JOSEPH M. FARLEY NUCLEAR PIANT INIT 2 NARRATIVE SIN 91ARY OF OPERATIONS OCICBER,1985
'Ihere were no unit shutdowns or significant power reductions during the month of October.
The following major safety-related maintenance was performed in the month.of October.
1.
Annual maintenance was performed on 2B Diesel Generator.
2.
Miscellaneous corrective and preventive maintenance was performed on other diesel generators.
i h
i
?
l r
i l
I I
l l
i' 9
l r
jpp1090592851031
~"'
R ADOCK 05000364 PDR IbMN i
i OPERATING DATA REPORT DOCKET NO. 50-364 DATE 11/6/85 COMPLETED BY J. D. Woodard TELEPHONE (2051899-5156 i
OPERATING STATUS 4
otes
- 1. Unit Name,: Josenh M. Farlev - Unit 2
- 2. Reportag Penod: Oc tober. 1985 7-30-81, date of
- 3. Licensed Thermal Power (MWt): 2W connercial operation.
- 4. Namepiste Rating (Gross MWe):
860 829
- 5. Demsa Electncal Rating (Net MWe):
850.2
- 6. Maximum Dependable Capacity (Gross MWe):
80 7.2
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A N/A 2
- 9. Power Level To Which Restncted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Dete Cumulative
- 11. Hours la Reportmg Period 745 7.296 37.321
- 12. Number Of Hours Reactor Was Critical 745.0 5,424.1 32,342.6 0.0 0.0 138.0
- 13. Reactor Reserve Shutdown Hours i
- 14. Hours Generator On.Line 745.0 5,350.3 31,928.4 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours
- 16. Grom Thermal Energy Generated (MWH) 1.943.516 13.581.226 80.433.974
- 17. Gross Electncal Energy Generated (MWH) 645,716 4,503,692 26,449,974
- 18. Net Electncal Energy Generated (MWH) 615,346 4,257,470 25,076,392
- 19. Unit Sernce Factor 100.0 73.3 85.6 100.0 73.3 85.6
- 20. Unit Availability Factor
- 21. Unit Capseny Factor (Using MDC Net) 102.3 72.3 83.0
- 22. Unit Capacity Factor (Using DER Net) 99.6 70.4 81,1 0.0 2.7 5.0 l
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration.of Each):
N/A I
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/81 05/25/81 l
COMMERCIAL OPERATION 08/01/81 07/30/81 l
(9/77)
DOCKET NO.
50-364
~
UNIT 2
DA7I
'w h - A 1905 C05tPLETED 8Y J. n. Uoodard f
m oHONE
( 205) R99-s 1 s6 October, 1985 510NTl!
DAY AVERAGE DAILY FOWER LEVEL DAY AVERAGE DAILY POWER LEVEL (SIWE-Net)
(AlWe-Net) 821 823 g
37 825 823 33 2
~^
~
T5,r ---
3 g9_-
825 4'
n'n 20 A?s 828 826 5
21 6
836 22 825 836 824 7
.g.
825 g
834 24 9
830 25' 827 10 a'n 26 A?A 3g 826 27 829 820 12 A"
23 13 823 3
825 822 829 14 30 822 827 33 15 16 828 INSTRUGONS On this formsr. list the aversge daily unit power levelin MWe Net for each d:y in the reporting month. Compute to
, the nearet whole me;swatt.
(9(77)
55-364 UNITSiluTDOWNS ANDPOWER REIMJCIlONS DOCKET NO.
UNIT NAME J.M.Farley - Unit *2 DATE _11/6/85 COMPLETED gy J.D.Woodard REPORT MONTil October. 1985 TELEPilONE (205)899-5156 I
w
.$ E
}
]* g gsj Licensec
[v,,
k*'L Cause & Correceive No.
Date E
g=
Event uy 8
Acil m to C
k R#E"'t M P*"' N"*"'"
o I
2 6
THERE WERE NO I NIT SHUTDOWN i OR SIGNI PICANT POWER REDUCT ONS DURI NG
' DIE MONTH OF OCTOBER.
l l
1 i,
i 2
3 4
F: Forced Reason:
Method:
Exhibit G - tasseuctions S: S(lieduled A-Equipment Failure (Emplain) 1 -Manual for Pacpasaston of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for 1.icensee C Refueling 3 Automatic Scram.
Event Repiu (LER) File INUREG-D-Regulatosy Resifiction 4 Olher (Emplain) 0161)
E-Opesaion Training a license Examination F-Adminislealive 5
l G-Operatiemal Essor (Explain)
Eshibit ! - Same Source 19/77) ll Othes (Explain)
.e..
Malling Address Alibama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice Presider:t Flintridge Building f\\labama POWCf rv s:umn e n November 8,1985 Docket No. 50-364 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit P.
Monthly Operating Data Report Attached are two (2) copies of the October 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.
If you have any questions, please advise.
Yours very trul,
l 4:V
,i 7 b
R.
. McDona d RPM /BCE:amh/F-2 Enclosures xc: Director, IE (10 copies)