ML20140J259
| ML20140J259 | |
| Person / Time | |
|---|---|
| Site: | University of Lowell |
| Issue date: | 03/27/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Beghian L MASSACHUSETTS, UNIV. OF, LOWELL, MA (FORMERLY LOWELL |
| References | |
| NUDOCS 8604040290 | |
| Download: ML20140J259 (2) | |
Text
~_
n.
p: ^
MAR 2 71986 Docket No:
50-223 University of Lowell ATTN:
Dr. Leon E. Beghian Vice President for Academic Services and Technical Research 1 'Jniversity Avenue Lowell, Massachusetts 01854 Gentlemen:
Subject:
Projects Realignment in Region I The purpose of this letter is to inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace Mr. Ebe C. McCabe as the cognizant Section Chief for your facility. Mr. Elsasser can be reached on 215-337.-5378.
I will retain responsibility as the cognizant Branch Chief.
This realignment will become effective on March 31, 1986.
Sincerely, Original Signed By:
Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:
Dr. J. Phelps, Program Director for Nuclear Engineering T. Wallace, Reactor Supervisor Dr. G. H. R. Kegel, Administrative Assistant for Reactor and Accelerator Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of Massachusetts (2) 8604040290 860327 PDR ADOCK 05000223 p
\\)
-220{
University _of Lowell 2
NAR 2 71986 bec:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
J. Grant H. Berkow, NRR i
!hRP R :DRP R
P RI:
P 4
8 L'l /
N Grant /meo Elsisser h61fzinger St _ rostecki 3/21/86 3 M 4;
'~
OFFICIAL RECORD COPY