Transcript of 970515 Meeting in Rockville,Md Re Briefing on Performance Assessment Progress in Hlw,Llw & Sdmp.Pp 1-47. Supporting Documentation Encl
ML20141F849
Person / Time
Issue date: 05/15/1997
From:
NRC COMMISSION (OCM)
To:
References
REF-10CFR9.7 NUDOCS 9705220067
Download: ML20141F849 (69)


Text

. .. .

I

[

  • OR\GLKA'_

UNITED STATES OF AMERICA l l

NUCLEAR REGULATORY COMMISSION l l

i

Title:

BRIEFING ON PERFORMANCE ASSESSMENT PROGRESS IN HLW, LLW AND SDMP - PUBLIC MEETING Location: Rockville, Maryland Date: Thursday, May 15,1997 Pages: 1 - 47 V C

pl ANN RILEY & ASSOCIATES, LTD.

1250 I St., N.W., Suite 300 220005 Washington, D.C.20005 - f0p (202) 842 4 34 ,;lg f, t $f' 52 970515

)

L ll {  !,!!f

c -

e a **

DISCLAIMER This is an' unofficial transcript of a meeting of the United States Nuclear Regulatory l Commission held on May'15, 1997 in the Commission's office at One White Flint North, Rockville, Maryland. The meeting was open to public attendance and observation. This transcript has not been reviewed, corrected or edited, and it may l contain inaccuracies.

-The transcript is intended solely for general informational purposes. As provided by.10 CFR 9.103, it is

- not part of the formal or informal record of decision of the matters discussed. Expressions of opinion in this F transcript do not necessarily reflect final determination or beliefs. No pleading or other paper may be filed with the commission in any proceeding as the result of, or addressed to, any statement or argument contained herein, except as the Commission may authorize.

W I

'i b

U-

~. . . . -- . - . - . . . . . . . - . - . - . _ . . . - . . _ . - -. . . - . . .

.O.

, 'l- . UNITED STATES OF AMERICA 2 NUCLEAR REGULATORY COMMISSION ,

3 ***  !

a 4 , BRIEFING ON PERFORMANCE ASSESSMENT l I 5 PROGRESS IN HLW, LLW AND-SDMP 6 '

17- PUBLIC MEETING 8 ***

9 Nuclear Regulatory Commission-L i 101 Commission Hearing Room 11 11555 Rockville Pike .

12 Rockville, Maryland >

f 13:

14 Thursday, May 15, 1997 15

,;. 16 The Commission met in open session, pursuant to 17 cotice, at 2:07 p.m., the Honorable SHIRLEY A. JACKSON, 18 Chairman of the Commission, presiding.

19 COMMISSIONERS PRESENT:

1 20 SHIRLEY A. JACKSON, Chairman of the Commission 21 KENNETH C. ROGERS, Member of the Commission i;

22 GRETA J. DICUS, Member of the Commission i

23 EDWARD McGAFFIGAN, JR., Member of the Commission 24- NILS J. DIAZ, Member of the Commission a

25 '

8 4

4

  1. ~

ANN-RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N .II. , Suite 300 Washington, E.C. 20005

.(202) 842-0034 y

-* 1 2 5

~

1 STAFF AND: PRESENTERS SEATED AT COMMISSION TABLE:

2 ~ JOHN C. HOYLE, Secretary {

r 31 KAREN D. CYR,' General Counsel l 4 JOSEPH CALLAN, EDO j 5 MALCOLM KNAPP, NMSS i 6 JOHN GREEVES, NMSS. j 7' NORM EISENBERG, NMSS j 8' i l

9  !

t 10 ,

i 11 1 l 12 13 14 i i

15'  !

t 16  !

17'- i 18 .

i 19 1 20- [

i r

21 ,

22' l 23' l 24 ,

25' 3-ANN RILEY &' ASSOCIATES, LTD.

Court Reporters 1250~I Street, N.W., Suite 300- .;

Washington, D.C. 20005 i (2021'842-0034 4

+

-d. ,- - .--,,,a .- y-- . , . , ~ --p., . w- y

- _ . __ . _ _ . _ _ . . _ _ . _ _ . . _ . ~ _ ___ ._ __

3 ,

1 P R'O'C E E D I'N G S -

r 2 [2:07 p.m.]

3 CHAIRMAN JACKSON: Good afternoon, ladies and 4 gentlemen. Today,.the Commission will be briefed by the NRC 5 staff on its performance assessment program,. which covers 6 three technical areas that are of-great importance to the

'7 Commission. Tl'ese areas are low-level radioactive waste ,

8 . disposal, high-level radioactive waste disposal and site 9 decommissioning.

10- 'The staff made it clear at least year's Commission l 11 briefing on this subject that developing a performance  ;

I

12. assessment model in any one.of these three technical areas 13- is a complex and challenging task. I remember your very  ;

14 informative briefing, Mr. Eisenberg.  ;

15 However, the development of high-quality 16 performance assessment models for low- and high-level waste 17 and site decommissioning would enable the Commission to 1 i

18 - obtain significant quantitative and qualitative input for )

l 19 making: risk-informed regulatory decisions on these matters.  !

20 But we also understand the performance assessment is more 21 than risk assessment.

22 The Commission is looking forward to hearing the 23 new developments in the performance assessment program as it 24 ' rela.'es-to' radioactive waste disposal and.SDMP sites. If 25 none of my clienta have opening comments, Mr. Callan, why 1

i ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I-Street, N.W., Suite'300 Washington, D.C. 20005 l (202) 842-0034 1

4 1 don't you proceed. .

2 MR. CALLAN: Thank you, Chairman. Good afternoon.

3 Chairman, you covered the points I was going to 4 make in ny opening remarks. I will just introduce those at 5 the table. With me are Mal Knapp, the deputy director of 6 NMSS, John Greeves, the director of the Division of Waste 7 Management and, as you introduced him, Chairman, Norman 8 Eisenberg, the senior cdvisor for performance assessment who 9 works for John Greeves in his division and, as last year, 10 Norm Eisenberg will be the principal briefer.

11 Norm?

12 MR. EISENBERG: Okay, thank you very much.

13 If we could go to slide two, this is an outline of 14 the briefing. I will begin by defining performance 15 assessment, just to get us all on an even footing. Second, 16 because of the Commission focus on PRA, I will discuss the 17 similarities and differences between PRA and performance 18 assessment which we feel is the manifestation of PRA and 19 waste management.

20 Third, I will discuss for each of the Division of l l

..?. i Waste Management program areas the PA program recent 22 accomplishments and limitations that we have. And, finally, 23 I will summarize.

24 Performance assessment is a type of systematic  ;

1 25 safety analysis that explores for a waste facility what can  ;

l ANN RILEY & ASSOCIATES, LTD.  !

Court Reporters l 1250 I Street, N.W., Suite 300  !

Washington, D.C. 20005 (202) 842-0034 1

5 [

1. happen, how likely it is and what the impacts of the ,

2 occurrence are. In this regard, the performance assessment ,

3 is consistent with'the Kaplan-Garrick triple used to define 4 risk. Performance assessment integrates information, number 5 one, across a wide variety of disciplines. We go from ,

6 inside near the waste package all the way out to the far 7 field in the biosphere so we include disciplines such as  ;

8 corrosion science, geochemistry, radio nuclide transport, 9 hydrology, heat transfer, rock mechanics, the list goes on ,

10 and on. In addition, PA integrates information across  !

11 program areas. For example, design information, site 12 characterization information, analytical studies and, of  !

13 course, our bottom line is regulatory compliance.

14 The term performance assessment as used in the  !

15 Division of Waste Management encompasses a broad range of 16 quantitative analyses applied to waste disposal facilities t

17 and we try to match these analyses to the need. f 18 Deterministic bounding analyses are used most often but

19 probabilistic analyses are used for complex facilities or i

20 issues like the high-level waste repository.  ;

. 21 CHAIRMAN JACKSON: Let me ask you a question. I  !

22 don't want to de-track you but perhaps Dr. Knapp or 23 Mr. Greeves can answer this question. Can you give us some 24 examples of actual regulatory uses that have been made, if a

25 there have been any, of performance assessment results and ANN RILEY & ASSOCIATES, LTD.

. Court Reporters

1250 I Street, N.W., Suite 300 Washington, D.C. 20005-f (202) 842-0034

. _ , a ,

6 1 do you have regulatory guidance documents in the performance ,

2 assessment area that, in fact, you make use of?

3 MR. KNAPP: I will turn to these gentlemen to talk 4 a little bit about the documents but you give me an 5 opportunity to talk about something we did when I was active 6 in this area over 15 years ago. And that was when the 7 Department of Energy was actively investigating the Hanford 8 site, known as PWEB. And we used performance assessment as 9 a basis for debating with them and I believe reaching 10 conclusions that we preferred over the analysis of 11 groundwater at PWEB. That was a very early application of 12 some embryonic things that Norm has subsequently developed 13 in detail. But that is one that comes to mind. Although 14 you might not call it a formal regulatory use, in our 15 interactions with the Department of Energy in high-level, it 16 was a very useful tool.

