ML20141D000
| ML20141D000 | |
| Person / Time | |
|---|---|
| Issue date: | 06/04/1997 |
| From: | Mearse S, Watkinson L NRC OFFICE OF ADMINISTRATION (ADM), SONALYSTS, INC. |
| To: | |
| References | |
| CON-FIN-E-8293, CON-NRC-26-96-261 NUDOCS 9706260205 | |
| Download: ML20141D000 (2) | |
Text
.
i bd
- 1. M IRAM I ME F PAGES AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT PAIE REC'D DC 01/03/97 l
3
- 2. AMENDMENT / MODIFICATION NO.
- 3. EFFECTIVE DATE
- 4. REQUISITION / PURCHASE REQ. NO.
$. PROJECT NO.
(!f applicable)
TWO (2) m 041R RFPA# AED 96-261, DTD 12/20/96 AED962611
- 6. ISSUED BY CODE
- 7. ADMINISTERED BY CODE I (if other than item 6)
U.S. Nuclear Regulatory Comission Div. of Contracts & Property Mgmt.
Contract Management Branch No. 3 MS T-7 1-2 Washington, DC 20555
- 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP code) 9A. AMENDMENT OF SOLICITATION NO.
SONALYST, INC.
215 PARKWAY NORTH
- 98. DATED (SEE ITEM 11)
WATERFORD, CT 06385 PRINCIPAL INVESTIGATOR / TECHNICAL CONTACT: LAVERIA SANDERS 10A, MODIFICATION OF CONTRACT / ORDER NO.
TELEPHONE: (860) 442-4355 x
NRC-26-96-261 108. DATED (SEE ITEM 13)
CODE I FAClllTY CODE
- 11. THIS ITEM ONLY APPLIES TO AMENDNENTS OF SOLICITATIONS O The above numbered solicitation is amended as set forth in item 14.
The hour and date specified for receipt o' Offers O is extended, p is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the,following methods: (a) By completing items 8 and 15, and returning copiesoftheamendment;(b$Byacknowledgingreceiptofthisamendmentoneachcopyofthe offer submitted-or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECElVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change en offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amen &ent, and is received prior to the opening hour and date specified.
- 12. ACCOUNTING AND APPROPRI ATION DATA (if required)
B&R# 782-15-11-65-05 FIN # E8293 APPN# 31X0200.782 BOC: 252A AMOUNT OBLIGATED: S35,542.00
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14 A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT /ORDEli IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTh0RITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
MUTUAL AGREEMENT OF BOTH PARTIES D. OTHER (Specify type of modification and authority)
X BILATERAL-Subsection C.3.1.f CFR Self Study Quizzes Subsection C.3.3 Future Requirements-Specialized Course Dev.
E. IMPORTANT: Contractor O is not, 9 is required to sign this docunent and return 2
copies to the issuing office.
- 14. DESCRIPTION OF AMENDMENT / MODIFICATION (Organized by UCF section headings, including solicitation / contract subject matter where feasible.)
SEE THE ATTACHED PAGES O
rhl
\\
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed remains unchanged and in full force and effect.
a SA. NAME AND TITLE OF SIGNER (Type or print) 16A, NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
V d
MM2
/)
C!
15s. C CTOR/nF M hR 15C. DATE SIGNED 168. UN D STATES AME I A 16C. TE SIGNED
/
BY h'
A M nat#re of person authorized to sign) [e!// @
/(SignatureofContractingOfficer)
NSN /540-01-152-8070 30-105 STANDARD FORM 30 (REV 10 83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243 hlhlhhlhhhhhhh 9706260205 970604 PDR CONTR
==>c a c -
NRC-26-96-261 PDR
i NRC-26 96 261 Modification No. 2 Page 2 of 3 l
l The purpose of this modification is to increase the obligated amount of the subject contract by $35,542.00 from $248,649.00 to $284,191.00 to allow for the update of the CFR Self Study Quizzes for FY 97 in accordance with Subsections C.3.1.f and C.3.3 of the contract.
i i
Accordingly, the contract is hereby modified as follows:
1.
Under Subsection B.3 Items and Prices, CLIN 0007 is deleted in its entirety and the following is substituted in lieu thereof:
"0007 Specialized Course Development and Presentation C.3.3.) and CFR Self Study Quizzes CEILING (C. 3.1. f) 1 1ot
$50,689 0007A FY 1997 CFR Self-Study Quiz Update (Firm Fixed Price $35,542)
Professional (600 estimated hrs)
Oversight
$74.67 hr @
42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Technical
$67.30 hr @
550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> Consultant
$39.44 hr @
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Non Professional (300 estimated hrs)
Clerical
$32.57 hr @
250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> Graphics
$41.61 hr 0 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br />" 2.
Under Subsection B.4. Consideration and Obligation Delivery Orders (JUN 1988) Paragraph b is deleted in its entirety and the following is substituted in lieu thereof:
"(b) The amount presently obligated with respect to this contract is
$284,191.00. The Contracting Officer may issue orders for work up to the amount presently obligated. This obligated amount may be unilaterally increased from time to time by the Contracting Officer by written modification to this contract.
The obligated amount shall, at no time, exceed the contract ceiling as specified in paragraph a above. When and if the amount (s) paid and payable to the Contractor hereunder shall equal the obligated amount, the Contractor shall not be obligated to contiiiue performance of the work unless and until the Contr::cting Officer shall increase the amount obligated with re vcct to this contract. Any work I
undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk."
r.
]
l l
NRC-26 96 261 Modification No. 2 Page 3 of 3 i
I A summary of obligations for this contract, from date of award through the date of this action is provided below:
Total FY 96 Obligations $160,012.00 i
Total FY 97 Obligations $124,179.00 Cumulative Total of NRC Obligations: $284,191.00 This modification obligates FY 97 funds in the amount of $35,542.00 All other terms and conditions under this contract, including the ceiling amount of $489.653.00, remains unchanged, l
1
)
1 l
1