Forwards marked-up Procedures Generation Package Showing Deviations from Emergency Response Guidelines,In Response to SER Confirmatory Item 44
ML20140H195
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/16/1985
From: Bailey J
GEORGIA POWER CO.
To: Adensam E
Office of Nuclear Reactor Regulation
References
0053V, 53V, GN-705, NUDOCS 8510090066
Download: ML20140H195 (400)


Text

{{#Wiki_filter:r 6 Georgi:a Powzf Company

    . Rout 3 2. Box 299A Wayrusboro. Georgia 30830 Telephone 404 554-9%1 404 724-8114 Southern Comparty Services, Inc.

Post Office Box 2C25 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtle Proj.ect September 16, 1985 Director of Nuclear Reactor Regulation File: X7BC35 Attention: Ms. Elinor G. Adensam, Chief Log: GN-705 Licensing Branch #4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 44: PROCEDURES GENERATION PACKAGE

Dear Mr. Denton:

In the SER your staff requested to review the VEGP E0P's deviations from the ERGS. Enclosed are the deviations noted in our review along with the appropriate justifications. If your staff requires any additional information, please do not hesitate to contact me. Sincerely, J. A. Bailey Project Licensing Manager JAB /sm Enclosure xc: D. O. Foster (w/o enclosure) G. Bockhold, Jr. (w/o enclosure) R. A. Thomas (w/o enclosure) T. Johnson (w/o enclosure) J. E. Joiner, Esquire D. C. Teper (w/o enclosure) B. W. Churchill, Esquire L. Fowler M. A. Miller (2) W. C. Ramsey (w/o enclosure) B. Jones (w/o enclosure) Vogtle Project File L. T. Cucwa 0053V 8510090066 850916 {DR ADOCK 05000424 PDR

XEROX REQUEST: Date: @ f ue  : 7f 6 Individual Making R quest: / Document or Identification: b 80 / e $4f #244 4 Number of Copy (ies) requested: Special Instructions (,if any):lI/bh,, w c aus / O ssh A<W K1/GNw t (8Ed CM n>19 s ~ Y Ydf d k / r o t r~ Priority: hl r 4 w  % ' + Need immediately - all other work should be dis- * (Circle One) continueo until completion of this assignment. 2 Rosh - Does not need to take precedence over work already received, but should not take longer than four (4) hours to complete.

                                         ^

3 Not needed immediately - Should be completed witnin eignt (8) nours.

     ' ' Any work requiring a greater turnaround time than listed above requires an explanation to the individual making the request.

If the above priority system does not work for the requester, he should contact a supervisor in order to reestablish priorities. FOR OPERATOR USE ONLY: Time Assignment Completed: Date Time e M J

                                                                                                     ~ ' * ' *
    ~"

Georgia Power " * " 'c k i Mduz . . . . . . - - - , , , 0 VOGTLE ELECTRIC GENERATING PLANT eaan w

           '/. 9/ t 4                                   UNIT   rrpy0N                                       1 OF 1 EOP STEP DOCUMENTATION FORM PIV       /      EOP $       [/ ddC -/                 REV      O ERG 4 E~b                                       _

EOP WRITER aA DATE /6[/~7 F1' SECTION I: ERG STEP Manually trip reactor g reactor will NOT_ Verify Reester Trip: trip, THEN go to FR 5.1, RESPONSE TO

  • Rod bottom lights - LIT NUCLEAR POWER GENERATION / ATWS,
  • Reactor trip and bypass breckers - _

Step 1. OPEN ' '

                   .* Rod position indicators - AT ZERO
  • Neutron flux - DECREASING
                                          ~

SECTION II: EOP STEP IMMEDIATE OPERATOR ACTIONS

1. Manually trip reactor.
1. Verify Reactor Trip:

IF reactor will NOT_ trip, e Rod bottom lights - LIT. THEN manually open supply feed breakers to 1NB08 e Reactor trip and bypass and 1NB09. breakers - OPEN. IF reactor NOT tripped, e Neutron flux - THEN go to TFJ11-1, FR-S.1 LOWERING. RESPONSE TO NUCLEAR POWER , GENERATION /ATWT.