17 CHAIRMAN JACKSON: It is coming to resolution on 18 some technical issues.

19 MR. KNAPP: Exactly. I am sure they could have 20 other examples but I will turn to John to talk about it.

21 MR. GREEVES: I will try and be brief and give you 22 a couple of examples. One, Norm is going to talk about the 23 branch technical position in low-level waste. That is an 24 example of guidance level use in a regulatory format.

25 Another one is, as you know, with the ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

7 1 decommissioning rule, there is a whole set of guidance that 2 .needs to lay underneath of that. The staff is working on 3 that guide' presently and our goal is to have'it.available in

<4 a timely way. So that is another example.

5 And a third, it might not be quite the example you ,

6 'were looking.for but DOE has completed eight performance 7 assessments on ten of their sites and they have a 8 headquarters review group that is, in fact, performing a 9 regulatory function at this point in time in terms of llu reviewing the performance assessment that was conducted at 1

11-' the site, j 12 I am not as familiar as I would like to be with 13 that process but I am told it has many of the elements that 14 we are using and I will just finish with one. We have got 15 the West Valley project facing us in the future so I see  !

1 16 these tools being applicable to that in a regulatory )

17 environment where we have a direct role.

18 CHAIRMAN JACKSON: Could you speak to the issue of i 19 the regulatory guidance documents and the extent to which

20 they either exist or are being developed? I r

21 MR. GREEVES: As far as the regulatory guidance '

22 documents, the principal one that I would point to is the 23 branch technical position. We put out a draft of that in *

! '24 1 94, we have been working on it since and you are going to {

25 hear Norm talk about it in terms it is about ready to go out l

ANN RILEY & ASSOCIATES, LTD.  :

Court Reporters 1 1250 I Street, N.W., Suite 300 i Washington, D.C. 20005 l (202) 842-0034 l

I

__ a, , _ -,

8 1 :the door. ,

1 1

2 Norm,'can'you add any other regulatory guidance? ]

3 MR. EISENBERG: 'Well, there is the --  !

.4- MR. GREEVES: The high-level' waste material, the 5 expert elicitation documentation.

6 MR.'EISENBERG: Right. Then regulatory decisions 7 have been made on specific cases. I don't.know if you' ,

I 8- recall-but last year we talked a little bit about the Curtis 9 Bay facility and as I understand it, either in a few weeks 10 cn: aefew weeks ago they had a public meeting because they i

~

11' are going to take the site off the list. So there is real  ;

12. world regulatory decisions being made. l l

13 CHAIRMAN JACKSON: Thank you.  !

14 MR. EISENBERG: Okay, I think we are on slide 15 four.

16 Some points of comparison between performance l 17 assessment and PRA. Both are types of safety system i

18 analysis and have very similar analytic structures. I will 19 say.a little bit more about that later.

20 Although PRA is used as a complement to '

21 deterministic requirements for reactor regulation,

.22 performance assessment is used to demonstrate, compliance >

2 3.. -with regulatory requirements for waste facilities. In L24 simple cases, it may just'be a simple deterministic i

25 - analysis. Both performance.assessmentfand'PRA generally )

3 ANN RILEY & ASSOCIATES, LTD, l

Court Reporters  !

1250 I Street, N.W., Suite 300 r

,- Washington, D.C. 20005  !

(202) 842-0034 5

)

i g ]

1- treat the same types of uncertainties related to model 2 parameters. The models themselves and future states of the )

)

3. system or scenarios. l 4 Performance assessment and PRA integrate risks 5 from likely and unlikely events and both methodologies are 6 adaptable to the nature of the problems studied. However, I 7 think, the differences from site to site for. commercial 8 nuclear reactors is much less than the differences from site 9 to site for waste facilities. There is a lot more i

10 Oariability.

i 11' CHAIRMAN JACKSON: Are there places where the 12 actual models overlap? I mean, have you ever used similar  !

l 13 models or the same types of models?

14 MR. EISENBERG: Certainly in some cases, l

15 especially in the area of doses, certainly the fundamental 16 methodologies are similar. However, they must be adapted 17 for the case at hand so we couldn't, for example, use the 18 CRAC code to analyze the volcano extruding waste into the i 19 atmosphere from a repository because a very important part i

20 of the problem was the interaction of the waste with the 21 magma and the dynamics of the ash plume migration. That is l l

22 something that isn't in CRAC so it wouldn't do a good job on l l

23 that.

24 CHAIRMAN JACKSON: I guess what I am really l 25 asking, more in terms of kind of probabilistic L

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street,'N.W., Suite 300 22 84 I b3

10  ;

1 distributional assumptions of dcting the distributions and , ,

4 2 how things are parameterized, that kind of thing.

r 3 MR. EISENBERG: I think there may not be a whole  ;

4 lot of similarity in that' regard. As I will point out  ;

s j 5- later, both methods use Latin hypercube sampling in order to  :

6 do a whole --

l 4

7 CHAIRMAN JACKSON: Which I am going to ask you to .

8 define.

9 And last two quick questions, you know, is most of .

i 10 our performance assessment work done in house? And how many i 11 experts such as yourself do we have on staff?

e

12 MR. EISENBERG
For high-level waste, of course, 13' we share resources with the center and they make a great l

~

14 many contributions to our efforts. For low-level waste, we

{

15 have used some other contractors to help us but there was a l 16 large effort internally. For SDMP work, we are also getting  !

17 outside contractor help but a lot of work is being done in .

18 house. In fact, the case work is largely done in house, 19 MR. GREEVES: I'd like to point out that a number 20 of the staff sitting here with us are the people we rely on  !

21 in terms of doing this performance assessment, right here.

22 CHAIRMAN JACKSON: So we better not have anything i 23 happen to them.

24 MR. GREEVES: We can't afford to have anything 25 happen to them, I would say there is a large amount of the 2

ANN RILEY & ASSOCIATES, LTD.

-Court Reporters '

1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202).842-0034

l 11 1- work'being~done in house and I would also like to point out

. 2' that research is doing performance assessment. They are 3 developing some tools for us. So there is a lot going on )

i 4 and I am pleased with it, I would like to see more of it. j i

5 But we will do what we can with the resources we have. I i

6 CHAIRMAN JACKSON: So six people?

7 MR. EISENBERG: No , I think Keith McConnell is the I l

8 section leader for performance assessment and I think there

9. are nine or ten people in the section. So that is a core 10 group. But then we take advantage of talents elsewhere on )

i 11 the staff as needed.

12 COMMISSIONER DIAZ: And the center, do we do 13 approximately 50 percent of the work in house?  !

14 Approximately, a ballpark?

, 15 MR. GREEVES: I think it is more than half. That i 4 i 16 would be my assessment. I could get back to you with a j 17 better answer.

18 CHAIRMAN JACKSON: Thank you.  ;

19 MR. GREEVES: It is basically the center is the 4

20 main contractor we use and, actually, we are trying to use 21 them i'n all three of these areas.

~

22 CHAIRMAN JACKSON: Okay. Commissioner McGaffigan?

l 23 COMMISSIONER McGAFFIGAN: Could I ask in 24 comparison wit.n other agencies, you mentioned DOE had done 25 some performance assessments. Does EPA use performance I

ANN RILEY-& ASSOCIATES LTD. l' Court Reporters

, 1250 I Street, N.W., Suite 300

Washington, D.C. 20005 (202) 842-0034 l

l'

12 1 assessment? You know, their norm sites, the coal ash sites, ,

2. that sort of thing, or any other area? Do they look at the 3 sort of -- develop the sort of models you guys use here?

4 MR. GREEVES: Again, my information is somewhat 5 limited. Maybe Dr. Knapp would like to add to it. But, 6 yes,.they are doing things. In fact, one of the tools we 7 are working on, EPA participates in the funding process for 8 one of those we are developing in house. So I know they do 9 some of it. Carl Papierello speaks about it frequently, he 10 likes some of their codes. But, Mal, you want to add to 11 that?

12 MR. KNAPP: I would say there is not an 13 unreasonable amount of overlap in terms of what we try to 14 do. That has, again, gone on for years. But the codes are 15 different.

16 In general, I would say that EPA's codes tend to 17 be a little more generic and a little less site specific 18 than ours. I would argue that ours tend to be a little more 19 realistic than theirs are but I suspect if there were an EPA 20 representative to my right --

21 CHAIRMAN JACKSON: We would hear it the other way.

22 MR. KNAPP: Exactly. But the codes, we have a 23 number of codes that are somewhat in common that differ a 24 tcle h9sause of our different missions and I think we talk 25 about them and occasionally debate them enthusiastically.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300  !

Washington, D.C. 20005  ;

(202) 842-0034 1 l

l 13 1 'As-a matter of fact, yesterday in a meeting of 2 discourse, the group on radiation standards,.we were talking P 3 about how we were going to reconcile some of the differences ,

l 4 in codes.

5 CHAIRMAN JACKSON: Did I hear you say that EPA  ;

6 funds'some work together with us?

7 MR. GREEVES: We just had a briefing today on a ,

8 code development process that research has a lead on it and  ;

9 it has been funded by a number of entities, including DOE, 10- EPA'and NRC. .That funding profile looks a little bit like l 11- the budget cycle in the last five or six years but it is a 12 valuable tool that I think could be back giving you more ,

13 information on when it becomes more useful.

