05000423/LER-1996-049-01, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl

From kanterella
(Redirected from ML20141F478)
Jump to navigation Jump to search
Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl
ML20141F478
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/21/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141F482 List:
References
B16501, NUDOCS 9707020419
Download: ML20141F478 (4)


LER-1996-049, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition
4231996049R01 - NRC Website

text

..

l Northeast n, rerry tu (nonte ts6), nerrora. cr 0638, l.

clear b e g M listone Nuclear Power Station i

Northeet Nuclear Energy Cmnpany P.O. Ikx 128 Waterrord, Cr 06385-0128 (860) 447-1791 Fax (860) 444 4277 The Northeast Utilities System l

l June 21,1997 Docket No. 50-423 B16501

)

Re:10CFR 50.73(a)(2)(ii)(B)

L 4

U, S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 j

Millstone Nuclear Power Station Unit 3 Licensee Event Report 96-049-01 Submitted Pursuant to 10CFR 50.73(a)(2)(ii)(B) i This letter forwards Supplement 1 to Licensee Event Report 96-049-00, documenting a condition that was determined at Millstone Unu No. 3 on December 11, 1996.

This LER is submitted pursuant to 10CFR l

50.73(a)(2)(ii)(B).

NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

David A. Smith at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY l

COMPANY l

i r

3, 9

D. HICKS

. Unit Director, Millstone Unit No. 3 020021 9707020419 970621 PDR ADOCK 05000423--

S PDR

U.S. Nucl:ar Regulatory Commission B16501/Page 2 4

1 i

Attachment: 1)

NNECO's commitments in response to LER 96-049-01 2)

LER 96-049-01 i

'l' cc:

H. J.

Miller, Region i Administrator A. C. Cerne, Senior Resident Inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr.. Director, Special Projects i

j i

1 L

5 h

b t

I I

1

Docket No. 50-423 B16501 1

Millstone Nuclear Power Station, Unit No. 3 '

NNECO's Commitments in Response To (LER 96-049-01) 1 l

i i

June 21,1997 P

i l

l

2 l

Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any associated regulatory commitments.

Number

Commitment

Due l

B16501-01 Identified electrical separation deviations will Prior to entry into be corrected or restored to compliance with Mode 4 the design basis.

{

\\

l l

t i

l l

l Docket No. 50-423 l

B16501 l

l i

l t

i i

i I

i

)

Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 96-049-01) 1 i

l l-l l

l l

i i

June 21,1997 3

e a\\

f LE