A 6m 4

a a-,

-.__amAe.,--

.-a.

e.

a a,_.a-

._A.a

,meu+

em

..A gJ--.--

m

_m...._g_..A l

C RE-21 CORE OPERATING LIMITS REPORT i

l l

1 CYCLE 6

~

COLR i

RE DEPT SUPERVISOR du/ N GAN~)

U

~

OPERATIONS MANAGER 8dh 4 c. rAC (c7-? 7 SIGNATURE DATE REVISION 01-06-00 i

9706260028 970620 PDR ADOCK 05000443 p

PDR

5

)

.e 1

1.0 Core Operating Limits Report This Core Operating Limits Report for Seabrook Station Unit 1, Cycle 6 has been prepared in accordance with the requirements of Technical Specification 6.8.1.6. This report is applicable for operation in MODES 5 and 6 only.

The Technical Specifications affected by this report are:

1) 3.1.1.2 Shutdown Margin Limit for MODE 5 2.0 Operating Limits The cycle specific parameter limits for the specifications listed in section 1.0 are presented in the following subsections. These limits have been developed using the NRC approved methodologies specified in Technical Specification 6.8.1.6.

2.1 Shutdown Margin Limit for MOD'E 5: (Specification 3.1.1.2)

The Shutdown Margin shall be greater than or equal to 1.9% AK/K.

e t

f.

4 ENCLOSURE 2 TO NYN-97070 1

l 1

l L

P i

l l