May 15, 1997
l
l
l
' Mr. S. A. Petulski
l
Site Vice President
.
l
Point Beach Nuclear Plant
l
Wisconsin Electric Power Company
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT:
RESPONSE LETTER REGARDING OPERATOR LICENSING EXAMINATION
REPORTS NO. 50-266/96303(OL); 50-301/96303(OL)
Dear Mr. Patuiski:
The NRC received your letter dated April 30,1997, in which you requested an extension
,
to complete the clarification of Technical Specification 15.3.7 bases. You had previously
'
committed to complete this action by May 1,1997,in your response dated February 24,
1997, to the Notice of Violation contained in Reports No. 50-266/96303(OL); 50-
301/96303(OL).
We understand that due to newly identified issues that have higher priority and the
adequacy of Technical Specification 15.3.7.B.i, cornpletion of Technical Specification
15.3.7 bases clarification will be deferred until June 30,1997. We find this extension
acceptable.
Sincerely,
/s/ Cynthia D. Pederson
Cynthia D. Pederson, Director
Division of Reactor Safety
)
Docket Nos. 50-266; 50-301
1
Enclosure:
Ltr 4/30/97 S. A. Patuiski,
Wisconsin Electric Power Company
to USNRC, w/enci
'
i
DOCUMENT NAME: G:DRS\\ pol 051[7 DRS
(SEE PREVIOUS CONCURRENCE)
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
0FFICE
RIII
RIII
l
RIII / PF
RIII
l
NAME
JLennartz:jp
MLeach
CPede't's6n
-
DATE
05/
/97
05/
/97
0' / /5'/97
05/
/97
a
0FFICIAL RECORD COPY
000AA%
kllfl h hllf
l
9705200155 970515
ADOCK 05000266
' o
V
~ . .
.
. , _
.
. _ .
_.____._ _ . _ . _ _ _ . . _ . . . _ _ _ _ _ _ . . _ _ _ _ _ . .
_ _ _ . _
l
r
Mr. S. A. Patuiski
l
Site Vice President
Point Beach Nuclear Plant
]
Wisconsin Electric Power Company
6610 Nuclear Road
Two Rivers, WI 54241
'
SUBJECT:
RESPONSE LETTER REGARDING OPERATOR LICENSING EXAMINATION
REPORTS NO. 50-266/96303(OL); 50-301/96303(OL)
Dear Mr. Patuiski:
l
i
The NRC received your letter dated April 30,1997,in which you requested an extension
!
to complete the clarification of Technical Specification 15.3.7 bases. You had previously
l
committed to complete this action by May 1,1997,in your response dated February 24,
1-
1997, to the Notice of Violation contained in Reports No. 50-266/96303(OL); 50-
l
301/96303(OL).
t
i
,
s
L
We understand that due to newly identified issues that have higher priority and the
I
l
adequacy of Technical Specification 15.3.7.B.I, completion of Technical Specification
i
15.3.7 bases clarification will be deferred until June 30,1997, and we will allow this
!
extension.
Sincerely,
'
l
Cynthia D. Pederson, Director
l
Division of Reactor Safety
l
Docket Nos. 50-266; 50-301
l
Enclosure:
Ltr 4/30/97 S. A. Patuiski,
Wisconsin Electric Power Company
!
to USNRC, w/enci
!
DOCUMENT NAME: G:DRS\\ pol 051_7.DRS
To receive a copy of this document, indicate in the box: "C" = Copy without
!
attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
RIII
l# RIII
lv RIII-
RIII
l
.
NAME
JLennartz:jp)d-
MLeach
/h4
CPederson
"
DATE
105/ N /97
05//s '/97
05/
/97
05/
/97
0FFICIAL RECORD COPY
l
-
. . .
-
.
-
.
.
. - . .
.
. -- __
.
-
-..
.
,
i
.
S. A. Patuiski
-2
May 15, 1997
j
l
1
l
cc w/o encl:
R. R. Grigg, President and
{
Chief Operating Officer, WEPCo
A. J. Cayia, Plant Manager
i
cc w/ encl:
Virgil Kanable, Chief, Boiler Section
Cheryl L. Parrino, Chairman,
Wisconsin Public Service Commission
l
State Liaison Officer
Distribution:
Docket File w/enct
Rill PRR w/enct
Rill Enf. Coordinator w/enci
'
PUBLIC IE-42 w/enci
SRI, Pt. Beach w/ encl
TSS w/enci
l
OC/LFDCB w/enci
LPM, NRR w/ encl
CAA1 w/enci
i
DRP w/enci
A. B. Beach, Rlli w/enci
I
DRS w/enci
J. L. Caldwell, Rlli w/enci
!
I
!
l
l
.
,
l
I
'
!
1
i
'
!
.,
l
t
I
v sd
,9%
,
,
.
M
.
g
Electnc
u
.
POWER COMPANY
pQ
f-
'y
Point Beach Nuclear Plant
(414) 755 2321
6610 Nuclear Rd.. Two Rivers. WI 54241
NPL-97-0210
April 30,1997
Document Control Desk
US NUCLEAR REGULATORY COMMISSION
Mail Station PI-137
Washington DC 20555
Ladies / Gentlemen:
DOCKETS 50-266 AND 50-301
INSPECTION REPORT NOS. 50-266/96303( O L k 50-301/96303(O L )
POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2
By letter dated January 23,1997, the NRC forwarded to Wisconsin Electric Power Company NRC
Inspection Reports Nos. 50-266/96303(OL); 50-301/96303(OL). Enclosed with the inspection reports
was a Notice of Violation related to a plant procedure that aligned the Vital DC Electrical System to a
configuration for which it was not designed. We issued a reply to the Notice of Violation in our letter
NPL 97-0050 dated February 24,1997.
In our reply, we committed to revise the abnormal operating procedure AOP-0.0 to ensure that a battery
charger does not power a DC bus without a battery connected to the bus. Based on the performance
limits of the PBNP battery chargers, the connection of a battery is necessary to buffer the DC output
su'fficiently to ensure the quality of DC power. These procedure changes were issued on April 11,1997.
We now believe that our procedures adequately implement the Technical Specifications and specifically
address the abnormal configuration described in the inspection report,
in our reply, we also committed to clarify the Bases of Technical Specification 15.3.7 to ensure that the
aforementioned battery charger performance limits are explicitly stated. We committed to complete this
change by May 1,1997. However, during the past month, we have assessed the priority of this task with
respect to newly identified issues that are more safety-significant, and have deferred the completion of
this task until June 30,1997. Based on the adequacy of the Technical Specification (15.3.7.B.i), and the
noted revisions to abnormal operating procedure AOP-0.0, we believe that the clarification may be so
deferred without any risk to the health and safety of the public.
!
g 06 199i
4 g g g aff
.
.IPL-97-0210
April 30,1997
Page 2
Please contact us if you have any questions or desire additional information.
Sincerely,
eh
.
-
Douglas F. Johnson
Manager - Regulatory Services
,
& Licensing
GDA