J l 14 COMMISSIONER McGAFFIGAN: Could I clarify whether 15 realistic was a synonym for conservative or stringent? I P

16 have heard in this norm case the EPA code is a code that we 17 would love -- well, I am not sure we would love to use 18 because we don't think it is realistic, we think it is too  ;

i 1

19 liberal in its assumptions.

20 MR. KNAPP: I don't have a simple answer for that.

21 It would depend on the code and the particular assumptions.

22 Some, we view as more realistic. Of those cases where we i

23 feel we are more realistic, in some cases we think that EPA  !

24 may be nonconservative, Some of our concerns, and I will 25 look to Norm and John to correct me, but in low-level codes, ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 4

(202) 842-0034  ;

i  !

14 ,

1 1- we would say there are some areas where their more generic .,

2 codes developed earlier were less conservative. But I i

13 wouldn't say we are putting conservatism in. l l

4 If you would like, I would argue that we are j 5 realistic and they may be nonconservative. But that m3ght- l 6 be for two or three variables in the code and the fourth 7- variable it might be either way. It is just there is no f

8 simple answer but I would certainly ask either of them to 9 correct me or elaborate.

10 MR. EISENBERG: I think that's right. There is 11- not an across-the-board, simple relationship.

12' CHAIRMAN JACKSON: Okay, why don't you proceed. ,

13 MR. EISENBERG: I think we are on slide five.

t-14 I would like to talk a little bit about the -

i

  • 15 approaches in PA and PRA. There are many shared approaches, 16 the structure of the analysis, both have a risk focus.

17 . Latin hypercube sampling was adopted by the PRA folks. It 18 was developed in the waste program. Latin hypercube 19 sampling is a type of stratified sampling.

.20 Instead of doing strict Monte Carlo -- well, there r 21 will be a slide coming up, two slides, where we will talk 22 about doing sampling or propagating uncertainties for f 23 ' consequence models.

24 CHAIRMAN JACKSON: Would it be better to wait, 25 then?

ANN RILEY & ASSOCIATES, LTD.

Court Reporters

  • 1250.I Street, N.W., Suite 300 I Washington, D.C. 20005 (202):842-0034  !

15 1 MR. EISENBERG: Okay, let's wait. 'You convinced

. 2 me.

'l 3 Certainly, also, the categorization and treatment '

J 4 of uncertainties. However, there are some fundamental  ;

5 . differences between the systems analyzed in waste and the- 't 4

I 6 systems analyzed in PRA for reactors. There are differences 7 in approaches because of the differences in systems.

8 For_ example, waste' systems are largely continuous 9 and their components degrade in a continuous fashion.

10 CHAIRMAN JACKSON: Actually, so do reactors but '

t 11 they are treated discretely. l 12 MR. EISENBERG: Yes.

13 CHAIRMAN JACKSON: Some of them do. ~ That's my 14 statement. You' don't have to agree, f

15 Sorry to throw you off, but go on. [

16 MR. EISENBERG: The waste systems have engineered

. 17 and natural components whereas the reactor is a largely 18 engineered system with natural events possibly impinging on 19 it. The waste facility is often large and dispersed with i

20 many similar components like waste packages, while the 21 reactor is'a single system with major failure modes .

)

22 affecting the entire system.

i 23 For example, a single leaking waste-package in a  !

24; repository of 20,000 may not be a major thing., If you have 25 a loss of. coolant in the reactor vessel, that's a problem.

f i

l ANN RILEY & ASSOCIATES, LTD. t Court Reporters 1250 I Street, N.W., Suite 300 F

Washington, D.C. 20005 .

(202) 842-0034

16 1 The mission time for the reactor, say 40 years, is ,

2 long compared for the time of development of the  ;

~

3 consequences of a reactor accident, say hours to days; _

h 4 'whereas,'for a waste system, the mission time, say 10,000 t i 5 years, is comparable to.the time of development of 6 consequences, which is also thousands to tens of thousands 7 of years. Thus, for the waste facility, one failure mode,  ;

8 say waste package corrosion, will be overlapped by other  ;

9 failure modes such as an earthquake.

10 For a reactor, these multiple events occurring 11 together are so unlikely they are generally left out of the  ;

12 analysis with good cause.

13 Finally,' the waste facilities are largely passive [

t 14 while the reactor has many active redundant safety systems. i 15 CHAIRMAN JACKSON: Let me stop you for a second.

16 You are going to talk about how uncertainties are accounted 17 for in the decisionmaking process at the same time when we 18 talk about the Latin hypercube sampling. Is that what you t 19 promised?

20 MR. EISENBERG: One slide later.

21 CHAIRMAN JACKSON: Okay. And let me just ask one 22 last question. Can you talk a little about how passive 23 systems are treated probabilistically in performance i 24 assessment and would you venture a statement as to whether 25 that approach'would also work for passive reactor systems?

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

a 17 1 MR. EISENBERG: We tend to treat the passive 2 systems and their behavior in the consequence analysis 3 because that is really the essence of the waste system 4 behavior. We treat some -- but, of course, we include 5 uncertainties as we will see in a minute.

6 But in terms of probabilistic treatments in terms 7 of conditions that occur or don't occur, these are treated 8 similar to the way external events are for the reactor 9 analysis.

10 We are working on a problem and I hope we are 11 successful trying to develop importance measures for the 12 waste system. Since we don't have a strong embedding in 13 fault tree and event tree analysis, we can't take full 14 advantage of the current methods, the pressure vessel type 15 importance, things like that, and we are trying to develop 16 some other methods. If we are successful, they might be 17 applicable to some of the passive systems in the reactor 18 business also but we are not sure we will succeed.

19 CRAIRMAN JACKSON: Thank you.

20 MR. EISENBERG: Okay. The next figure shows the 21 sequence of analysis for PRA and performance assessment and, 22 as you can see, they are quite similar. The components of 23 the analysis are similar but they are not identical and if I 24 could just take one as an example, the source term analysis 25 in a level two PRA deals with phenomena relating to 1

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 ,

(202) 842-0034  !

~. .. . . _ _ _ . _ _ . _ _ . _ _ _ .. _ . . . .

4 18 1 migration-of. radio nuclide material from a damaged core to ,

2- 'outside the containment structure and those phenomena could 3 include high-temperature chemical reactions of the corium 4 . plate-out inside the containment building and leakage 5 through penetrations in.the building.

6 For performance assessment, the facility source 7 term involves or could involve corrosion of the waste j

.8 package,. chemical conditioning of the water coming in 9 contact with the waste, dissolution of the waste, and all of 10 that occurs at relativel; low temperatures to what might go 11 on'inside a reactor vessel. So the structure is quite 12 similar but the components we use in each facet are 1

13 different.

14 Okay, here comes - .I can't avoid it any longer.

15 This slide attempts to show how a linked chain of 16 performance assessment consequence models with uncertain ,

17 inputs produces a distribution of performance for the ,

18 system. In other words, this is variability. Treatment of 19 uncertainty in the inputs is propagated to a distribution of 20 outputs giving you a measure of uncertainty in the output.

1 21 Just for example, model A could represent the 22 source term with uncertain inputs for things like corrosion 23 rate, the solubility limit, flux into the waste package.

24- Model B might be transport of radio nuclides into 25 groundwater with uncertain inputs for porosity, permeability t

?

5 i- ANN RILEY & ASSOCIATES, LTD.

Court Reporters  :

1250 I Street, N.W., Suite 300  :

Washington, D.C. 20005 '

(202) 842-0034

.n

.' 19

. t 1 and. groundwater flux. Model C.could represent biosphere 2 r.ransport vith uncertain variables representing foodstuff 3 intake, irrigation rate variables like that. l 4 By sampling these input parameters repetitively, 5 one runs the whole chain of models and gets an estimate of 6 performance related to that particular choice. When you do 7- this hundreds of thousands of times, you get a distribution ,

8 of performance for.the entire system. One way to do that'is 9 to do strict Monte Carlo sampling where the input parameters 10 are chosen randomly.

11' We used a method called Latin hypercube sampling '

1 12 which partitions each distribution into segments that are 13 equally probable and we sample from them without 14 replacement. So we have a whole routine to go through in i

15 order to generate samples for the inputs that give us these

- 16 variable outputs. The advantage is that you are assured of 17 covering the entire probabilistic regime with the 18 appropriate probability weights in a much more economical 19 fashion than doing strict Monte Carlo sampling which, of 20 course, is going to sample a whole lot around the mean .

21 CHAIRMAN JACKSON: Do you perform sensitivity l 22 studies? l 23 MR. EISENBERG: Once we have the distribution of 24 outputs and we have the distributions of inputs, we can then 25 look for correlations which translate into sensitivities.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washingto'n, D.C. 20005 (202) 842-0034 r

, - + - * -4 -n . _ -_ _ _ _ _ . _ _ . _ . _ _ _ _ _ _ _ _ _ _ _- _ _ _ _ _ _ _ _

__.________m_.______m_._

20 l

1 It is kind of a global type of sensitivity rather than ,

1 2 sensitivity in a particular point in this multi-dimensional 3 parameter space.

