ML20141E682

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-456/97-10 on 970403-0602.No Violations Noted
ML20141E682
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 06/26/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
Shared Package
ML20141E686 List:
References
50-456-97-10, NUDOCS 9707010140
Download: ML20141E682 (3)


See also: IR 05000456/1997010

Text

- - - - - -- --. - -- -- - ._.

'

l

.o

Q@

l .

l

t

.

l

l June 26, 1997

l l

l

l

l

Mr. H. G. Stanley

l Site Vice President

Braidwood Nuclear Power Station

Commonwealth Edison Company

R.R. #1, Box 84

Braceville, IL 60407

SUBJECT: NRC INSPECTION REPORT 50-456/97010(DRS)

Dear Mr. Stanley:  ;

On June 2,1997, the NRC completed an inspection at your Braidwood, Unit 1, reactor

facility. The enclosed report presents the results of that inspection.

The inspection included a review of inservice inspection activities and the examination of

steam generator tubes. Your efforts to evaluate tube integrity by assessing growth rates

for outside diameter stress corrosion cracking using historical eddy current data

reviews / comparisons and in situ pressure testing were indicative of an aggressive program.

The decision to provide additional oversight of the contractors' activities and procedures

$ for eddy current examination of the steam generator tubing was considered a program

improvement.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ John ti. Jacobson (for)

John A. Grobe, Acting Director f

Division of Reactor Safety g

Docket No. 50-456 A I

Enclosure: Inspection Report 50-456/97010(DRS)

See Attached Distribution

llllllllNllllllElllRI,Illlllll

'

DOCUMENT NAME: G:\DRS\ BRA 97010.DRS (See Previous Concurrence)

To rocsive a copy of this document, indicate in the box 'C" = Copy w/o attach /enci T = Copy w/ attach /enci "N" = Nopopy

OFFICE Rill:DRS l Rlll:DRS l Rill:DRP l Rill:DRh _ J

NAME Schapker/kjc Gavuta Lanksbury JacopilQf)Iftd, cf

-

DATE 06/ /97 06/ /97 06/ /97 06/f$

OFFICIAL RECORD COPY

%b"(

~

9707010140 970626 *

PDR ADOCK 05000456

D PDR

. - . . .- __.. _ . . ._-- - - - .- -

.

4 <o

-

.

i

!

,

!

.

Mr. H. G. Stanley

Site Vice President

Braidwood Nuclear Power Station

Commonwealth Edison Company

R.R. #1, Box 84

Braceville, IL 60407

SUBJECT: NRC INSPECTION REPORT 50-456/97010(DRS)

Dear Mr. Stanley:

On June 2,1997, the NRC completed an inspection at your Braidwood, Unit 1, reactor

facility. The enclosed report presents the results of that inspection.

The inspection included a review of inservice inspection activities and the examination of

steam generator tubes. Your efforts to evaluate tube integrity by assessing growth rates

for outside diameter stress corrosion cracking using historical eddy current data

'

reviews / comparisons P.nd in situ pressure testing were indicative of an aggressive program.

The decision to previde additional oversight of the contractors' activities and procedures

for eddy current examination of the steam generator tubing was considered a program

improvement.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

John A. Grobe, Acting Director

Division of Reactor Safety

Docket No. 50-456

Enclosure: Inspection Report 50-456/97010(DRS)

See Attached Distribution

DOCUMENT NAME: G:\DRS\ BRA 97010.DRS

'

To receive a copy of this document, indicate in the box 'C" = Copy, w/o attach!enct 'E" = Copy w/ attach /enct "N" = No copy

OFFICE Rlll:DRS ]g Rlli:DRS ,j N Rill:DRP [ Rlli:DRS l

NAME Schapker/kjcJ/L -Gavula y fg LanksburyQ% Jacobson/Grobe

DATE 06//9/97 f/ 06/ g /9{ j" 06/u /97 06/ /97

V OFFICIAL RECORD COPY

. .. . - . - - . _ _ - . . -

,

.

2

.

H. G. Stanley - 2

June 26, 1997

1

cc w/ encl: T. J. Maiman, Senior Vice President,

i Nuclear Operations Division

'. D. A. Sager, Vice President,

! Generation Support

H. W. Keiser, Chief Nuclear

i Operating Officer

-

T. Tulon, Station Manager

j T. Simpken, Regulatory Assurance

'

Supervisor

i 1. Johnson, Acting Nuclear

-

Regulatory Services Manager

i Document Control Desk - Licensing

l Richard Hubbard

i Nathan Schloss, Economist,

l Office of the Attorney General

4 State Liaison Officer

Chairman, Illinois Commerce Commission

l Distribution:

'

Docket File w/enct Rlli PRR w/ encl J. L. Caldwell, Rlll w/enci

PUBLIC IE-01 w/enct SRIs, Braidwood, Byron, Rlli Enf. Coordinator w/enci

, OC/LFDCB w/enci Zion w/ encl R. A. Capra, NRR w/enci

4

DRP w/enct LPM, NRR w/ encl TSS w/enci

DRS w/enci A. B. Beach, Rlll w/ encl CAA1 w/enci

4