiebeman, ELD HDenton, NRR VStello,DED/ROGR Enforcement Coordinators RI. RII, RIII, RIV RV BHeyes. 01 SConnelly, CIA JCrooks AE00 IE:ES File IE EA File k9 o ndexter e G ace dR r 12/ /85 12/f 5 12$/85 /J/86 .

/85 /g/85

. -

,