4 CHAIRMAN JACKSON: And how do you identify the 5 dominant contributors to risk for a given scenario?

6 MR. EISENBERG: We have so far looked at these 7 correlations and the ones that come up being having the 8 greatest influence or the highest effect on the output are 9 deemed the ones that are most important.

10 I should say in that regard that the same variable 11 might appear as an input to different models or the inputs 12 to the models might be correlated. So in what I just said, 13 the irrigation rate is related to the rainfall. Well, the 14 infiltration of water into the waste package is related to 15 the rainfall too. So you have these correlations and they 16 have to be taken care of and considered in the sampling.

17 CHAIRMAN JACKSON: What is the role of expert 18 opinion? And then I am going to defer to Commissioner 19 McGaffigan.

20 MR. EISENBERG: Well, I would say expert judgment 21 is used to generate the distributions, the probability 22 distributions for the various parameters, the PDFs. I think 23 it is -- you could almost take as a given in the waste 24 business these parameters are rarely, if ever, measured 25 directly. These are almost always inferential measurements ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D'.C. 20005 (202) 842-0034

4 21 1 so that if you are interested in the porosity of a geologic 2 unit, one thing you can do is take a piece of core, take it 3 into the lab, push water through it and see what its 4 permeability is.

5 Well, you can also pump water into it and see how 6 much water you can pump into it with a given back pressure.

7 That is another way. So there are all different ways to 8 approach these things and these various lines of evidence 9 have to be integrated and expert judgment plays a strong 10 role --

11 CHAIRMAN JACKSON: -- role in that integration.

12 MR. EISENBERG: And interpreting these fundamental 13 data into the inputs for the performance assessment.

14 CHAIRMAN JACKSON: Commissioner McGaffigan.

15 COMMISSIONER McGAFFIGAN: I am not sure this is 16 the right time to ask this but Latin hypercube sampling 17 versus Monte Carlo, what biases get introduced? I mean, I 18 understand Monte Carlo. I haven't studied Latin hypercube, 19 If you have the same graphs for the various models 20 and you run it, how close do they come to each other?

21 MR. EISENBERG: If you are able to take enough 22 samples, and there is an art to determining how many 23 samples, and in f act sometimes what we do is we run 200 and 24 then we run 400 and if the answer doesn't change very much 25 we say, well, 200 is good enough.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

22 1 But the answer is, if done properly, there should ,

2 be no biases introduced because you are using the same 3 probability distributions; you are just using an economical 4 way of sampling.

5 CHAIRMAN JACKSON: It's the sampling, right.

6 MR. KNAPP: One of the ways I think of it is if 7 you use Monte Carlo with the same numbers as Latin 8 hypercube, there is a risk that when you generate your final 9 response surf ace there might be some holts in it. Just by 10 virtue of where you picked your initial parameters there is 11 an area where you don't have very much data.

12 Whereas, by Latin Hypercube, you would tend to get 13 a better distribution among your input parameters so you 14 would have more confidence in the response surface for the 15 same number of runs. And runs can be in the -- not now as 16 much as they used to be. But they can be expensive. So 17 anything you can do to run fewer runs and still have high 18 confidence is very valuable.

19 That was what was the basis for the development of 20 Latin hypercube.

21 CHAIRMAN JACKSON: But now with workstations --

22 MR. KNAPP: you know, it is interesting that 20 23 yen.rs ago we had models that were right on the ragged edge 24 of what workstations could do and 10 years ago. So even 25 today, as the models are developed with, I think, some very ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

5 23 1 good results/from what has.been done in the last year'or so,.

l 2' Latin hypercube is still a valuable asset.

U 3 CHAIRMAN JACKSON: Let me ask you two last l 4- questions.

5 Can you describe the peer process'for your 4

6 performance assessment program? Peer review.  !

4 7 MR. EISENBERG: Well, of course,-let me talk about ,

8 .high-level waste. There, we have usually a team of' I 9 performance assessment analysts plus other required 11 0- disciplines that are doing.the study. Quite often or  ;

11- universally before it goes out it is given distribution to-12 other-staff that have not been involved for internal peer

^

13' review as well as the. normal management review.

14 We have always issued our performance assessments o 15 for review in public and we published papers on it and peer

-16 reviewed the literature. ,

17 CHAIRMAN JACKSON: And perhaps either Dr. Knapp or 1

'18 Dr. Greeves, you know,- NMSS has done considerable work on i 19 ' expert elicitation in the high-level waste program and so 20 you have obviously developed a strong knowledge base. Have '

21 you passed along any of this to NRR and Research?  !

22 MR. KNAPP: My understanding is that we have and 23 ~are but I would certainly turn to John and Norm to talk 1 i

24- .about specifics.  !

- 25 MR..EISENBERG: Yes. First of all, when we were  ;

i i

ANN RILEY'& ASSOCIATES, LTD. l Court Reporters  ;

1250 I Street, N.W., Suite 300 '

Washington, D.C. 20005 i (202) 842-0034 3

v + -- ,. .

24 1 developing the BTP on expert elicitation, we passed it ,

2 around to all the other offices in the agency and we 3 certainly have made it available to them and they indicate 4 that they use it as it seems to apply in their work and we 5 of course participate in the PRA coordinating committee and 6 the subject comes up there and is discussed.

7 MR. GREEVES: The real key is DOE is using this 8 process, as they indicated this morning. And it has, I 9 think, been a valuable tool.

10 CHAIWWUJ JACKSON: Thank you.

11 MR. GREEVES: I think Norm probably has that later 12 in a slide, too.

13 MR. EISENBERG: Okay, if I could just make one 14 more point on slide seven --

15 CHAIRMAN JACKSON: You're taking a chance.

16 [ Laughter.]

17 MR. EISENBERG: I would say that a distribution of 18 the output is produced and it may be some normalized 19 releases or individual dose, whatever. But because the 20 uncertainties are large for many waste facilities, some 21 realizations will exceed the regulatory limit, almost 22 always. This means that the staff has to provide reasonable 23 but protective limits for compliance and must use 24 appropriate statistical criteria to determine compliance.

25 Given that the performance of the system is represented as a ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

. - - . - - -. . . -. . - . . - . _ - - - . _ _ - . _ _ - . _~_- - - -. ...-_-

25

, 1 distribution.

I s 2. For' examples in the low-level waste PA BTP, l N  !

3 compliance is based on the mean of the distribution'of dose 4 plus there is a cap on the ninety-fifth percentile of the 5- dose cistribution. So that is the kind of thing we will be 1

6- facing here and, I expect,.for decommissioning in the 7 future.

4 8 Slide eight.

9 -The evolution of PA as a programmatic tool can be i

10. described in four stages. Method development began in the 11'
mid '70s with the'same group at Sandia National Labs that 12 was doing the pioneering work on the reactor safety study.

4 13 From that, we got insights into the repository system and it i

, 14 helped to formulate Part 60.

15' Second, we entered a demonstration of capability 16 phase in the mid '80s to early '90s. It helped to identify 17 R&D needs and the need for integration across the various 18 disciplines.

19 We are now in a mode of applying PA to high-level 20 waste. It is an integrated technical basis for interactions 21 with the Department of Energy. It is an input to rule 22 development and it is helping to set NRC program priorities.

23 Another stage that we entered very recently is the 24 high-level waste tools and methods have been adapted for 25 other waste applications and those include things like the s

ANN RILEY & ASSOCIATES, LTD.

Court Reporters i 1250.I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 1

a

. -e-.- .- ,4.' e - -, , , . - . - - . . . , ,. e

- . - - . . . . _ . _ _ - . . . _ ~ _ . _ . . _ _ __ _ _ _ _ _ _ _

t 26

~1. low-level waste performance assessment working group which .

2' started in 1990 and continues to now, the development of the

3 PA branch technical position on low-level waste, 4 demonstration of the-test case and some' applications in SDMP 5 which began in 1995.

6- Slide nine, please. .

7 Performance assessment supports the' Division of 8 Waste Management mission in decommissioning, low-level waste 9 and high-level waste For decommissioning, the goal is

10 evaluation of options for remediation and decommissioning.

11 For most cases, simple analyses suffice. For complex sites, 12 we perform analyses to support the NEPA process.

13 For low-level waste, we are providing guidance and I

14 support for state regulators and are attempting to maintain 15 an NRC review capability.

I 16 For high-level waste, our focus in the proposed 3 17 Yucca Mountain repository, of course. Two main areas of 18 activity are analyses to support high-level waste

, 19 regulations including those for interactions with EPA and 20 interactions with DOE on important stages of the program, 21 viability assessment, recommendation of the site to the ,

22 President and, of course, licensing.

23 Slide 10, please.

24 Now, I am going to begin the description of' 25 performance assessment in the three Division of Waste  ;

ANN RILEY & ASSOCIATES, LTD.

Court Reporters ,

1250 I Street, N.W., Suite 300 Washington, D.C. 20005 .;

(202) 842-0034 '

27 y 1 Management program areas. For decommissioning performance-2 assessment, we try:to fit the analysis method to the problem 3 at hand. As I have said before, simple analyses for simple  ;

l 4 ' problems, complex tools when we have to. l 5 We do a probabilistic treatment to the extent 6 appropriate of source. term which, as'I mentioned before, is l f

7 highly variable for the decommissioning sites, for

-l

} '8 environmental transport and for the dose calculations and 9 the decommissioning PA because it is involved in NEPA has to 10 consider chemical as well as radiological effects.

