Text
'Af 4
a 5 41 E.*zIs)fo k z$s"ote21o N
T*""
n Pittsburgh, PA 15205 April 1, 1986 Mr. Harold R. Denton, Director Office of Nuclear Rector Regulation United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager Division of PWR Licensing - A Of fice of Nuclear Reactor Regulations
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Dropped Rod Calculations Gentlemen:
Westinghouse has completed the dropped rod analysis for Cycle 1 of Beaver Valley Station, Unit 2 (BVPS-2).
It was performed utilizing the methodology in WCAP-10297-PA, " Dropped Rod Methodology for Negative Flux Rate Trip Plants."
Based upon this analysis, the NRC's restriction of operations above 90% power as described in the BVPS-2 Safety Evaluation Report (SER), Section 15.4.3, may be removed.
This completes confirmatory Item No. 42.
Please note that this is specific for Cycle 1 operation and is valid for the "Lemoniz" fuel, which will be used at BVPS-2.
Detail of the "Lemoniz" fuel will be provided in. Amendment 12 to the Final Safety Analysis Report.
DUQUESNE LIGHT COMPANY By _
J. W. Carey Vice President RWF/jdw NR/NRC/ DROP-R0D cc:
Mr. P. Tam, Project Manager Mr. G. Walton, NRC Resident Inspector INPO Records Center NRC Document Control Desk 9604040279 860401 PDR ADOCK 05000412 k