ML20141D314

From kanterella
Jump to navigation Jump to search
Forwards Draft Ltr Rept Covering Changes to Facility 1990 building-wake Diffusion Model That Have Been Made in Response to 940510 Peer Review
ML20141D314
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/23/1994
From: Ramsdell J
Battelle Memorial Institute, PACIFIC NORTHWEST NATION
To: Jun Lee
NRC (Affiliation Not Assigned)
Shared Package
ML20141D306 List:
References
NUDOCS 9705200063
Download: ML20141D314 (1)


Text

,

. _. _ _... _.. _ _.. _ _ ~.

OBallelle Pacific Northwest Laboratorie sanelle Soulesard P.O. Son 999 RicMand Mashington 91352 telephone (509) T/6 8626 3

August 23, 1934 i

Jay Y. Lee Office of Nuclear Regulatory ResearchDivision of Radiation Saf

)

U.S. Nuclear Reguistory Coannission Washington, D.C. 20555

Dear Jay:

Attached is a draft letter report covering chandiffusion mo

\\

review.

in the immediate vicinity of the releaseThe report also compares conce o the May 10, 1994 peer made for locations concentrations estimated using minianam-dilutions modelspoint using the revis 2 believe that the changes to the model are fully recessnandations and concerns expressed by the reviewers responsive to the comparison of revised model concentration predictions with d In addition, the predictions of models indicates that the revised model m concentrations in the Launediate vicinity of the release p iay be used to ata and A copy of this draft report will be sent to each of o nt.

ecmsnent.

Copies of the report will also be sent to Fthe peer reviewers for and J. Fairobeat for consnent.

. Gifford reviewer's comments on this draf t along with my responseThe final letter re If you have any questions, please call me Sin erely, James V. Ramsdell Senior Research Scientist Maltimedia Exposure Assessment Group EARTM AND ENVIRONMENTAL SCIDiCES CENTER

  1. VR/19 e

Oe DC.0ENE 2 LkgDC()