.11 Slide 11'.

12 Recent progress and plans in decommissioning PA. .

13 We have a draft methodology for performance assessment

14 applied to SDMP sites, we got a draft methodology in January i 15' and will'be briefing the ACNW next week. This methodology 4 16 includes the ability to evaluate sites under the new l 17 decommissioning rule. Those sites which will not be i i

18 releasable for unrestricted use.  ;

19 We have a very preliminary analysis of the no-

t 20 action alternative for Sequoyah Fuels and Sequoyah is being 21 used as a test case to evaluate this draft methodology.

22 We have published a draft.EIS for the Shieldalloy 23 site in 1996. There is a public meeting scheduled for 24 September and a preliminary final environmental impact 25 statement for July. This is an example of the failure of  ;

ANN RILEY & ASSOCIATES, LTD.

Court Reporters

'1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

t

~

28 l' institutional controls. .

i 2 We have a preliminary analysis for Parks Township  :

3 with a plan to publish the draft EIS in July of '97 and the 4 final in March of.'98. That analysis includes a 5 probabilistic analysis of the well location for an intruder.

6 MR. GREEVES: Which the staff is conducting. It 7 is the staff making these calculations.

i 8 MR. EISENBERG: Slide 12.

9 NTa going t o the scope for low-level waste PA, we 10 developed methodo to treat. uncertainty, especially the 11 propagation of parameter uncertainty, developed process-12 level models to describe the. performance-of-various 13 componente and for low-level waste you have the unique thing 14 is the engineered component such as cells and covers.

y 15 We have a flexible overall performance assessment i

16 methodology. It is an iterative approach that links site 17 characterization, design and performance assessment.

18 Individual dose is the compliance end point and to date it 19 has been applied only to hypothetical sites and designs. l i

20 Recent progress and plans, the draft BTP on low-21 level waste performance assessment will be ready for 22 public -- issued for public comment momentarily. The -- we [

23 have assisted in the reviews of the Nebraska low-level waste 24 state regulatory program and plan to participate in the 25 IMPEP review for Texas in June and provided assistance as I

, ANN RISEY & ASSOCIATES, LTD. l

~

Court Reporters 1250 I-Street, N.W., Suite 300 Washington, D.C. 20005  !

(202) 842-0034 1 b

i

- < ~-- - - _ _ - - . - . _ _ - . _ _ _ _ _ - - _ - - _ - _ _ _ _ _ - . _ _ . _ _ _ _ - _ - _ _ _ . .

29 1 called on by states for their low-level waste regulatory 2 program.

3 Slide 14.

4 The scope for high-level waste PA, we have to 5 treat both the undisturbed repository and disrupted 6 repository'with associated probabilities. We have to 7 consider the entire chain of consequence models, if you will 8 recall the earlier chart. In some decommissioning work you 9 can get away with a subset if you make very conservative .

10 bounding assumptions about pieces of the system. In high-11 level waste, we have to look at everything.

12 We do a probabilistic treatment for model 13 parameters and future states which, of course, lead to 14 scenario classes, things like climate change, earthquakes 15 and vulcanism.

16 The potential regulatory changes, that is a new 17 standard based on the current law or on proposed 18 legislation, may reorder the ir.portance of subsystems and 19 issues. For example, currek;.ly proposed legislation and the 20 NAS recommendations both would treat human intrusion as a 21 separate stylized calculation whereas the current standard 22 causes it to be incorporated into the distribution of total 23 system performance. This_ reemphasizes the need for flexible 24 quantitative performance assessment methods.

25 Slide 15.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 1

- ... . - - . - - . . . - . . - -~. ...- ----- - -- .-. .. - - - . .. -....

1 t 30 j i 11 'We haveltwo' slides.offrecent progress and pl'ans.- .

I i- s f 2 .In'May 1996, we had'a~ technical: exchange on DOE's  !

3 latest total? system performance assessment, TSPA-95, which  !

~

4 1resulted in general agreement on the importance of' i

.5 infiltration and establishing the basis - ~having a strong i

6 basis'for' mixing depth assumptions in'the dilution analysis.

I p 7 We have reached general agreement with DOE on the l 8 -use of expert elicitation. The branch technical position 9' was-published in November of '96. DOE adopted the BTP for '

a j 10f their work,-as they indicated in their statement that they 1.1 - gave today, 12 NRC and center staff have been observing the i 12 ongoing expert elicitations on~ volcanism, seismic hazard, f 14 unsaturated flow and other topics as they are progressing.  !

i 15 CHAIRMAN ,TACKSON: Now that the DOE has come out i

)

16 of the mountain, they have completed their principal

]

17 tunneling, I don't know what the status is of the various 1 18 alcoves within the ESF but have you been able to use any of

19 the site-specific data in your models?

]

I 20 MR. EISENBERG: Yes. Maybe the best example is 21 that there has been a long-running controversy over what the 22 infiltration rate is in the Yucca Mountain repository and 23 whether the flow from the surface is localized in fractures

24 or whether it is spread out in the matrix and the chlorine

.25 36 measurements in the tunnel seem to indicate that indeed ANN RILEY & ASSOCIATES, LTD.

Court-Reporters

'1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034 m

i

4 31 1 there are areas where the flow is focused.

2 CHAIRMAN JACKSON: So you have been able to 3 actually fold that into your model?

4 MR. EISENBERG: Yes. And as more information is 5 o available, they are the principal pr'cessors of the 6 information. But as it becomes available to us, we fold it 7 into our models.

8 They have also been gathering information on the 9 structure of the geology in the region, as evidenced also 10 under ground and that has also been folded in.

11 Okay. Slide 16.

12 We have another area of progress that we have 13 provided analysis to EPA for evaluating the implementability 14 of draft rules. We had information exchange meetings last 15 spring. Some summary analyses of this implementability 16 nature were published in the annual report for high-level 17 waste which you heard about yesterday and Wes Patrick spoke 18 to that.

19 We expect to more fully document these analyses in 20 a NUREG coming this year.

21 Finally, we have a more user-friendly total system 22 parformance assessment code. It facilitates use by a 23 broader segment of the staff. We have a beta testing 24 version that was delivered on March 17. It is under review.

25 We are currently running the TSPA code or the total system j i

l ANN RILEY & ASSOCIATES, LTD. '

Court Reporters I 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 l (202) 842-0034

32 1 PA code. We call it the TPA code, on a Sun workstation. It ,

2 was formerly run only on the Cray supercomputer and we 3 anticipate that this rapid local response will facilitate

?

4 the analysis.

5 CHAIRMAN JACKSON: This is the code developed by 6 the center?

7 MR. EISENBERG: Well, it was developed jointly by 8 the center and the NRC staff.

9 Okay, moving into the summary and the look 1

10 forward, first some generic points.

4 11 Guidance on the use of performance assessment, 12 which is, as I claimed, the waste management version of PRA, 13 will consider the complexity, the safety issues, the 14 availability of the data and the capabilities of the 15 licensees and I believe that is consistent with the PRA 16 implementation plan. l l

17 We will continue a program of PA training for the J

~

18 NRC staff. )

19 We have teamed new hires with experienced PA i 1

20 staff. The staff as well as the tools which are the 1 l

21 computer codes and the computer facility are essential  !

22 ingredients to provide a technical basis for making risk-l 23 informet regulatory decisions in the entire wasta management 24 program

  • j 25 Declining funding is a challenge which we are i

l i

ANN RILEY & ASSOCIATES, LTD. I Court Reporters 1250 I Street, N.W., Suite 300  ;

Washington, D.C. 20005 {

(202) 842-0034 l 1

I

33 1 trying to address'by the use of more powerful computing 2 tools and enhanced staff training.

3 Now, for some specifics, in decommissioning, we 4 have tried to achieve a degree of optimization by applying 5 the staff experience in PA, both high level and low level, 6 to the complex decommissioning sites. Under the current 7 regulatory regime and the current schedule, PA is providing 8 analyses for about a third of the complex sites requiring P

9 site-specific environmental impact statements. The 10 remainder of the sites are on backlog.

11 Low-level waste --

12 CHAIRMAN JACKSON: They are on backlog in terms of 13 your being able to provide the analysis.

14 MR. EISENBERG: That's right.

15 CHAIRMAN JACKSON: Because of your resources.

16 MR. GREEVES: Let me jump in a little bit. As you 17 know, there are a large number of these sites. Fortunately, 18 not all of them are the "large" sites but nominally we have 19 about 13 large sites.

20 We are working aggressively on Parks Township, you 21 have heard about that, we have briefed you on that. The 22 Sequoyah Fuels site, we are actively looking at making that

, 23 a trial run on the test case. Another one, the West Valley 24 site is going to be challenging us early on.

l 25 The point is, we have 14 of these sites and we are  !

I i

ANN RILEY & ASSOCIATES, LTD.  :

Court Reporters l 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 ,

(202) 842-0034 l i

34 1 working aggressively on three. I don't know how we would .

2 handle any more than that at any one point in time. So 3 these others are there. The owners of these sites are

4. develeping their plans. If they all come in at once, that's 5 the problem. So we are pretty thin.

