ML20141E286

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519 & Notice of Violation.Violation Involved Failure to Translate Correctly Plant Design Basis Into Drawings & to Implement Appropriate Administrative Controls
Date released: 06/03/2020 Download: ML20141E286


Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519.Violations Noted.Major Areas Inspected: Operations,Maintenance,Engineering & Plant Support
ML20141E341
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20141E341 (102)
Notice of Violation from Insp on 970311-0519.Violation Noted:Since Commencement of Operations at Unit 1,applicable Regulatory Requirements & Design Basis Not Correctly Translated Into Drawings & Procedures
ML20141E310
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
Download: ML20141E310 (2)
Forwards Insp Repts 50-245/97-02,50-336/97-02 & 50-423/97-02 on 970311-0519 & Notice of Violation.Violation Involved Failure to Translate Correctly Plant Design Basis Into Drawings & to Implement Appropriate Administrative Controls
ML20141E283
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/24/1997
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: KENYON B D
NORTHEAST NUCLEAR ENERGY CO.
References
Download: ML20141E283 (4)