ML20141B548
| ML20141B548 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 06/20/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gambhir S OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20141B551 | List: |
| References | |
| 50-285-97-10, EA-97-196, NUDOCS 9706240050 | |
| Download: ML20141B548 (5) | |
See also: IR 05000285/1997010
Text
. . . . - - _
_ -. - - .
- _ _ . - . _ _ . . - . . _ _ . . - - - .
~ - . - ~ _ . . ~ _
,
_
..
e
/g# W
W
UNITED ST ATES
Ft
NUCLEAR REGULATORY COMMISSION
e *
REGloN IV
.
.
I
S _
y
g
U
f'
611 RYAN PLAZA DRIVE, SulTE 400
$
8
AR LINGToN, T EXAS 76011 8064
9 **"'
JUN 2 01997
EA 97-196
)
i
l
S. K. Gambhir, Division Manager
Production Engineering
i
Omaha Public Power District
J
l
Fort Calhoun Station FC-2-4 Adm.
!
P.O. Box 399
!
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023 0399
)
SUBJECT: NRC INSPECTION REPORT 50-285/9710 AND NOTICE OF VIOLATION
l-
,
Dear Mr. Gambhir.
An NRC inspection was conducted May 4 through June 14,1997, at your Fort Calhoun
Station reactor facility. The enclosed report presents the scope and results of that
-
inspection.
During the 6-week period covered by this inspection period, your conduct of activities at
the Fort Calhoun Station was generally characterized by safety-conscious operations,
l
sound engineering and maintenance practices, and careful radiological work controls. One
l
violation of NRC requirements was identified regarding a failure to install a flinger ring on a
component cooling water pump. The NRC has concluded that information regarding the
i
reason for the violation and the corrective actions taken are a! ready adequately addressed
in the subject report. Therefore, you are not required to respond to this violation unless
the description provided does not accurately reflect your corrective actions or your
j
. position. In that case, or if you choose to provide additional inforrnation, you should follow
the instructions specified in the enclosed notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosures, and your response if you choose to provide one will be placed in the NRC
Public Document Room (PDR). To the extent possible, your response should not include
any personal privacy, proprietary, or safeguards information so that it can be placed in the
'
PDR without redaction.
t
l
\\
l
!
)
t
i
L
i
l
I
9706240050 970620
ADOCK 05000285
G
1
,
__
_
-
. -.
e
I
.
Omaha Public Power District
-2-
l
!
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
,
Sincerely,
., -
k.._
/
[
x.
,
l
7
fQ
/
/
,-
Thomas P. Gvrynn Dir ctor/
Division of Reacto Pr ject
Docket No.: 50-285
l
License No.: DPR-40
Enclosures:
i
2. NRC Inspection Report
50-285/97-10
l
cc w/ enclosures:
James W. Tills, Manager
l
Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
P.O. Box 399
Fort Calhoun, Nebraska 68023
Perry D. Robinson, Esq.
Winston & Strawn
1400 L. Street, N.W.
Washington, D.C. 20005-3502
Chairman
l
Washin0 ton County Board of Supervisors
l
Blair, Nebraska 68008
l
4
!
l
.
!
I
. - _ _ - - - _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
Omaha Public Power District
-3-
Cheryl Rogers, LLRW Program Manager
Environmental Protection Section
Nebraska Department of Health
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
,
i
1
l
4
1
1
i
i
-_- _ _ -- _ -
. -
. --
.... .. .
-. .
. - .-- ..--.- - - . .. - . - -
. . ~ . _ . - - - - .
- - . - . - - -
I
.
, o
Omaha Public Power District
-4-
JUN 2 01997
l
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
l
E-Mail report to Document Control Desk (DOCDESK)
l
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
l
bec to DCD (IE01)
bec distrib. by RIV:
l
Regional Administrator
DRS-PSB
'
DRP Director
MIS System
Branch Chief (DRP/B)
RI V File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
E A File
'
Enforcement Officer
1
DOCUMENT NAME: R:\\_FCS\\FC710RP.WCW
To receive copy of document, Indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" a No copy
l
RIV: SRI:DRP/B (jgC:DRP/B []
D:DRP
j.J
WCWalker:nc(//
WDJohns4K
TPGwynn ([ Jq
6//7/97
6 @ 97
6/2097
O
OFFICIAL RECORD COPY
.
.
..
.
.
.. - _ _
__
.
4
Omaha Public Power District
-4-
JUN 2 01997
E-Mail report to T. Boyce (THB)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
bec distrib, by RIV:
Regional Administrator
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident Inspector
EA File
Enforcement Officer
DOCUMENT NAME: R:\\_FCS\\FC710RP.WCW
I
To receive copy of docu, ment, indicate in box [C" = Copy without enclosures
"E" = Copy with enclosures "N" = No copy
I
RIV:SRl:DRP/B (f4C:DRP/B []
D:DRP
/J
j
WCWalker:nc (//
WDJohns4K
TPGwynn ([ J/ 'g'
t
"
6//~)/97
6fjp97
6dt?97
4
l
!
l
OFFICIAL RECORD COPV
l
_ _ _ _ _ _ _ _ _ - _ _ _