ML20141B373

From kanterella
Jump to navigation Jump to search
Responds to NRC Ltr Re NOV & Nonconformance in Insp Rept 99901307/96-01.Corrective Actions:Training Session for QA Dept Personnel Was Conducted on 970502 to Ensure Compliance Requirements Met for SOP 17.002,Rev 6
Date released: 06/03/2020 Download: ML20141B373


Accutech Sample Plan Methodology.
ML20141B377
Person / Time
Issue date: 04/15/1997
From:
B&G MANUFACTURING CO.
To:
References
REF-QA-99901307
Download: ML20141B377 (25)
Responds to NRC Ltr Re NOV & Nonconformance in Insp Rept 99901307/96-01.Corrective Actions:Training Session for QA Dept Personnel Was Conducted on 970502 to Ensure Compliance Requirements Met for SOP 17.002,Rev 6
ML20141B368
Person / Time
Issue date: 05/02/1997
From: Reindl R
B&G MANUFACTURING CO.
To: GALLO R M
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-QA-99901307
Download: ML20141B368 (9)