Ltr Contract:Task Order 44, Initial Exam for Surry NPP, Under Contract NRC-03-94-035,awarded to Sonalyst,Inc
ML20141B273
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/05/1997
From: Wiggins E
NRC OFFICE OF ADMINISTRATION (ADM)
To: Sanders L
SONALYSTS, INC.
References
CON-FIN-J-2073, CON-NRC-03-94-035, CON-NRC-3-94-35 NUDOCS 9705150217
Download: ML20141B273 (4)


Text

.

f)Ch p>gne%,% UNITED STATES p 7 y l j NUCLEAR REGULATORY COMMISSION

$ 2 WASHINGTON. D.C. 20e50001

%,.....,/ MAY 0 21997 Sonalysts. Inc.

ATTN: Ms. LaVeria Sanders Contracting Officer 215 Parkway North Post Office Box 280 Waterford Connecticut 06385

SUBJECT:

TASK ORDER NO. 44. ENTITLED " INITIAL EXAMINATION FOR SURRY NUCLEAR POWER PLANT" UNDER CONTRACT NO. NRC-03-94-035

Dear Ms. Sanders:

In accordance with Section G.4(c) of the subject contract, entitled " Task Order Amrd." this letter definitizes the subject task order. This effort shall be performed in accordance with the enclosed Statement of Work.

Task Order No. 44 shall be in effect from May 1.1997 through August 31, 1997 with a cost ceiling of $35.567. The amount of $32.551 represents the total estimated reimbursable costs, the amount of $2.630 represents the fixed fee. 4 I

and the amount of $386 represents the facility's capital cost of money.

1 The accounting data for the subject task order is as follows: l B&R No.: 720-15-11-20-00 Job Code No.- J-2073 Appropriation No.. 31X0200.720 BOC No.: 252A l NRR Unique Identifier: NRR9403544 )

Obligated Amount: $35.567 The following individual is considered to be essential to the successful aerformance of the work hereunder: T. Guilfoil. I. Kingsley. D. Lane.

4. McGonegal, K. Parkinson, and G. Weale.

The Contractor agrees that sech personnel shall not be removed from the effort l under the task order without compliance with Contract Clause H.1. Key j Personnel.

Your contacts during the course of this task order are: l Technical Matters: Mr. Lawrence Vick ,

Project Officer l (301) 415-3181 l Contractual Matters: Ms. Anita Hughes Contract Specialist -

ppy [

9705150217 970505

'^^') 415-6526 I PDR CONTR NRC-03-94-.035 pon -

. L Contract No. NRC-03-94-035 Task Order No. 44 The issuance of this task order does not amend any terms or conditions of the subject contract.

Please indicate your acceptance of this task order by having an official, authorized to bind your organization. execute three (3) copies of this document in the space provided and return two (2) copies to the U.S. Nuclear Regulatory Commission ATTN: Ms. Anita Hughes, Division of Contracts and Property Management. T-712 ADM/DC/ TAB 2, Washington, D.C 20555. You should retain the third copy for your records.

Sincerely,

, s C ' f*

El'ois J. Wigg[/sontracting Officer Contract Mana Mit Branch No. 2 Division of Contracts and Property Management Office of Administration Enclos!:re:

As stated c

ACCEPTED:k.

decia Opuled) dtda $ JankW '

Tame

!" Y 5sk1 Date l

l l

l

N TASK ORDER NO. 44 ,

.A. DESCRIPTION Reactor operator licensing examinations are scheduled at the nuclear power plant described below. Details of the examinations follow:

. Facility: Surry Location: Gravelneck, VA Docket: -

50-280/281 Date of Exam: 08/04/97 Type of Exam: Initial Number of Candidates: Total 1 (RO:1; SRO:9; SROU:Z; SR01:9) i Note: X denotes applicable item related to this task order The number value indicates the number of task per item x Contractor will assist in examinatton development, {

1 administration and grading.

CONTRACT EXAMINERS SHALL: l

_K_ ,_L_ Prepare RO written exam, per ES-401 x _1_ Prepare SRO written exam, per ES-401

_1_ _Z_ Prepare simulator scenario sets, per ES-301

_2_ _Z_ Prepare walkthru exam outlines (JPM sets), per ES-301

_1. _2_ Review walkthra exam outlines and prepare associated administrative questions, per ES-301 1

_2_ _Z_ Submit written examinations, simulator scenarios, and/or l walkthru exam outlines as appropriate to Regional office i for review on a schedule consistent with the HOLB Examiner Standards, ES-401, ES-201

3. x _2_- Incorporate changes to written exam, simulator scenarios, and/or walkthru exam outlines as appropriate, per ES-201, ES-301, ES-401 Participate in facility review of written exam, per ES-201 Administer written exams at. plant site, per ES-402 Administer operating exams at plant site, per ES-302 Grade operating examinations, per ES-303
Update Examination Question Bank, per ES-501 F Attend exit briefing with facility Assist in review of facility developed examination material and preparation of written examination L Conduct on-site pre-exam familiarization week of 07/21/97 Conduct in-office preparation for exam, per ES-601, ES-602 Assist in administration of requalification exam, per ES-601, ES-602, ES-603 during week of N/A

_. _ Grade written .requalification exams, per ES-601 s

,, . y B. ESTINATED LEVEL OF EFFORT Examination preparation, administratf' ,, grading and Project Management: .420.. PSH Travel for 0 examiner (s) betvee contractor's main office and plant site: 0 PSH Clerical: 16_ PSH C. PERIOD OF PERFORMANCE 0 901/97 thru 08/31/97 D. REPORTS The contractor shall submit Operator Examination Reports, summary sheets and other documentation as required by the Operator Licensing Examiner Standards, NUREG-1021, to the Region office.

E. NRC REGIONAL CONTACT: Nike Ernetes (404) 331-4180 1