6 -

CHAIRMAN JACKSON: You can say that again for the 7 record.

8 MR. GREEVES: The staff is thin. Stretched.

9 [ Laughter.]

10 MR. GREEVES: I would be happy to go further.

11 CHAIRMAN JACKSON: No , that's fine. I think 12 you've gone far enough.

13 [ Laughter.]

14 MR. EISENBERG: On low-level waste, we plan to 4

15 respond to comments on the BTP and finalize ti as resources 16 permit, pursuant to the direction-setting issue number five.

17 COMMISSIONER DICUS: Could I ask you a question 18 about that? Is that, given the fact the resources permit as 19 a qualifier but is that on track or is that going to be ,

20 delayed?

21 The states, I understand, were rather critical 22 about that.

23 MR. GREEVES: Yes, there are some states that have 24 been critical of it. I think the view is mixed. But even 25 at the recent low-level waste forum meeting, a number of the ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

35 l

i states said, where is it. In fact, they would love to have j 2 had us come in, some of them, would love to have us come out 3 and brief at this forum meeting.

4 But when you are working on these sites over here 5 and people are putting in extra hours, it is hard to keep up 6 with the BTP. I would have hoped that we could have gotten 7 it out before this and called it a product. It is right 8 there in terms of going out through the door.

9 But an example, to answer your question, there was 10 also the test case which we wanted to go with the BTP. We 11 can't get the test case done. The documentation is showing 12 how to implement the branch technical position.

13 CHAIRMAN JACKSON: How far behind are you on that, 14 roughly?

15 MR. GREEVES: In which?

16 CHAIRMAN JACKSON: When do you see yourself 17 getting to the point of --

18 MR. GREEVES: I don't see us finishing the test 19 case.

20 CHAIRMAN JACKSON: You don't see finishing it at 21 all?

22 MR. GREEVES: Keith?

23 CHAIRMAN JACKSON: Can you talk about the test 24 case again, Dr. Greeves? They want to --

25 MR. GREEVES: Could I ask Keith to come up to the l

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

36 1 table? 'He is more familiar with it -- .

2 CHAIRMAN JACKSON: Sure.

3 MR, McCONNELL: My name is Keith McConnell. I am 4 the section leader for performance assessment. ,I would say 5 right now we are several months behind on BTP itself. The 6 original SRM that we got asked us to come back to the 7 Commission in August of this year and we are just about 8 ready to go out for public comment, as I have said, and we 9 are looking at a 90-day public comment period. We expect, 10 as people are aware, a significant number of comments and 11 some tough issues to address before we come back to both the 12 ACNW and the Commission.

13 The test case, we have used it, we have used the 14 results of it quite a bit but we are not staffed to do the 15 documentation. I would say that extends into fiscal year 16 '98.

17 MR. GREEVES: This is a program that has 10 to 20 18 FTE back in the early '90s and with the DSI-5, we are at 19 four FTE and, frankly, the West Valley site came in on top 20 of us and it is a real challenge. So it is going to have 21 first bidding in terms of these kind of resources.

22 Mal, do you want to --

23 MR. KNAPP: The only thing I would say is'I don't 24 want to belabor issues which we visited in strategic 25 assessme7t, recognizing things like low-level waste sites by ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

37 1 and large are.being developed in agreementfstates, 2 _ recognizing what our' limitations are and what we are trying 3 to do; ,

4 I_think what we have here is responsive to the 5 spirit of the SRM on'DSI-5. That is the best I can do.  ;

6 COMMISSIONER McGAFFIGAN: The test case,'is that a 7 real case or,what do you mean by a test case? I am just not- -

8 familiar. Is it a low-level waste site, a real site, that  !

9 you'are applying the BTP to? i 10 MR. McCONNELL: It is a hypothetical site.

.11 COMMISSIONER McGAFFIGAN: It is a hypothetical L12 _ site?

13 MR. McCONNELL: It is a hypothetical site for  !

14 humid conditions with a realistic source.

15 MR. KNAPP: Understand it is hypothetical 1

16 deliberately because, were we to pick a real site, there 17 would be implications with our results.

18 CHAIRMAN JACKSON: Okay.

19 MR. EISENBERG: Okay. Slide 19.

20 Clearly, in high-level waste we have moved from a 21 demonstration of PA capability to heavy usage of it in 22 support of programmatic goals. We will invest in

.23 refinements to our computing capability, especially ou,r 24 total performance codes, only to the extent that such 1

25- refinements are expected to have a significant impact on

{

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005-(202) 842-0034

38

'l performance. .

2 Our near-term focus for p3rformance assessment is 3 developing a technical basis'for the new high-level waste 4 rules. Early feedback to DOE on the total system 5 performance assessment for the viability assessment, we have 6 been doing this. We have been attending abstraction 7 workshops and expert elicitations. We plan a technical 8 exchange with DOE, as you heard earlier today, in July on 9 their approach for the total system performance for 10 viability assessment and we expect to receive the PA for 11 viability assessment in September of '98. At the requested 12 budget level, we plan to use PA to help prioritize our KTIs.

13 CHAIRMAN JACKSON: Commissioner Rogers?

14 COMMISSIONER ROGERS: Yes.

15 To what extent are licensees able to use 16 performance assessment for decommissioning, particularly l 17 those sites which are not the biggies that represent an 18 organization with a lot of capability and a lot of 19 resources? Is it a tool that is actually useful for 20 licensees to adopt or is it just something that we have to 21 sort of retain for our own purposes and share basic 22 conclusions from it with licensees.

23 In other words, can they -- you know, it seems to .

1 24 me this has taken us a long time and a lot of hard work to 25 get where we are and I don't quite see how a garden variety t

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

i 39 1 licensee could do it at all-and so'how do we' couple that 2; into the activities of licensees other than to evaluate

'3 their plans when they have'gotten-them together? Is there 4- any way this:can be usedfto assist them in analyzing their

. 5 own sites?

~6 MR. EISENBERG: Well, remember that we are using  :

7 1 performance assessment in a programmatic sense that covers a 8 wide variety of-analytic techniques and at various levels of 9 complexity so I would tend to agree that, for some

~10. facilities, it is inappropriate and the licensees would not '

11 use these very complex tools nor would they try to maintain 4

12 a capability to do so.

13 However, for some of the sites, they are doing ,

14 very complex analyses because that is what the problem calls 15- for. <

16 COMMISSIONER ROGERS: I guess what I am trying to 17 get at, is there any way that this very specialized 18 expertise that we are developing here now could somehow or 19 other be partly digested and fed to licensees so that they 20 could use bits and pieces of it? In other words, through 21 some Nind of guidance or some technical reports or something  ;

22 that they could actually use?

23 MR. GREEVES: Let me try for a minute.

24 This is what I view as a graded process. There 25 are a number of licensees out there now that use the RESRAD ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I, Street, N.W.,. Suite 300 Washington, D.C. 20005 (202) 842-0034

^

40- j 1

1 approach. RESRAD is a code, it's out there,' DOE does .

2 briefings, people go around the country. And our staff uses l

~

3 _RESRAD.. I think what Norm was portraying was, use the 4' simplest tool you can and if you can satisfy the criteria 5 then you're out.

t 6 So we have sites-where we run the RESRAD code, the 7 licensees, they are capable of running that, many of them, #

8 if they hire the right consultant. So'that one is'a fairly 9 first-level type of approach.

10 Separately, we mentioned earlier on, we got this [

11 decommissioning rule that we are expecting to deal-with and 12 we are putting in place guidance on how to deal with that. .

13 So the goal is, within a period of time, that we would have 34 some tools out there, and you probably heard about the D&D 15 code that would allow people to determine what the  :

16 concentration is, if they have a single isotope and is there [

17 a way we can come up with a concentration for that. And 18 then it gets more complicated as you go on. So I think we 19 have between three and four levels. .

20 Most of what Norm was talking about here today was i 21 the fourth level, the third and the fourth level. It is 22 more complicated. The probabilistic distributions, et 23 cetera. There are a couple of levels above that that we do 24 need to get out to the licensees that I think, you know, 4

l 25 within the next year we will have some of that. There are a l

ANN RILEY & ASSOCIATES, LTD.

Court Reporters  ;

1250 I, Street, N.W., Suite 300 Washington, D.C. 20005

'(202) 842-0034 '

i

41 1 few tools like RESRAD out there now and, also, under the 2 action plan, the licensee could come in and use a 30 3 microcurie per gram uranium. He doesn't have to do a 4 performance assessment. What he has to do is go in and do a 5 survey and show he is under 30 micorcuries per gram of 6 uranium or 10 microcuries per gram of thorium. So it is 7 what I call a graded approach to a regulatory process and I 8 think it will be better after we get this guidance out that 9 is coming underneath --

10 CHAIRMAN JACKSON: So you are working on this?

11 MR. GREEVES: Yes, we are. And I would expect the 12 next time we brief you, we will include that.

13 CHAIRMAN JACKSON: Have more to say?

14 MR. GREEVES: Excuse me?

15 CHAIRMAN JACKSON: You will have more to say on 16 that?

17 MR. GREEVES: Yes.

18 CHAIRMAN JACKSON: Commissioner Dicus.

19 COMMISSIONER DICUS: I understand that there have 20 been some differences'in the use of PA between DOE and NRC, 21 particularly like waste package lifetime. I wonder if those 22 differences still existed and, if so, are they particularly 23 significant? Are we going to try to resolve them?