                                                                                                                             %d SECTION III:           JCSTIFICATION       'h 6 6 P d r w _ 3 o w -ek [-e i

l A- f

                                                     %w
                                                                               %          f.  && VM W w

J 'I M n h

                    &               I M @ U .)   %h l N           C9             n.. ,
                        -S.I N        Se.    -, kmn                            ,
                                                                                                           &             $~yl F
                                              %dA._ v r n                                                     m                 i C._                                                                                                    k I

luscs ~ pno9-A. s&1410 visec's Ad pnerl h Rod ' ' '

          .u.v                                                                                                 **
                                                                                                .,               p              ]
 ~"                                                                      ~ ~ ' -

Georgia Power

  $) $ &
                                                                                     ~

ocwen ano,eum wamem

 ,                          VOGTLE ELECTRIC GENERATING PLANT                   0
                                                                         ~'*

e' s/e S UNIT COMMON 1 op i EOP STEP DOCUMENTATION FORM ERG # d~- 0 REV / EOP 4 / 70 d o - / REV O EOP WRITER CATE d // 7 I SECTION I: ERG STEP O C O r r f 5' p @ N

                                                                 /N}

ExG S fe P

         -                                                        ~

SECTION II: EOP STEP L. Verify Proper ESFAS 6. Manually actuate SI. Actuation:

a. MLB indications IF oroper ESFAS actuation correct for injection can'NOT be verified, phase after load THEN continue with Step 7.

sequencing.

b. Go to Step 13.

SECTION III: JUSTIFICATION MMM-b '

                                                                                /

4

                    *3 s_      v                             c'      f
       & / 9000-l. /h l.' 2                             St.YUnw Y ix

(~ J c V

                                                 = ._d n LY'S -

m N

1 a .'

 '#       ~                                                                                           --

Georgiafbwer 8"< 1 a1 h _- l

          ,                      VOGTLE ELECTRIC GENERATING PLANT                       g     ^

0" 1 Y/l8/0Y UNIT CCM40L L O F f '3 1 EOP STEP DOCUMENTATION FORM ERG e E.-O _ aEv i EOe e im-l REv o EOP WRITER V/ O DATE_ 6//f/f,5-SECTION I: ERG STEP ', (( Verify AFW Pumps Running:

a. Manucily stort pumps.
a. MD, pumps - RUNNING
b. Turbine-driven pump - RUNNING IF b. Manually open steam ' supply volves. -

NECESSARY e 4 t s 3

J' ~ -~ Georgia Power ll894-C e' "j j .[ g , , , V0GTLE ELECTRIC GENERATING PLANT 0 N'S /3 Y UNIT COMON [OF EOP STEP DOCUMENTATION FORM ERG 4 bO REV / EOP 4 /70 d " '/ REV EOP WRITER , b /& DATE 6///Y W Ec? SECTION ID EW3 STEP Verify AFW Pumps Running:

a. MD pumps - RUNNING. a. Manually start pumps.
b. SG blowdown isolated:

e SG blowdown isolation valves - SHUT. o SG sample isolation --- valves - SHUT.

c. Turbine-driven pump - c. Manually open TDAFW pu=p RUNNING IF ANY OF THE steam supply valve FOLLOWING CONDITIONS HV-5106.

EXISTS: e LO-LO LEVEL IN TWO OR MORE SGs. e BLACK 0UT. Y

           .:3 2,
                                                                                        *d___,   . . . _ . _ . _ _ _ _ , _ . _ __._
      ' "                                               Georgia Power                                   ~ ~<-

, 0 11894-C

    /     4g y 4                                       powtm GEN 4AAM DEPAAm8ENT
        ,,                                  VOGTLE ELECTRIC GENERATING PLANT                                 o aaone 3 4/i3/39                                                  UNIT _ CCMMON                      goph EOP STEP DOCUMENTATION FORM ERG #     I-O REV            /          EOP 4 /9o00 /         REV     O EOP WRITER                [/ /O                                             DATE      kI/ I
                                        'T s'S T*r>= I c A v ie tu SECTION IJT ENP S$4 eE                 rGyv               \ r e na n   b: {e( [ , N , ,, ,

c( r . v e ~ p-_pvec e f~ e lu ded.

n c k i c ci . .- ~ ~ ~ d , ~ ~ ,, t , , sc/s+,u-v=Iver ce c . 5 'v e J s L A s ,7 , s / 'e a lou Ss tee, ( Cl,9] , P Is ~4 s pec4 c v'Ive
                     ,de~4.fea+,a~                                               v+ s -     i    clvs ed-an               -+ t,<         m. m t              cIc      +    c 1    o~    c P ' ""i ' r es t          c(                                     .

