Forwards Insp Repts 50-373/97-04 & 50-374/97-04 on 970212- 0516.Because Violations Based Upon Activities Prior to Events Leading to Current Extended Plant Shutdown,Notice of Violation Not Being Issued
ML20141E639
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/26/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Subalusky W
COMMONWEALTH EDISON CO.
Shared Package
ML20141E644 List:
References
50-373-97-04, 50-373-97-4, 50-374-97-04, 50-374-97-4, EA-97-215, NUDOCS 9707010122
Download: ML20141E639 (3)


See also: IR 05000373/1997004

Text

_ . _ ... . _ . ~ .. . - _ . _ _ _ _ _ _ . _ . _ _ _ _ . _ . _ _ . _ _ . _ . _ _ _ . . _ _ . _ . _ , _

.

Qd  !

!

c .  :

'

!

i.

F June 26,-1997

4

1

1~

- EA 97-215 '

h Mr. W. T. Subalusky, Jr.

i- Site Vice President

i

LaSalle County Station )

Commonwealth Edison Company

'

j

!. 2601 Nonh 21st Road

[ . Marseilles, IL 61341

1

1

_ SUBJECT
NRC INSPECTION REPORT 50-373/97004(DRS); 50-374/97004(DRS) AND

EXERCISE OF ENFORCEMENT DISCRETION

! Dear Mr. Subalusky: j

,  !

,. On May 16,1997, the NRC completed an inspection at your LaSalle facility. The enc;osed j

l report presents the results of that inspection.

!

Based on the results of this inspection, the NRC has determined that three violations of

4 NRC requirements occurred. Two violations involving surveillance testing were identified.

Appropriate testing controls and testing acceptance criteria are necessary to ensure that -

testing results are meaningful and can be compared against a valid standard to verify that

,

-equipment will perform satisfactorily during a design basis event. The violation regarding

fire protection is of concern because identification of an adequate safe shutdown path is -

important to ensure that the plant can be safely shutdown in the event of a fire. You

responded to these three issues in.a letter dated December 20,1997. As noted in the

body of this report, we reviewed your corrective actions to these issues and consider them

acceptable.

However, because these violations were based upon activities prior to the events leading

to the current extended plant shutdown and satisfy the criteria in Section Vll.B.2,

" Violations identified During Extended Shutdowns or Work Stoppages," of the " General

-Statement of Policy and Procedures for NRC Enforcement Actions" (Enforcement Policy),

NUREG-1600, a Notice of Violation is not being issued.

t

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practices," a copy of this letter,

and its enclosure, will be placed in the NRC Public Document Room. y)

\

9707010122 970626

,,,

15lllll1150E1.Hllll

- .-

Sco\

gDR ADOCK 05000373

PDR

. %n. -_ ,

_. -- . - __- .,

.

W. Subalusky 2 June 26, 1997

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ John M. Jacobson (for)

John A. Grobe, Acting Director

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure: Inspection Report 50-373/374/97004(DRS)

cc w/ encl: T. J. Maiman, Senior Vice President,

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

F. Dacimo, Plant General Manager

P. Barnes, Regulatory Assurance ,

Supervisor

1. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/enci SRIs, LaSalle, Dresden, Rlli Enf. Coordinator w/enci

PUBLIC IE-01 w/ encl Quad Cities w/enci TSS w/enci

OC/LFDCB w/enct LPM, NRR w/enci CAA1 w/ encl

DRP w/ encl A. B. Beach, Rlll w/enci J. Lieberman, OE w/enci

DRS w/enci J. L. Caldwell, Rlll w/enci J. Goldberg, OGC w/encI

Rlli PRR w/enci R. A. Capra, NRR w/enci R. Zimmerman, NRR w/ encl

SEE ATTACHED CONCURRENCES ,

DOCUMENT NAME: G:\DRS\LAS97004.DRS /

To recilve a copy of this document, Indicate in the box: "C" = Copy w/o attachment / enclosure "E" = Copy with attachment /enclosur,e "N" =M copy

OFFICE Rill:DRS~ l Rlli:DRS l Rlll:DRP l Rill:EICS , J ,j

_ Ril):AMl

NAME Duncan/kjc Ring Parker Claytdo)pfgpy[g JapdbWQ/ probe

DATE 05/ /97 05/ /97 05/ /97 06 ppa 97'

'

064p97 q

'

OFFICIAL RECORD COPY

_ _ __ _ __. _ _ _ _ . _

.

.

W. Subalusky 2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

John A. Grobe, Acting Director

Division of Reactor Safety

Docket Nos. 50-373: 50-374

License Nos. NPF-11; NPF-18

Enclosure: Inspection Report 50-373/374/97004(DRS)

cc w/ encl: T. J. Maiman, Senior Vice President, )

Nuclear Operations Division

D. A. Sager, Vice President, l

'

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer l

F. Dacimo, Plant General Manager

P. Barnes, Regulatory Assurance

Supervisor

1. Johnson, Acting Nuclear

Regulatory Services Manager

Document Control Desk - Licensing

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

Distribution:

Docket File w/enct SRis, LaSalle, Dresden, Rlli Fnf. Coordinator w/ enc!

PUBLIC IE-01 w/ encl Quad Cities w/enci TSS w/enct

OC/LFDCB w/enct LPM, NRR w/ encl CAA1 w/ encl

DRP w/enci A. B. Beach, Rlli w/enct J. Lieberman, OE w/enci

DRS w/enci J. L. Caldwell, Rlll w/ encl J. Goldberg, OGC w/enct

Rill PRR w/enci R. A. Capra, NRR w/ encl R. Zimmerman, NRR w/ encl

SEE ATTACHED CONCURRENCES

DOCUMENT NAME: G:\DRS\LAS97004.DRS

Ta no;lve e copy of this document, indicate in the box: "C" = Copy w/o attachment / enclosure "E" = Copy with attachment / enclosure *N" = No copy

OFFICE Rill:DRS (, Rlli:DRS lE Rlll:DRP lg Rlll:EICS l Rill:DRS l

NAME Dgncan/kje f Ring */pg Parher jgf"F Clayton Jacobson/Grobe

DATE Og/y /97 0$/1/97 grp7,q /97 05/ /97 05/ /97

OFFICIAL RECORD COPY