ML20141E968

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-295/97-15 & 50-304/97-15 on 970602-06.No Violations Noted.Nrc Recognized That Corrective Actions to Address Previously Identified Radiation Protection Weaknesses Have Only Recently Been Implemented
ML20141E968
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/26/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20141E971 List:
References
50-295-97-15, 50-304-97-15, NUDOCS 9707010256
Download: ML20141E968 (2)


See also: IR 05000295/1997015

Text

_ . _ _ . _ - . _ _ _ _ _ _ _ _ _ _ . . . _ _ . _ _ . . _ _ . . _ _ _ _ . ~ _ _ . . _ _ . _ _ . . _

.

b

-

Od

3

.

June 26, 1997

Mr. John H. Mueller

Site Vice Presidert

Zion Generating Station

Commonwealth Edison Company

101 Shiloh Boulevard

Zion, IL 60099

SUBJECT: NRC ROUTINE RADIATION PROTECTION INSPECTION REPORT NO.

50-295/97015(DRS): 50-304/97015(DRS)

Dear Mr. Mueller:

On June 6,1997, the NRC completed an inspection at your Zion Generating Station, Units

1 and 2. The enclosed report presents the results of that inspection.

The inspection was an examination of activities conducted under your license as they

relate to radiation safety and to compliance with the Commission's rules and regulations

and with the conditions of your license. The inspection consisted of a selective

examination of procedures and representative records, observations, and interviews with

personnel.

Some improvement was identified in aspects of your radiological protection program. The

radiation protect ion staff performed good assessments of radioactive material control and

Unit 2 start-up readiness. Also, your staff took actions to identify radioactive material

outside of the radiologically protected area and to prevent any additional radioactive

material from being released. Improvements in radiation protection oversight of the

Auxiliary Building resulted in some reduction of radiological impediments and improvement

in access to plant equipment. The radiological planning for recovery of a piece of highly

radioactive material from the reactor vessel flange area was good. However, we recognize

that corrective actions to address previously identified radiation protection weaknesses

have only recently been implemented, and we will continue to assess the results of these

actions for long term, sustained improvement in your radiation protection performance.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosure will be placed in the NRC Public Document Room. l

,

)

,

I

!

fN fI

,,/ l

9707010256 970626

sllslippagall

  • i

PDR ADOCK0500g5

G -

.. _ _ _ _ _ _ .- __ .___._ _ ._. _ ___._ ___ ._._ - _ - _ . . _ . . _ . _ _ _ . . _ _ _ _ _ _

4

!* ,

4

i

4

.- J. H. Mueller 2 June 26, 1997

i

$

i

We will gladly discuss any questions you have concerning this inspection.

i

Sincerely,

j /s/ Groffrey E. Grant  ;

i Geoffre) E. Grant, Director )

3 Division of Reactor Projects l

}

! Docket Nos. 50-295;50-304

i;

j Enclosure: Inspection Report 50-295/304/97015(DRS)

cc w/ encl: T. J. Maiman, Senior Vice President,

p Nuclear Operations Division

[ D. A. Sager, Vice President,

i Generation Support ,

j H. W. Keiser, Chief Nuclear

Operating Officer

L R. Starkey, Plant General Manager

l R. Godley, Regulatory Assurance - '

1

Supervisor

l l. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

, Richard Hubbard

i Nathan Schloss, Economist, I

l Office of the Attorney General ,

! Mayor, City of Zion '

i State Liaison Officer, Wisconsin

'

! State Liaison Officer

l Chairman, Illinois Commerce Commission

f

i - Distribution: ,

j Docket File -/enct SR!s, Zion, Braidwood, Rlli Enf. Coordinator w/ encl

i PUBLIC I 1 w/enct Byron w/ encl R. A, Capra, NRR w/enct

j' OC/LFDCB w/enci G. E. Grant, Rill w/enci TSS w/enci

j DRP w/enci LPM, NRR w/enci CAA1 w/enci

!' DRS w/enct A. B. Beach, Rill w/enci

i Rill PRR w/enal C. D. Pederson, Rlll w/enci

,

j

t

}- DOCUMENT NAME: G:\DRS\ZIO97015.DRS

To receive a copy of this document. Indicate in the box 'C' Copy w/o attach /enci "E" = Copy w/ attach /enci "N" = No copy

j OFFICE Rlil:DRS l Rill:DRS L Rlli:DRP l & Rill:DRS l Rlll:DRP l

.

NAME

f,,f,, f f, gf

0

9

N

, LATE 06// g//97 '06/fX/9// OB/g/97 06/ {l/97 0616,f37 -

'

j OFFICIAL RECORD COPY '

I.

$%

W

r.- a en,-s-w,.s - -- - - m e x ~ ~ - - ,-

v -