Submits Summary of 970610-11 NRC Maintenance Rule Workshop in Rockville,Md.Agenda for Workshop Attached
ML20141C716
Person / Time
Issue date: 06/24/1997
From: Boger B
NRC (Affiliation Not Assigned)
To: Jaudon J, Pederson C, Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9706250422
Download: ML20141C716 (5)


Text

_

sp itruq

[

k UNITED STATES e

s j

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 2066Mm01

          • ,o June 24, 1997 MEMORANDUM T0:

James T. Wiggins, Director Division of Reactor Safety Region I Johns P. Jaudon, Director Division of Reactor Safety Region II Cynthia D. Pederson, Director Division of Reactor Safety Region III Arthur T. Howell, Director Division of Reactor Safety Region IV FROM:

Bruce A. Boger, Director Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation

SUBJECT:

NRC FMINTENANCE RULE WORKSHOP

SUMMARY

-- JUNE 10-11, 1997 The subject workshop was hosted by the Quality Assurance and Maintenance Branch (HQMB), and was held at NRC headquarters, Rockville, Maryland.

NRC staff members from all four regions and NRR representatives from organizations responsible for the maintenance rule (MR), inspection programs, license renewal, generic communications, decommissioning, and probabilistic safety assessments met to reach a " common understanding" on certain issues to ensure consistency among inspections.

The following MR issues were addressed during the workshop:

Clarification of changes to NRC Regulatory Guide 1.160 revision 2,

" Monitoring the Effectiveness of Maintenance at Nuclear Power Plants."

NRC enforcement and legal positions on issuing violations related to 10 CFR 50.65 (a)(2) and future rule changes to (a)(3).

NRC Maintenance Rule Baseline Inspection (MRBI) schedule, methods for closing open items, inspection and PRA resources, use of risk insights during each inspection, and the acceptable method of evaluating licensees' self-assessments and facilities in decommission status.

i The agenda for this workshop is attached, and includes other areas and inspections discussed during this engaging and active workshop.

These types of interactions help ensure consistency of inspections throughout each of the ppd'ki V

'I' ergo A

l 9 5 O il A "7

~

77-Mb-

" #},., u,c n c /2 9706250422 970624 "a"%e NRC FH.E CENTER COPY o"*

c cno v

l i

Multiple Addressees June 24, 1997 regions and enable us to work toward a standard approach for inspections for future risk-informed, performance-based regulations.

Our appreciation is conveyed to you and your staff for your support and efforts during the NRC MR Workshop.

Attachment:

As stated CC:

S. J. Collins 1

F. J. Miraglia l

T. T. Martin i

B. Sheron G. Holahan F. Gillespie W. Dean (OED0)

J. Lieberman (0E)

DISTRIBUTION:

l Don Ta.,~.or, NRR Lee Spessard, NRR Suzanne Black, NRR M. Satorious, OE Rich Corriea, NRR Ron Frahm, Jr., NRR JD Wilcox, Jr.,NRR Tom Bergman,~NRR Bruce Boger, NRR Frank Talbot, NRR Wayne Scott, NRR Pete Wilson, NRR Glen Meyer RI Bill Holland RII Jim Gavula RIII Dale Powers RIV Bob Prato, NRR Dick Dudley, NRR J

Paul Harris, NRR Don Hickman, AE0D CENTRAL FILES /PUBLIC HQMB R/F Regional DRS Division Directors

  • SEE PREVIOUS CONCURRENCE DOCUMENT NAME: G: WORKSHOP. SUM 6 d To receive e copy of this document, indicate in the box:

"C' = Copy without ettschment! enclosure

'E' s Copy with attachment / enclosure "N" = No copy 0FFICE HQMB:DRC!l SC:HQMB:DRCH BC:HQMB:DRCH D:DRCH:NRR NAME JDWilcox:r' t RPCorreia SCBlack BABoger /3" DATE 6/19/97*

