ML20141B878
| ML20141B878 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/26/1986 |
| From: | Bailey J GEORGIA POWER CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| GN-797, NUDOCS 8604070138 | |
| Download: ML20141B878 (1) | |
Text
r Georgia Power Company Rout) 2. Box 299A Waynisboro. Georgia 30830 Telephone 404 554-9%1 404 724 8114 Scuthern Company Services. Inc.
Post Office Box 2625 m
Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect March 26, 1986 Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
GN-797 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PIANT - UNITS 1 AND 2 EMERGENCY PLAN - REVISION 5
Dear Mr. Denton:
Georgia Power Company, acting on its own behalf and as agent for Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia, submitted Revision 5 to the Vogtle Electric Generating Plant (VEGP) imergency Plan (EP) on February 25, 1986.
This revision contained a typographical error in Table 0-2.
The substance of the error was to delete a commitment to train communicators / recorders in communications and records. This commitment has always been an element of VEGP's EP.
Since this deletion was a draf ting error, no hange bar is provided in Table 0-2.
This error will be corrected in Revision 6 of the VEGP EP.
Should you have any questions on the enclosed submittal, please do not hesitate to contact me.
Sincerely,
.b.
}
J. A. Bailey Project Licensing Manager JAB /sm xc:
J. N. Grace (3)
M. A. Mille r R. A. Thomas B. Jones, Esquire J. E. Joiner, Esquire L. T. Gucwa B. W. Churchill, Esquire G. Bockhold, Jr.
D. C. Teper Vogtle Project File
[
0414V 8604070138 860326
\\
l 8
PDR ADOCK 05000424 F
PDR i