24 MR. EISENBERG: Well, of course, we are trying to 25 resolve them. This is part of the meetings that we attend ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

. ~ .- . . . _ . _. - - - . - . . - . . . . -_- . --

~

5 42 L 1J with them and the technical' exchanges that we have with .{

2- them.  ;

~

3 I think, and Chairman Jackson asked the' question 1

]

4 how the pas for DOE and NRC compare this morning.

1.

5 I would say that there are three' areas that need  !

i 6- to be discussed in terms of comparability. There is the j 7 s results of the performance assessment. That is, the-8 estimates of performance of the system. There is the  !

i 9 overall methodology and approach and how comparable those

'10 are. Then there are the specifics of the models and d

'11 parameters and assumptions that are used to describe the  ;

12 various components of the system, so I think there are those

  • 1 3 i

i 13 three levels.

14 In terms of overall performance, generally we {

15 have, and it is probably because it goes with the territory, I

16 come up with higher doses, worse performance for the system, i 17 'than DOE. Right now, based on the last analyses available, 18 it is one to two orders of magnitude for the average dose in ,

l 19 the undisturbed case. So that is one answer.

20 A second aspect of the answer is that the methods [

21 that are used are quite comparable. They share an awful lot .

J 22 in common. There is a little wrinkle regarding the ,

23 treatment of scenarios and how disruptive events are treated ,

24 but I expect we will be working on ironing that out with 25 them.

4

~

ANN RILEY & ASSOCIATES, LTD.  !

Court Reporters ,

, . 1250.I Street, N.W., Suite 300 Washington, D.C. 20005 ,

(202) 842-0034- t

43 1 The real differences start to arise in the various l 2 areas of assumptions and parameter ranges and models and 1 3 some of the significant differences based on their most 4 recent analysis which, of course, we expect to see some 5 changes in the one for the. viability assessment, is that 6 they placed a lot of reliance on matrix diffusion. That is, 7 they assumed that the flow in the fracture and radio nuclide 8 transport in fractures was tied very heavily and integrated 9 with the flow and transport in the matrix. That had the net 10 result of slowing down the migration of the radio nuclides.

11 We didn't. We didn't assume -- we weren't so 12 positive. So that is a difference that we need to see 13 worked out. There has been an historical difference in 14 assumptions on infiltration rates and, as you heard this 15 morning, we are coming together. They seem to be moving up 16 into the area where we have been.

17 Another area of concern is the potential for 18 dilution and how much dilution you can take credit for at 19 Yucca Mountain and how the entire process works and the one 20 thing we also feel needs to be worked on is the consequences 21 of volcanism. We have made a lot of progress in closing on 22 the probabilities but we need to maybe look some more at 23 consequences.

24 So there are certain areas where there are 25 differences and we expect to continue to pursue that.

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

. [

44 1 CHAIRMAN JACKSON: Commissioner Diaz. .

i 2 COMMISSIONER DIAZ: .On something that you said, ,

3 you said there is one to two orders of magnitude difference between' dose assessment?

4-  ;

5 MR. EISENBERG: Between the expected dose in the

6 undisturbed repository case.

'7 COMMISSIONER DIAZ: Can you give me an idea of ..

8 where they lie in absolute value?

9 MR. EISENBERG: TSPA-95 at five kilometers had l 10 four-tenths of a millirem and NRC doing an analysis for one 11 of these EPA analyses got 23 millirem. F

?.2 CHAIRMAN JACKSON: That is a large difference.

13 Commissioner McGaffigan.

l 14 COMMISSIONER McGAFFIGAN: You may regret making 15 the last remark you did on page 7 but the essence of your 16 remark was when you are dealing with the performance measure ,

i' 17 you end up with the distribution and you end up having to .

18 regulate the mean and the 95 percent confidence interval. 3 19 That set me to thinking about last week's briefings from NRR 20 and the various documents we are about to put out where we 21 are dealing with issues like 10 to the minus 6 probability 22 of core damage frequency and what that really means.

23 Is'there interaction between -- we were looking

, l 24 for things like 95 percent confidence intervals. In fact, I 25 think those words were used by the Chairman last week.

i ANN RILEY & ASSOCIATES, LTD. '

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 ,

, (202) 342-0034 l l

45 1 Is,'it appropriate to use some of these same techniques'in NRR space that you are using in NMSS space?

2 3 That may be the Chairman's question.

4 CHAIRMAN JACKSON: No, you didn't. You are 5 following on my earlier question about sharing.

6 MR. EISENBERG: Well, certainly John Austin has 7_ been participating in PRA coordinating committee and we have 8 been following what has been going on over there. But 9 remember --

10 CHAIRMAN JACKSON: They have been following what l 11 you have been doing I think is really more the question.

12 MR. EISENBERG: We go more directly to the issue

-13 which is what is the dose. You are using surrogates like 14 large early release frequency and things like that.

15 CHAIRMAN JACKSON: Right, but I think the message 16 is you are dealing with this issue of what it means to i 17 regulate the mean at a certain confidence interval. And 18 that is what we have been pressing in reactor space and I 19 think that may be -- he and I talk back and forth, but --

20 COMMISSIONER McGAFFIGAN: That is what I am trying i

21 to get at. It sounds like the technique you have come up 22 with here may have some application there in terms of 23 telling us something about confidence around means. -

24 MR. GREEVES: This is part of the branch technical 25 position and we expect to get some comments on this too.  ;

ANN RILEY & ASSOCIATES, LTD.

Court Reporters 1250 I Street, N.W., Suite 300 Washington, D.C. 20005 (202) 842-0034

46 1 The low-level waste branch is the one that is going to go .

2 out and we may learn something through the comment process.

3 COMMISSIONER McGAFFIGAN: NRR might learn 4 something too.

5 CHAIRMAN JACKSON: Okay, well, thank you very 6 much.

7 The Commission wishes to thank you for an 8 excellent and a very informative briefing. Mr. Eisenberg, 9 you are setting very high standards here. You can never 10 fall from this particular perch on your performance 11 assessment program. And, as I had indicated earlier, these 12 are areas of great importance to the Commission. Evaluation 13 of long-term performance of low-level waste disposal, high-14 level waste disposal and site decommissioning, as you have 15 illustrated so amply is not a simple task. But it would 16 appear that, based on today's briefing, you are really 17 making real progress and have a much better sense of that on 18 developing models that should allow us to characterize site 19 performance.

20 I am particularly struck by the synergy that seems 21 to have developed between the low-level waste program and 22 the SDMP program and you are to be commended for that and 23 that appears to be an excellent approach. It is useful in 1

24 both areas and they can play off each other.

25 So the Commission encourages you to continue to

?

ANN RILEY & ASSOCIATES, LTD.

Court Reporters i 1250 I Street, N.W., Suite 300 l Washington, D.C. 20005 l (202) 842-0034 )

l

.__-__________-_______________-_______J

47

_l 1 develop this program and particularly as you develop the 2 ability to do these assessments on other platforms and, as 3 you have.just heard, to interact and share the knowledge you 4 have gained in this area both with others within the NRC who 5 are developing PRA models as well as on the outside, to the 6 extent it makes sense through the appropriate regulatory 7 guidance. .

8 These kinds of interactions among our staff can 9 improve the final products for all that are involved in 10 these developmental efforts and allow us to potentiate our 11 resources when we have a lot of work, as you have outlined, 12 Dr. Greeves, on our plates but yet are in a budgetarily and 13 a programmatically constrained system. But it has to be 14 optimized.

15 So you might consider further the development of 16 base line regulatory guidance even beyond your branch 17 technical position as well as the simple perhaps modular 18 pieces of your codes or other products that could be used by 19 licensees to expedite the processes, particularly as they ,

20 relate to decommissioning.

21 Thank you.  ;

22 Unless we have further comments, we are adj ourned.

23 [Whereupon, at 3:13 p.m.., the briefing was 24 adjourned.]

.25 i

i: ANN RILEY & ASSOCIATES, LTD.  :

Court Reporters 1250 I' Street, N.W., Suite 300 Washington., D.C. 20005 (202) 842-0034

6N - ' ' ' _- , .'.-NM ' ' ' ' " -- -.--m 666- ,

imqPNMM .#4 EF,5 d aM,N N6DW e s%.554 5WW 4sMM N ' ' '

I 4

6 ,.

d  !

y s f

X.

1 3, i

$ ~l i

I F

W i

i Z I

i l

l' l

I k e .

0 -

1 i

a j

l 1

i .

I k I

l i i

l i I t 4

J

)

'i s

)

i f

+

e I

! 1 l

l.

I 6

4 i

I.

t 4

?

I f

i.

k I

+

P 1

1 2

i I

3 .I. )

b.

t 1

I i

?

