Forwards Rev 2 to GE MDE-137-0585, Analysis to Extend Operator Action Time for Alternate Shutdown Panels in Support of Fitzpatrick Compliance to App R, Clarifying 850614 Rept & Justifying Exemption from Section III.L.1
ML20141E792
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/17/1985
From: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Muller D
Office of Nuclear Reactor Regulation
Shared Package
ML20141E797 List:
References
JPN-85-90, NUDOCS 8601080330
Download: ML20141E792 (2)


Text

123 Mm Suni Whte Plans, NewVn 10601 914 681.6200

  1. > NewWrkPbwer Memorandum 4# Authority December 17, 1985 JPN-05-90 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington D.C.

20555 Attention:

Mr. Daniel R. Muller Director BWR Project Directorate No. 1 Division of BWR Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Appendix R to 10 CFR 50, Section III.L Exemption Requect Regarding Alternate

, Shutdown capability

Reference:

1.

NYPA letter, J.

C.

Brons to D. B. Vassallo, dated June 14, 1985 (JPN-85-49) regarding the same subject.

Dear Sir:

In Reference 1, the Authority requested exemption from the requirements of Sections III.L.1 and III.L.2.b of Appendix R to 10 CFR 50 to the extent that reactor coolant must remain above the top of the core during use of the alternate shutdown capability.

This request was based on a new analysis that justifies thirty minutes for operator action to institute control from the alternate shutdown panels.

In the attachment included with Reference 1, we summarized the methodology and results of this new analysis.

During a subsequent telephone conversation, NRC staff members requested further details on the new analysis.

Attached is a General Electric report entitled " Analysis to Extend Operator Action Time for Alternate Shutdown Panels in Support of FitzPatrick Compliance to Appendix R" which clarifies and expands on the summary included with Reference 1.

The report reaffirms the conclusions summarized in our exemption request.

k khh0* 951217 CK 05000333 F

PDR

$9h Id l

\\

l l

r If you have any' questions regarding this report or the exemption request, please contact Mr. J. A. Gray, Jr. of my staff.

Very truly yours, I

I-N f~

J hn C. Brons Senior Vice President Nuclear Generation ec:

Office of the Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 136 Lycoming, N.Y.

13093 e

i i

L.

d