Informs That on 970311 NRC Staff Completed Semiannual Plant Performance Review (PPR) of Plant.Details of Insp Plan for Approximately Next 6 Months Encl
ML20141B452
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/09/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
References
NUDOCS 9705150286
Download: ML20141B452 (4)


Text

. _ _ _ _ _ _ _ . _ . _ _ _ _ _ _ . . _ _ _ _ _ _ . _ - - - _ _ _ . . _ _ _ .

L Ne

! May 9,1997 1

I i

Mr. J. H. Mueller l Site Vice President i Zion Station i

Commonwealth Edison Company  !
101 Shiloh Boulevard l

! Zion,IL 60099

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - ZION i

l

Dear Mr. Mueller:

l l On March 11,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Zion Nuclear Station. The staff conducts these reviews for all operating nuclear l power plants to develop an integrated understanding of safety performance. The results

are used by NRC management to facilitate planning and allocation of inspection resources.  ;

j The PPR for Zion Station invalved the participation of all technical divisions in evaluating '

inspection results and safety performance information for the period September 1996 ]

through March 1997. Plant Performance Reviews provide NRC management with a 1 current summary of licensee performance and serve as inputs to the NRC Systematic j Assessment of Licensee Performance (SALP) and senior management meeting (SMM) .

reviews.

In our letter dated March 14,1997, issued after the previous PPR, we described the j formation of a Zion Station oversight panel. This action was taken to ensure close NRC oversight of your actions to address performance issues. In addition, following the  ;

last SMM held January 14-15,1997, a letter was sent to Mr. James J. O'Connor on l January 27,1997, informing him of the NRC's concerns with Zion Station performance. j j Since the previous PPR, we have observed an increase in your staff's efforts to address problems at Zion Station. As indicated in Confirmatory Action Letter No. Rlll-97-002A, an /!

NRC inspection will be conducted prior to restart of the lead unit. The oversight panel will continue its review of your staff's preparations for Zion Station restart and the continued  !

implementation of performance improvement initiatives for Units 1 and 2.'

This letter advises you of our planned inspection effort resulting from the Zion Station PPR review, it is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. The enclosure details our inspection plan for approximately the next six months.

The rationale or basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident and region-based project engineer inspections are not listed due to their ongoing and continuous nature. In addition, a dedicated NRC engineering inspector has been assigned to augment the resident inspector staff.

naan ,lll# ll#ll.ll#l.l#ll.lllllill.l#lll.ll 9705150286 970509 ~ ~ ~"" ~~~~~""--

PDR ADOCK 05000295 O PDR . - , ,- - .- ... - _-

i i

l J. H. Mueller 2-

- We willinform you of any changes to the inspection plan. If you have any questions,  ;

j please contact Mr. Marc L. Dapas at (630) 829-9628. I j Sincerely, i

/s/Geoffrey E. Grant l Geoffrey E. Grant, Director  !

Division of Reactor Safety l Docket Nos. 50-295, 50-304 License Nos. DPR-39, DPR-48

Enclosure:

Inspection Plan l

DOCUMENT NAME: R:\lNSPECT.PLN\ ZION \ZIO-PPR.497  !

To receive a copy of this document, indicate in the box "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rill g Rill l,) Rlli g Alli lff Rill ld NAME Hills /co W Lennartzp Ring %b GavulaW} Gardner W DATE 05/8/97 05/9/97' 05/ $ /97 OFFICE Mg Rill Rill g Rill __

Rill NAME CW Kozaj q, Dapas //f 9 Grant h DATE 05/g/97 05/K/97 05/7/97 05/f(97() 05/ /97 OFFICIAL. RECORD COPY

)

i

" i J. H. Mueller -

3- l i

i

cc w/oncl
T. J. Maiman, Senior Vice President i Nuclear Operations Division 1

D. A. Sager, Vice President, I

Generation Support

H. W. Keiser, Chief Nuclear Operating Officer R. Starkey, Plant General Manager i R. Godley, Regulatory Assurance Supervisor

! l. Johnson, Acting Nuclear 4 Regulatory Services Manager

+

Richard Hubbard  !

, Nathan Schloss, Economist 1 Office of the Attorney General l i Mayor, City of Zion '

i State Liaison Officer, Wisconsin State Liaison Officer Chairman, Illinois Commerce Commission Document Control Desk-Licensing i

j Distribution:

i Docket File w/enci Project Manager, NRR w/enci

' PUBLIC IE-01 w/ encl DRP w/enci i OC/LFDCB w/enci Rlll PRR w/ encl i SRI Byron, Braidwood, CAA1 w/enci (E-mail) l i Zion w/enci Deputy RA, w/enci

! A. B. Beach, w/ encl RAC1 (E-Mail)

! Rlli Enf. Coordinator, w/ encl DRS (2) w/enci

TSS w/enci  !

i J

d W l i

1 b

e T - *

. _ . ~ . . - _ . _ _ . _ _ . . _ _ _ - --_ _ _.. _ _ _ _. _ . _ _ _ .. - .. _ . _ -

l -

Enclosure -

ZION STATION -

INSPECTION / ACTIVITY PLAN IP - Inspection Procedure Ti - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION / TITLE / NUMBER OF NRC PLANNED TYPE OF ACTIVITY PROGRAM AREA . INSPECTORS / DATES INSPECTION / ACTIVITY-INDIVIDUALS COMMENTS IP 83750 Occupational Radiation 1-2 June 2-6 Regional initiative

  • Exposure IP 84750 Radwaste Treatment & i-2 July 28-August 1 Regional Initiative * '

Effluent Monitoring IP 83750 Occupational Radiation 1-2 September 15-19 Regional Initiative

  • Exposure IP 82301 Review of Emergency 1-2 December 1-5 Core inspection Preparedness (EP) Exercise IP 82302 Review of EP Scenario IP 93802 Operational Readiness TBD TBD Regional initiative
  • Inspection a
  • Regional Initiatives Based Upon Previous Performance

'\

'\

i

-_.__-- ___-.__- -----.-_--_-- _ _- - _--- --.__ _ _ ---.-- --_--_me- ~ - - - _ - - - - ----___.---------_-----e,mm -- _-- - ~ - s- -- m