F

         *:3';t

_8

g' ~ GeorgiaPower y,

  • o l

Nf M w eseum os=meer m. om YOGTLE ELECTRIC GENERATING PLANT 0 bg[0Y 4 estL - ' UNIT CfM40N 1 OF f 2 EOP STEP DOCUMENTATION FORM ERG e E-o aEv I EOP e - lh-l arv 0 EOP WRITER bl) & DATE _ d[/7/ff SECTION I: ERG STEP 14 Verify Centeismest 5 prey Net Repired:

a. Containment pressure - HAS
o. Perform the following:

REMAINED LESS THAN nj PSIG

1) Verify containment spray initiated.

_ y g THEN monuo,ily initiate.,

2) Verify containment isolation Phase B volves c!csed. jf .N_QI, M manually close volves. "
3) Stoo all RCPs. _

i e

                                                                                       ~

GeorgiaPower ll894-C

                  ,7 VOOTLE ELECTRK: GENERATING PLANT                    O'
       . mars .-

[N UNIT CC M M fork a EOP STEP DOCUMENTATION FORM ERG $ [-d REV / EOP # / f d o 4 -/ RIV O EOP WRITER [9 DATE d I I j Sc4 SECTION ID BRG STEP

15. Check Containment Spray -

NOT REQUIRED:

a. Containment pressure - a. Perform the following:

HAS REMAINED LESS THAN 22 PSIG BY PRESSURE 1) Verify containment

                         , RECORDING.       .

spray 1,nitiated. . IF NOT, THEN manually actuate.

2) Verify containment spray pumps running.
3) Verify containment spray additive flowrate of approximately 40 gpm per operating CS pump, i

[ u l i 1 7

       ! w u.                                                                                      - ~a .

Geo faPower 11894-c N f /QIt./sv., = oc ser,eunon osmmea N* VOGTLE ELECTRIC GENERATING Pt. ANT 0 am

                   +/.3/e +                                   UNIT   COMMON EOP STEP DOCUMENTATION FORM ERG #        &'- O                REV      /      EOP #    r' 9 o o d - /     ggy       o EOP WRITER          -

h/$ DATE _ 6/ 6'/g-f )

                                             'S T r P l C A T Ic bt SECTION IJ7 qp
  • r e ~ c. e o caahc.,u wea r '-

c- s e [e I e c[, ( S c [e i / 3 s ev YEGD I G' S' t },a O l c e J~ se c 'Y~ tacfv Ie Q! phase.uB

                              ,   =                  c e a+~,~ ~gn,acle+'>a L e < , -f y - ss            e6<~yed                   + t>

s ,7 ~ m /. , u .s &_ O P sitfc._,J T w t c b ec fc e s ~ i ees c( e -f , s, b o u r. (s ei 7 v , cl e d e / <t + e . ,t c P re~a ,- Rep Snp<. c. ,

                                                                                              <- s deIefed
                        , .s    s e ..     , c e    b e c. m . s e    Phcse R f c. .<       S j' e c    < c.  ,w e N , cf y     ,         /e.,byAmp
                                                     ..i( s p , cu y              cs     ,~c. L d e el ce4a...                .-

RCP cccla9 ux.+er is .sypl,ed ACCla s s k S hk k Mf YEfahd a c~ Fh5c S c a t h v e d iso . Sc$ a d . [

                                                *A

eoreia v wer ll894-C

       $) .F                                 acweaosse w o.oen m ac                               ***

VOGTLE ELECTRIC GENERATING PLANT o we f/.8/M UNIT CCMMON 1 CF 1 EOP STEP DOCUMENTATION FORM d' - O REV EOP 4 / 9'o d 0 - / REV O ERG # / EOP WRITER ///O DATE b[/PNI I SECTION I: ERG STEP

                                               ,g / o      c o e r e S p s'          ,y   dim r= R G        S+ep
              -                                                  -                                                   t
   ^
                                                                                                                     '1 SECTION II:       EOP STEP l

h /C l l X Verify Diesel Generators - . Ph "anually start both DGs. RUNNING. . 1

                                                                                                                    \,

f SECTION III: JUSTIFICATION VFGP J, re/ ,e~e- c' , c - s4a c r e .. c. 5 a -l - J ., ~ {ec .c~, ^ /, , s w a: s & fN e , f & S %e h Q 9 I+ wa e inu !vde el b e ca D ue re l g 4e ct , 1 st e c e s s c~ c y h os.rvce r e f u c. b le s AC pc-er see r<e -tu e m e . 9 a .- c y t> rres dec,~3 II S ,

