ML20141D790
| ML20141D790 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 05/09/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20141D795 | List: |
| References | |
| 50-346-97-04, 50-346-97-4, GL-96-01, GL-96-1, NUDOCS 9705200204 | |
| Download: ML20141D790 (2) | |
See also: IR 05000346/1997004
Text
. _ .
__
_.____ . . _ .
_
__
_
Puhac
.
%- 01
-
!
l
May 9,1997
Mr. John K. Wood
Vice President - Nuclear
Davis-Besse Nuclear Power Station
l
Centerior Service Company
5501 North State Route 2
Oak Harbor, OH 43449
SUBJECT:
NRC INSPECTION REPORT NO. 50-346/97004(DRP) AND NOTICE OF
VIOLATION
Dear Mr. Wood:
On April 14,1997, the NRC completed an inspection at your Davis-Besse site. The
enclosed report presents the results of that inspection.
Overall, we noted Improved procedure usage and adherence by both operations and
maintenance personnel during this inspection period. Good material condition of important
standby systems was also noted.
However, a violation of NRC requirements was identified during this inspection. The
violation involved a failure to perform, as required by technical specifications, monthly
relay testing of essential bus loadshed and emergency diesel generator start functions.
Although NRC-identified, we recognize that your staff took prompt and appropriate
corrective action once the problem was identified to them. We also acknowledge the fact
that you are implementing a systematic review of technical specification related
instrumentation in response to NRC Generic Letter 96-01, by which similar problems
should be identified and corrected.
The violation is cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding the violation are described in detailin the enclosed report. The NRC has
concluded that information regarding the reason for the violation, the corrective actions
/
taken and planned to correct the violation and prevent recurrence is already adequately
addressed on the docket in the attached report. Therefore, you are not required to
respond to this letter unless the description therein does not accurately reflect your
corrective actions or your position on this matter. In that case, or if you choose to provide
additional information, you should follow the instructions in the enclosed Notice.
l
l
.
l
9705200204 970509
~
f
ADOCK 05000346
lll lll llll llllllllllllllj llIlll
inn inn siiplanillaisilipii
1llIlH.1
G
. . . . o r
. . . . . . . . . . . . . . . . . . . . . . . . . . .
_.
_ _ . . . _
. . _ _ _ _ _ _ . . _ . _ . _ _ . _ _ , . . _ _ _ _ _ _ _ . _ . _
. . - . . - _
,
.
^,
J. K. Wood
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
'
and its enclosures will be placed in the NRC Public Document Room.
Sincerely,'
/s/ J. A. Grobe for
James L. Caldwell, Director
Division of Reactor Projects
Docket No.: 50-346
License No.: NPF-3
Enclosures:
1.
'
2.
Inspection Report
No. 50 346/97004(DRP)
cc w/encis:
John P. Stetz, Senior
Vice President - Nuclear
J. H. Lash, Plant Manager
J. L. Freels, Manager
Regulatory Affairs
State Liaison Officer, State
of Ohic
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio,
Public Utilities Commission
Distribution:
Docket Fiie w/ encl
PUBLIC IE-01 w/enci
DRP w/enci
OC/LFDCB w/ encl
SRI Davis Besse w/ encl
Project Manager, NRR w/ enc!
A B. Beach, w/enct
Rill Enf. Coordinator, w/ encl
Deputy RA, w/ encl
CAA1 w/enci (E-mail)
Rlli PRR w/enci
TSS w/ encl
DRS (2) w/enci
i
DOCUMENT NAME: G:\\DAVI.lG\\DAV97004.DRP
To receive a copy of thle docW,Indcate in the box *C* = Copy without attach /enci *E* = Copy with attach /enct *N* = No copy
,(Nky
- Rllin nf
Rlll
% A
,
OFFICE
Rlli
ESchh h :hjb JJaho
/
J
f
NAME
[DATE
05/hh7]
05/h7) Y
05/f/97
j
OFl:lCIAL RECORD COPY
'
i