Forwards Insp Rept 70-7001/97-202 on 970324-0418.No Violations Noted
ML20141E630
Person / Time
Site: 07007001
Issue date: 05/15/1997
From: Ting P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: John Miller
UNITED STATES ENRICHMENT CORP. (USEC)
Shared Package
ML20141E634 List:
References
70-7001-97-202, NUDOCS 9705210073
Download: ML20141E630 (2)


Text

n at:u

~'

. ,e 1 UNITED STATES +

g {' NUCLEAR REGULATORY COMMISSION g g wAsHINoToN. D.C. 2000H001 ,

%, e# May 15, 1997 j

1 Mr. J. H. Miller 4 Vice President - Production United States Enrichment Corporation .

Two Democracy Center 6903 Rockledge Drive 4

Bethesda, MD 20817  ;

SUBJECT:

NRC INSPECTION REPORT 70-7001/97-202

Dear Mr. Miller:

This refers to the chemical process safety inspection conducted from March 24 to j April 18,1997, at the Paducah Gaseous Diffusion Plant. The purpose of the inspection was to determine the effectiveness of the facility's chemical process safety program. At the conclusion of the inspection, the findings were discussed with Mr. Steve Polston, General Manager, and members of his staff.

Areas reviewed during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of facility walk through, selective examinations of procedures and records, interviews with personnel, and observations. Based on the results

, of this inspection, no violations of NRC requirements were identified.

At the exit meeting, the inspectors noted that the plant had not adequately implemented l the Job Hazard Analysis (JHA) program, as documented in a plant procedure. This  !

deficiency was noted to plant personnel including General Manager, Mr. Steve Polston.

Based on these noted deficiencies, Mr. Polston and his counterpart at Portsmouth committed to update the JHA program at both facilities. The specifics of this commitment j are outlined in the report, and the completion of this commitment will be tracked by NRC  !

as an inspector Follow-up Item (IFI).

I

/  !

ivFt m iso NRC FILE CENTER COPY

)

9705210073 770515 , i PDR ADOCK 07007001 ( 1 C PDR g l

l

d 4

Mr. J. H. Miller . ,

in accordance with the NRC's " Rules of Practices," a copy of this letter and its enclosure will be placed in the appropriate NRC Public Document Rooms. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Originals signed by Walter S. Schwink for/

Philip Ting, Chief Operations Branch  ;

~

Division of Fuel Cycle Safety and Safeguards. NMSS Docket No. 70-7001

Enclosure:

As stated cc: S. A. Polston, Paducah General Manager e W. E. Sykes, Paducah Regulatory Affairs Manager D. l. Allen, Portsmouth General Manager ,

R. W. Gaston, Portsmouth Regulatory Affairs Manager R. M. De Vault, DOE DISTRIBUTION w/ enclosures: i D Docket File 70-70017 Case File PDR,LPDR  !

FCOB r/f FCSS r/f NMSS r/f f MHorn, FSPB KO'Brien, PGDP SRI MRodgers, PMDA TReidinger, Rill RPierson, FSPB DOCUMENT NAME: PDGP.202 OFFICE FCOB G, FCOB 6 FCOB 6 NAME GSmith:th h WSNwink PTing (T)

DATE ( A(/97 ( //997 5'//f/97 / /97 C = COVER E = COVER & ENCLOSURE h = NO COPY OFFICIAL RECORD COPY I

4 4

6 i

!