                                                                                                             '7'
       ':3'Q,
  ..              .                        GeorgiaPower                                  7 ,*

Nf b w esmren oramort .,

        ,                         VOGTLE ELECTRIC GENERATING Pt. ANT                         0 4/t8/8S                               UNIT   COM40N 1 OF#3 EOP STEP DOCUMENTATION FORM ERG e   E-O                   REv   i         EOP e     lD-l                REV   O EOP WRITER            N / cr                            oATE       6[/P4 /

SECTION I: ERG STEP Oeck if RCFs She=W 8e Stepped:

a. 51 pumps - AT LEAST ONE RUNNING o. Go to Step 22.
  • Charging /Si
                                -CR-                                                              ,.
  • High hecd !I
b. RCP Trip Parameter - LESS THAN //21 b. Go to Step 22. -

(t/J) FOR ADVERSE CONTAINMENT]

                                                                                       ~
c. Stop all RCPs -

1 i H

GeorgiaPower --

           , h bh ll894-c
   ,       a                      VOGTLE ELECTRIC GENERATING Pt. ANT                       o 4/;d/gS                                                                   "'       4 UNIT CCM40N -
                                                                                            % Cr g EOP STEP DOCUMENTATION FORM ERG $        0                    REV   /    ECP $ / h<> 0 0 - /       REV _    O ECP WRITER                 h/b                         DATE_ 6((f[ [

Sc? SECTION III EM STEP Jb Check If RCPs Should Be E. gg Stopped:

a. ECCS. pumps - AT LEAST
a. Go to Step 2.1#.

ONE RUNNING: o' CCPs or SI' pumps

b. RCP Trip Parameter -
b. Go to Step M RCS PRESSURE LESS THAN 132r ..
c. Stop all RCPs.
d. Start one ACCW pump. .
                                                                                              ./

m.

  • o  %,

rosesum il894-C m esen emmew VOOTLE ELECTRIC QENERATING PLANT

                                                                                      " 0" 4/#8/BS                              UNIT         C00001                       1 OF /J EOP STEP DOCUMENTATION FORM O        RIV           !     EOP $    I d C d-/     REV    O ERG S                                       _

d )~ DATE EOP WRITER E'S 7", F i c Av/ c N SECTION IJJJ M P_ Ag Y E G P Se s (p ,, e e y t, ; , e 5 w 3,pp,,7 of wi l e w st c y e A te v gu,g o p e rb r a .a . /f's?c p o pa,- s ,u

                                                                                       ,5 RCP                                                         ,s v c -t }, e,    ccarv(yy, c_c a i i ,u s e s 8ccw pm     .w p Aeeu p           ~- p s i o p p e d,         ~

2 -P = ~ 0 < c P ,3 hpcc., e.l e 1 A e r ~ ~l . ms s f s -l e / I h e ce~~,~)_ ppect RC F m yJ -lu se bes reier c_ c : Im3 / c -l e r i <,w e , f c ,v  % 1s c; p e c u 1 e

                                                                                             //          ]
                                                                                            //-

Georgia Power ~~ 4 - O 11894-C Al ? #2 w asnsu m w wusnr *

 .                          VOGTLE ELECTRIC GENERATING PLANT                                 0 4/
        *~ag4 UNIT     COMMON a.as e        )

10F 1 1 l EOP STEP DOCUMENTATION FOPJH ERG $ [- 0 REV / EOP 4 [ fd 0 6 -/ REV D ECP WRITER A/ /$ DATE ((/f[8 3' SECTION I: ERG STEP 23 Check if SG Tubes Are Net Ruytered: Go to E 3, STEAM GENERATOR TUBE

  • Condenser air ejector rodiction - RUPTURE, Step 1.

