ML20141D727
| ML20141D727 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/23/1997 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20141D732 | List: |
| References | |
| NUDOCS 9706270321 | |
| Download: ML20141D727 (1) | |
Text
...
~.
.- ~
Strtion Cupport D pirtm:nt
_ i._
==.-
PECO NUCLEAR eeme-vc -,
905 chesterbrook Boulevard A Unit of PECO Energy Wayne, PA 19087-5691 June 23,1997 Docket Nos. 50-277 50-278 Licente Nos. DPR-44 DPR-56 U. S. Nuclear Regulatory Corrission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Changes to Technical Specifications Bases
Dear Sir:
In accoroance with the requirement of Peach Bottom Atomic Power Station (PBAPS) Units 2 and 3, Technical Specification 5.5.10.d, PECO Energy Compary hereby subraits all Unit 2 and Unit 3 Technical Specifications Bases changes through Unit 2 Bases Revision 11 and Unit 3 Bases Revision 11. The enclosed Bases reflect changes through May 1997, thereby satisfying the frequency requirements of 10CFR50.71.
If you have any questions or require further information, please contact us.
Very truly yours, G. A. Hunger, Jr.
Director-Licensing
/
JLP/bgr
Enclosure:
g/ 'h() h 1.
PEMS Unit 2 Bases 2.
PBAPS Unit 3 Bases oc:
H. J. Miller, Administrator, Region I, USNRO (w/ enclosure)
W. L. Schmidt, Senior Resident inspector, PBAPS, USNRC (w/o enclosure) i l
hh ecce'n,
9706270321 970623 PDR ADOCK 05000277 P