6/19/97*

06/23/97*

06/ 7J/97 06/

/97 l

i

~

N' NRC NAINTENANCE RULE BASELINE WORKSHOP June 10-11, 1997 Location: 0 4B6 AGENDA IMESDAY. JUNE 10. 1997:

12:30 Session 1 (location: 0 486)

  1. Welcome Speaker: Rich Correia
  1. Introduction Speaker:

Bruce Boger 1:00 Session 2 (location: 0 4B6)

Panel Discussion and Workshop (recommendations)

  1. Revised MR Guideline Book (lead Scott)
  1. MR training (lead Scott) future training by TTC
  1. MRBI schedule (lead Scott)

- inspection yearly schedule

- duration of each MR baseline inspection

]

inspection support (lead Correia)

SSM support use of residents and DRP inspectors 4

inspectors' qualifications 2:00 Break 2:15 Session 2 (location: 0 4B6) continued Panel Discussion and Workshop (recommendations)

  1. Reg Guide 1.160 rev. 2 (lead Bergman)
  1. 0GC's position of MR (a)(2) and what institutes a violation of (a)(2) (lead Bergman)

Structures (lead Bergman)

SRM response to the MR 'and proposed change to (a)(3) (lead Bergman)

Attachment

a.

4 3:15 Break 3:30 Session 2 (0 4B6) continued Panel Discussion and Workshop (recommendations)

  1. PRA issues (lead Wilson)

- MR (a)(3)

- contractor use and badging

- SRA use

- PRA training

  1. IFI and Unresolved Items future closure (lead Wilcox)

NRC method of handling self-assessments prior to the on-site phase of the MR Baseline Inspection (lead Wilcox) 4:30 Daily Closure WEDNESDAY. JUNE 11. 1997:

8:00 Session 2 (0 486) continued Panel Discussion and Workshop (recommendations)

  1. Inspection Procedure 62706, " Maintenance Rule" and incorporation of lessons learned (lead Talbot)
  1. Resident Issues (lead Correia) findings from each region, interface with regional SES, and proposed adjustments to the MR program.

(the regional representative should be able to discuss findings)

  1. Decommissioned Plants Inspection Guidance (lead Correia)

Commission and ACRS Summaries - Gathering information (lead Suzie Black) 9:00 Break 9:15 Session 4 (locations: 0 4B6)

Panel Discussion on NRC Baseline Inspection Results and NRC Lessons Learned (Team leader / lead SSM)

Indian Point 3 (TL: Williams; SSM: Bergman) e.

  • Surry (TL:Gibbs; SSM: Taylor)
  • Davis-Besse (TL:Farber; SSM:Frahm)

Seabrook (TL: Williams; SSM:Wilcox)

  • Waterford (TL:Whittemore/ lead: Clark; SSM:Talbot)
  • Catawba (TL:Gibbs; SSM: Taylor) 10:15 Break 10:30 Session 5 (locations: 0 486)

Panel Discussion on NRC Baseline Inspection Results and NRC Lessons Learned (Team leader / lead SSM)

  • Palisades (TL:Farber; SSM:Talbot)

Hope treek (TL: Williams; SSM:Wilcox)

  • Grand Gulf (TL. Polk; lead McNeill; SSM:Talbot)
  • 0yster Creek (TL:Caruso; SSM: Bergman)

Millstone 3 (TL: Williams; SSM:Wilcox)

  • Byron (TL:Dunlop; SSM: Scott)

Browns Ferry (TL: Gibbs; SSM: Taylor) l Summer (TL: Crowley; SSM: Wilcox)

Closing remarks Speaker:

Rich Correia 11:30 ADJOURN NOTE:

  1. Key topics to be discussed during the workshop. Other topics will be l

discussed as time permits.

  • designates plants selected by each region to be discussed based on greatest impact to gain experience from. The plants not designated will be removed from discussion. ;}