Advises of Planned Insp Effort Resulting from Plant PPR Review.Details of Insp Plan for Next 6 Months Encl
ML20141G347
Person / Time
Site: Beaver Valley
Issue date: 05/13/1997
From: Eselgroth P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
References
NUDOCS 9705220307
Download: ML20141G347 (3)


Text

_-

d May 13, 1997 Mr. J. E. Cross President Generation Group Duquesne Light Compcny (DLC)

Post Office Box 4 -

Shippingport, Pennsylvania 15077 1

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR)- BEAVER VALLEY On March-26,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of the Beaver Valley Power Station. The staff conducts these reviews for all operating nuclear power plants to develop an integrated understanding of safety

' performance. The results are used by NRC management to facilitate planning and allocation of inspection resources. The PPR for Beaver Valley involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period November 1996 through March 1997. PPRs provide NRC management with a current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Beaver Valley I

' PPR review. It is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for the next 6 months. Resident inspections are not listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan. If you have any questions, please contact me at (610) 337-5234.

Sincerely, Original Signed By:

Peter W. Eselgroth, Chief Projects Branch 7 Division of Reactor Projects 9

i

.Sv

. Docket Nos. 50-334,50-412

/

License Nos. DPR-66, NPF-73 h

Enclosure:

Inspection Plan 1

-220048 E.ESNIS 9705220307 970513 P

j PDR ADOCK 05000334 W

O PDR L-

l*

Mr. J. E. Cross 2

cc w/ encl:

Sushil C. Jain, Vice President, Nuclear Services R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager R. Hansen, Acting Manager, Nuclear Engineering Department B. Tuite, General Manager, Nuclear Operations Unit K. L. Ostrowski, Manager, Quality Services Unit J. Arias, Director, Safety & Licensing Department M. Clancy, Mayor Commonwealth of Pennsylvania State of Ohio Distribution w/ encl:

Region l Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

PUBLIC

.NRC Resident inspector DRS Director, Region I DRS Deputy Director, Region I DRS Branch Chiefs, Region i DRP Director, Region I DRP Deputy Director, Region I DRP Branch Chiefs, Region 1 J. Nick, DRP M. Oprendek, DRP C. O'Daniell, DRP i

pistribution w/ encl (VlA E-MAIL):

J. Stolz, PDI-2, NRR D. Brinkman, PM, PDI-2, NRR W. Dean, OEDO R. Correia, NRR F. Talbot, NRR DOCDESK Inspection Program Branch, NRR (IPAS) 1 DOCUMENT NAME: G:\\ BRANCH 7\\PPR-LTR.BV To reselve a copy of this document, Indicate in the boa:

"C" = Copy without attachment / enclosure "E" = Copy with attach,nent/ enclosure

  • N* = No copy OFFICE Rl/DRP gi Rl/DM y

/

l NAME JNick/ceo (pa PEsel@Q6-DATE 05/09/97 05//> /97 05/ /97 05/ /97 05/ /97 OFFICIAL RECORD COPY

BEAVER VALLEY INSPECTION PLAN IP - Inspection Procedwe Tl - Temporary Instrxtion CO - Core inspection (Minimum NRC Inspection Program (mandatory al plants)

INSKCTies TITLElPIl0GRARA AREA!

IIISPECTISE START :

TYPE OF:-

+

DATES IRSPECTISElCOIAINENTS IP 62706 Maintenance Rule inspection Team TBD Other Activity IP 93801 Design Basis Review TBD Safety issue IP 81700 Physical Security - Visit 1 5112/97 C0 IP 86750 Sobd Radweste Mgmt and Transportation 511 719 7 CD IP 84750-02 Environmsntal Monitoring 6l219 7 CO IP 40500 Effectiveness of Licensee Controls in 911519 7 RI Identifying, Resolving, and Preventing Problems IP 37750 Engineering 9/819 7 C0 IP 8375002 Occupational Radiation Exposure - Outage 91819 7 C0 iP 73753 Inservice Inspection 9/22/97 CD IP 84750-01 Radiological Effluents 1 01619 7 CD IP 82701 Operational Status of EP Program 12I8197 CD I