ML20141A046
| ML20141A046 | |
| Person / Time | |
|---|---|
| Site: | University of Maryland |
| Issue date: | 03/27/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Dorfman R MARYLAND, UNIV. OF, COLLEGE PARK, MD |
| References | |
| NUDOCS 8604040373 | |
| Download: ML20141A046 (2) | |
Text
.-
MAR 2 71986 Docket No:
50-166 University of Maryland ATTN:
Dr. J. Robert Dorfman Acting Provost Division of Mathematics and Physical Sciences and Engineering College Park, Maryland 20742 Gentlemen:
Subject:
Projects Realignment in Region I The purpose of this letter is to inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace Mr. Ebe C. McCabe as the cognizant Section Chief for your facility.
Mr. Elsasser can be reached.on 215-337-5378.
I will retain responsibility as the cognizant Branch Chief.
This realignment will become effective on March 31, 1986.
Sincerely, WM S1sned art Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:
Dr. R. Belcher, Reactor Dir?ctor Dr. F. Munno, Director, Nuciear Engineering Program Dr. J. S. Toll, President Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of Maryland (2) 8604040373 e60327 PDR ADOCK 05000166 P
PDR I $
3
'y,.
University of Maryland' 2
MAR 2 7-M bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
J. Grant
-H. Berkow, NRR
/
RI: RP R
P
R L: RP N
ant /meo Els sser inger aros't'ecki.,
3 21/86 QN\\ '
aj v 0FFICIAL RECORD COPY