' ,i

  • i I

t

3 _

CERTIFICATE  ;

e t

This is to: certify that the' attached description of a meeting of the U.S. Nuclear Regulatory Commission entitled:  ;

I TITLE OF MEETING: BRIEFING ON PERFORMANCE ASSESSMENT  :

PROGRESS IN HLW, LLW AND SDMP - PUBLIC (

MEETING [

PLACE OF' MEETING: Rockville, Maryland DATE OF MEETING: Thursday, May 15, 1997 #

t was held as'herein appears, is a true and accurate record of  ;

the meeting, and that this is the original transcript thereof 1  !

taken stenographically by me, thereafter reduced to ,

typewriting by me or under the direction of the court i reporting company l

Transcriber: _ '( h e1 A ,h, j y d d - A n a7 j

Reporter: Jon Hundley j l

l l

l

s

~

1 t

kB reg *

/ 47 e s o

f-O E

" e '

'Y '

O b**V  ;

STAFF BRIEFING ON THE STATUS OFTHE PERFORMANCE ASSESSMENT PROGRAM Norman A. Eisenberg Office of Nuclear Material Safety and Safeguards i Division of Waste Management U.S. Nuclear Regulatory Commission May 15,1997 (301) 415-7285 NAE @nrc. gov

OUTLINE OF BRIEFING i

I l

L 1.What is Performance Assessment (PA)?

l 2.PA and Probabilistic Risk Analysis (PRA)

3. Scope, accomplishments, and limitations in the use of PA i

- Site Decommissioning Program

- Low-LevelWaste Program

- High-LevelWaste Program

. 4. Summary and look ahead '

2 - -

WHAT IS PERFORMANCE ASSESSMENT?

  • A type of systematic analysis:

1.What can happen?

2. How likely?

3.What are impacts?

  • Integrates information
  • Provides quantitative estimates of performance
  • Performance Assessment is matched to need:

- Deterministic, bounding analyses for most issues

- Probabilistic analyses for more complex: problems, with large uncertainties 3

PA & PRA:

POINTS OF COMPARISON i

i

  • Similar analytic structure ]

= Regulatory framework 1

- PRA is a complement to deterministic requirements

- PA used to demonstrate compliance; may reduce to deterministic for simple problems i

  • Types of uncertainty: parameter, model, scenario
  • Probabilistic Analyses .

- PA and PRA consider likely and rare events .

  • Both are adaptable to hazards and complexity of application .

- Reactors have similar complexity and hazard

- Waste facilities are very diverse 4 . .

PA & PRA

APPROACHES 1

SHARED APPROACHES

  • Structure of analysis

~

I

  • Risk focus Latin-Hypercube Sampling (developed in waste program)
  • Categorization and treatment of uncertainties ASPECTS REQUIRING DIFFERENT APPROACHES 4
  • Continuous versus discrete failure
  • Waste system with natural and engineered components
  • Large dispersed system comprised of many similar components versus single, coherent system
  • Continuously evolving system with overlying failure scenarios versus generally independent failure modes
  • Largely passive system versus many active, redundant safety systems 5

PRA & PA ANALYSIS SEQUENCES i

PRA ANALYSIS SEQUENCE '

i Plant Accideiit Source Systems + Progression + Term + ConeMuence + Risk Analysis Analysis Analysis Anaysis integration i

Leveli Level 11 Levellil PA ANALYSIS SEQUENCE Facility spM m Facility Scenario Source and Facility -

I * + Biosphere +

Description Analysis Term Risk Tmnspod Calculat,on i Analysis Analysis 6 . .

.l

^

PROPAGATION OF INPUT PARAMETER UNCERTAINTY IN PA Scenario i

,, Distribution of Performance i ,onsequence Modeling Measure for Scenario i Model A -+ Model B -+ Model C -+3.g a n a p

input input input Parameters Parameters Parameters Surnmed normalized releases, ForModel A For Model B For ModelC individual dose, or other performance measures hX 1 A 3i,3 kxj,1  : '

( x2 Q xj g xk i

7

b I .

EVOLUTION OF PA AS A PROGRAMMATIC TOOL

  • Method development for HLW (1976-84)
  • Demonstration of capability (19o5-92) .
  • Application to HLW (1992-now) .
  • HLW tools and methods adapted for other ,

waste applications ,

8 - .

I PA SUPPORTS DWM MISSION 4 DECOMMISSIONING:

Analyses evaluate remediation and decommissioning

options . ,
- Simple analyses for most decommissioning

- NEPA analyses for complex sites LLW:

Methods, guidance, and technical support for state regulatory authorities; development of NRC review capability HLW:

Performance assessment of the proposed Yucca Mountain repository:

- Analyses for HLW regulations

- Viability Assessment, Site Recommendation, Licensing 9

'l d

~

DECOMMISSIONING PA: SCOPE i

  • Fit analysis method to the problem:

- simple cases: bounding, deterministic analyses .

- significant issues: complex tools i

+ Probabilistic treatment, to the extent appropriate, of:

- source term

, - environmental transport

- dose calculations  !;

Considers chemical, as well as radiological, impacts for NEPA analyses i

t 10 , ,

. DECOMMISSIONING PA:  ;

i RECENT PROGRESS & PLANS i

  • Methodology developed for PA in support of SDMP  ;

- Draft Methodology - January 1997

- ACNW briefing on Draft Methodology - May 1997
  • Very preliminary analyses of no-action alternative for

, Sequoyah Fuels Corporation facility - April 1997

  • Publish Draft EIS for Shieldalloy Site - July 1996
- Public meeting - September 1996

- Preliminary FEIS - July 1997 l

  • Preliminary analysis for Parks Township i

- Preliminary EIS June 1996 i

- Publish DEIS - July 1997

- Publish FEIS - March 1998 11

i LLW PA:

SCOPE a Developed methods to treat uncertainty i

  • Developed process-level models and codes to describe performance of various system components
  • Flexible overall performance assessment methodology
  • Individual dose is compliance measure
  • To date, applied to hypothetical sites and designs 12 - -

e

LLW PA:

RECENT PROGRESS & PLANS

state regulatory programs Provided technical assistance on particular issues, as requested by state regulatory programs

, 13

i L

HLW PA:

SCOPE
  • Undisturbed repository performance and disruptive events and processes, with associated probabilities i
  • Consider the entire chain of consequence models i
  • Probabilistic treatment for model parameters and future states
  • Focussed on performance of proposed Yucca Mountain repository )
  • Potential regulatory changes may reorder the importance of subsystems and issues; reemphasizes need for a flexible, quantitative i performance assessment tool.

14 - -

HLW PA:

RECENT PROGRESS & PLANS

  • May 1996 Technical Exchange on DOE's TSPA-95 resulted in agreement on (e.g.):

- Importance of infiltration

. - Establishing basis for mixing depth in dilution analysis

  • General agreement with DOE on use of expert elicitation

- Expert Elicitation BranchTechnical Position (November 1996)

! - DOE adopted BTP for their work

- NRC/CNWRA staff observing expert elicitations on

volcanism, seismic hazard, unsaturated flow, etc.
15 .;

--_--_ _ _ _ _ _ _ _ _ _ _ - _ _ - ___ . _ _ _ _ _ - - _ - _ _ _ _ - _ - _ _ _ . _ _ _ _ . . - . . . - ._____-_a

I I

HLW PA: RECENT PROGRESS &

~

i PLANS (CONTINUED)

  • Provided analyses to EPA for evaluating implementability of draft rule

- Information exchange meetings (2/14/96 and 3/20/96)

- Some summary analyses in NRC High-Level Radioactive Waste Program Annual Progress Report (1/97)

- Analyses to be fully documented in 1997 NUREG

  • More user-friendlyTotal System PA code

- Facilitates use by broader segment of staff

- Beta-testing version (delivered March 17,1997) under review

- Currently running Total System PA code on Sun workstation; formerly only run on CRAY supercomputer I

16 . .

l

SUMMARY

AND LOOK FORWARD GENERIC POINTS: i l Guidance on the use of PA (PRA) methods will consider complexity of the safety issues, the availability of data, and l

the capabilities of licensees.

l

  • Will continue a program of PA training for NRC staff .
  • Experienced PA analysts, teamed with new hires, and suitable tools are essential ingredients to provide technical ,

basis for risk-informed regulatory decisions in the waste management program

  • Declining funding is a challenge which is being addressed by the use of more powerful computing tools and enhanced staff training i

, i 17

SUMMARY

AND LOOK FORWARD SPECIFIC PROGRAl%S:

DECOMMISSIONING:

  • Achieve optimization by applying staf? experience in PA to complex decommissioning sites
  • Under current regulations and current schedule, PA is providing analyses for about one-third (1/3) of complex sites requiring a site-specific EIS LLW:
  • Response to comments on BTP and finalization, as resources permit, pursuant to DSI - 5 1

18 . .

I .- '

L

SUMMARY

AND LOOK FORWARD SPECIFIC PROGRAMS (CONTINUED):

I HLW:

  • PA has moved from demonstration phase to utilization
  • Will continue cost-effective improvement in capability
  • Near-term focus:

- Developing technical basis for new HLW rules

- Early feedback to DOE on PA for Viability Assessment

- Staff attendance at DOE Abstraction Workshops and Expert Elicitations - 1996 - present

- Technical Exchange - July 1997

- TSPA-VA - September 1998

- At requested budget level plan to use PA to help to prioritize Key Technical issues 19

.-- . . .