Forwards Application for Amend to License NPF-3,deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors
ML20141F095
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/24/1997
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141F102 List:
References
2390, NUDOCS 9707020038
Download: ML20141F095 (2)


Text

I i t i

r CENTEMOR l- ENERGY-I I

62000ak Tree Boulevard Mail Address independenceOH PO Box 94661 216-44F3100 Cleveland. OH 4410b4661 Docket Number 50-346 License ' Number NPF-3 Serial Number 2390 June 24, 1997 l

United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001

Subject:

Proposed Modification to the Davis-Besse Nuclear Power Station, Unit Number 1, Facility Operating License NPF-3, Appendix A Technical Specifications to Delete the Requirements for Safety Features Actuation System Containment High Radiation Monitors (License Amendment Request No. 95-0026)

Ladies and Gentlemen:

Enclosed is an application for an amendment to the Davis-Besse Nuclear Power Station (DBNPS) Unit Number 1, Facility Operating License NPF-3, Appendix A, Technical Specifications. The proposed changes involve Technical Specifications (TS) 3/4.3.2.1, Safety Features Actuation System Instrumentation, 3/4.6.1.7, Containment Systems - Containment Ventilation System, 3/4.6.3.1, Containment Systems - Containment Isolation Valves, 3/4.9.4, Refueling Operations - Containment Penetrations, and their associated Bases.

This application proposes to delete the TS requirements for the Safety I Features Actuation System (SFAS) containment radiation monitors (RE's);

require that the containment purge supply and exhaust isolation valves remain closed at all times during Modes 1, 2, 3 and 4 ; delete the TS requirement of verifying that each purge and exhaust automatic valve l actuates to its isolation position on an isolation te' signal; and delete the TS option to use the SFAS containment radiation monitors to provide automatic containment isolation during refueling operations. The associated TS Bases are also proposed to be revised consistent with the j other proposed changes. g I' 9707020038 970624

' .j\6m ,

PDR ADOCK 0500034/.:, {

P PDR

' ~

lllll lilEllilllllWEIOllOI

  • l Operating Componses. 1 Cleveland Electnc lituminating i Toledo Edison t

I I , '

  • Docket Numbar 50-346 Licansa Numbar NPF-3 Serial Number 2390 Page 2 This application is also being submitted to the NRC as a Cost Beneficial Licensing Action (CBLA). The proposed changes will not adversely affect safety. The proposed changes will allow the elimination of maintenance and surveillance costs associated with the radiation monitors, thereby providing for a potential savings of approximately $320,000 over the DBNPS's remaining life.

Toledo Edison requests that the NRC approve and issue this change by I January 2, 1998.

{

Should you have any questions or require additional information, please contact Mr. James L. Freels, Manager - Regulatory Affairs, at (419)321-8466.

Very truly yours, f - 4 MF /1 j Enclosure I

cc: A. B. Beach, Regional Administrator, NRC Region III A. G. Hansen, DB-1 NRC/NRR Project Manager S. Stasek, DB-1 NRC Senior Resident Inspector J. R. Williams, Chief of Staff, Ohio Emergency Management Agency,  ;

State of Ohio (NRC Liaison) l Utility Radiological Safety Board l