ML20141D340

From kanterella
Jump to navigation Jump to search
Forwards Revised Page 3 to COLR for Cycle 18 Submitted on 970429.Correction Reflects References Consistent W/Suppl Reload License Rept,Rev 1 That Was Submitted as an Attachment to Ltr to Support Cycle 18 Operation
ML20141D340
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/13/1997
From: Graham P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141D346 List:
References
NLS970102, NUDOCS 9705200072
Download: ML20141D340 (2)


Text

'

P.O. 00X 8 A NEB 68321 Nebraska Public Power District

  • !M&=""

_r_.____

NLS970102 May 13,1997 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Revised Page 3 of Core Operating Limits Report (COLR)

Cooper Nuclear Station, NRC Docket 50-298, DPR-46 The Nebraska Public Power District (the District) hereby requests that page 3 to the original COLR that was submitted as an attachment to the letter (NLS970072) dated April 29,1997, for Cycle 18 operation of CNS, be replaced by the revised page 3 attached to this letter.

The purpose of this revision to page 3 of the COLR is to reflect the references consistent with the Supplemental Reload License Report (SRLR), Revision I that was submitted as an attachment to the letter (NLS970099) dated May 9,1997, to support Cycle 18 operation at CNS.

This revision accounts for the following changes in Section 3.0 (References) on page 3 of the COLR:

(1)

NEDE-24011-P-A-13 (Reference 1) has been changed to NEDE-24011-P-A-13-US.

(2)

Supplemental Reload License Report for Cooper Nuclear Station Reload 17, Cycle 18,24A5399, Revision 0 (Reference 2) has been changed to Revision 1.

The above mentioned changes do not have any impact on the content and results of the rest of the COLR for Cycle 18 operation at CNS.

l

\\

/M 200032

,.h,fjh f ' jf [';f' J.['

I 9705200072 970513 iiiJ I

PDR ADOCK 05000298 P

POR f,bNk[hbhkkhkkNNbM 3

bkkEhbbhb 2

n,========w

===== = a

g

~_

kfi~.

+

d NLS970102-May' 13,1997 Page 2 of 2.

Should you have any questions concerning this matter, please contact me.

l 1 Sincerely, i

lg P.' D. Graham

< Vice President - Nuclear

/gs Attachment cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident inspector

.USNRC NPG Distribution t

1-f l

3 1

)

l

.