NORMAL

                  ,
  • SG blowdown radiation - NORMAL SECTION II: EOP STEP
24. Check If SGs Tubes Are Intact:
24. Go to 19030-1, E-3 STEAM GENERATOR TUBE RUPTURE.
a. Main steamline radiation - NORMAL.
b. Condenser air ejector radiation - NORMAL.
c. SG blowdown radiation -

NORMAL. SECTION III: JUSTIFICATION 's/ [ G 9 bc 5Y@ A m II M d ree$r% S t a .u mam< ors. Yl1ese a c t- e tw C (u e

c. s c. e Lee k fo .- Ade r.0%ce.

vscp sop . /~ u, c ~ L ~ ~ ~ z ~ is . i~c /u cla d _ a c. i - w a.: e A a ~ :. e u ' nr au o p e ce r _ Jd .

 *3't
   .                                                                                       4
                                                                                             /7 a

GeorgiaPower - wI %% _Es,L

              '//t8/84 VOGTLE ELECTRIC GENERATING PLANT UNIT  CC H N f                   .

0 1 or G EOP STEP DOCUMENTATION FORM ERc # E-O REv i EOP

  • 19000-l REv
                                      /O EOP WRITER

__ DATE _ 6[///f f _ SECTION I: ERG STEP ', l 30 Ouk Asumery Building Ro& tion - NORMAL Evoluote cause of obnormal conditions. fI., the cause is a loss of RCS lnventory

                      '                     '                      outside containment, MEN go to E,CA;1.2. LOCA OUT3308 CONTAINMENT.

Step 1. i e I l 1 l f ""

g- - g _ ==s=== = fdfas -.' == eman=e, semer V LLS$4-c V0GTLE ELECTmc GENERADNG PLANT

                                                                                          ..                I
               -ess                                                                               c
                         /                                      COMM UNIT        _

for h: EOP STEP DOCUMENTATION FORM ERG $ -O REV / EOP # / d 0 0~/ REV O EOP WRITER h/A DATE _ 2 Ec? SECTION ID IHt6 STEP f 30

25. Check Auxiliary Building 29. Evaluate cause of abnormal Leak Detection Systems: conditions,
a. Check auxiliary building IF cause is loss of RCS and plant vent radiation inventory, monitors - NORMAL: THEN go to 19112-1, ECA-1.2 LOCA OUTSIDE CONTAINMENT.

e Selective cubicle monitors: e RE-0024A _ e RE-0024B e Plant vent monitors: e RE-12442A e RE-12442B ( e RE-12442C j

b. Check auxiliary building break detection system on PCP - NO HIGH LEVEL d

STATUS LIGHT LIT. I g. j l l 6 i A

              *d5-GeorgiaPower m eenmnne commen y,L m,

. . VOGTLE ELECTRIC GENEMATING PLANT 0 mm, 4/;S/8S MM UNIT OF /3 EOP STEP DOCUMENTATION FORM ERG # -O REV / EOP $ /Id 0 0 -/ REV _ C. EOP WRITER - h //9 DATE 5!/7/I J' Tw' 5 7", F l c AT / c N SECTION III* 996-@#8P

                                           ~ Air         .3 7 e g   m o. f   e   het  ~ye db a 4ep 30
                                   ~33
                                           %e 7/44/tr Ika
  • 3 s -r , f e c.+ ,, ~ o ~ fo P s4ep _qhs 4e, c. bcWe< - ~ cleIppt 6 co e sha di~3 Me -/ A a d' c f cle 4. , .'~ l ~ y $'y /en.,J c.,Aa.siede
                         *he c c ., 4 c . .. . seat .~e-< , ~ c I Je d e s
                           ~    o pecc d .> c                ~sJ. VF G P G o l'                                        ,

i c h ~ J, !, c c. ' i c ~ e c c- ~i , , a fu e/e e/. 6

                                                      --.--n-----------.                 . - ..-         -     - - - -

~' ~~ Georgia Power l' "'* N 1 kW - - - m VOGTLE ELECTRIC GENERATING PLANT 0 Y/#8/0Y UNIT CC E N 1 OF EOP STEP DOCUMENTATION FORM C' ERG e E-O arv I ECP # 19000-l arv EOP WRITEh h/d DATE b /'8/ "f SECTION I: ERG STEP 29 Qeck $econdery Redietlen - NORMAL Go to E 3, STEAM GENERATOR TUBE RUPTURE, Step 1. (Enter plant specific means] SECTION II: EOP STEP 11

      .M . Check Secondary Radiation -                        32. Go to 19030-1, E-3 STEAM NORMAL:                                                    GESERATOR TUBE RUPTURE.

e Direct chemistry to take periodic activity samples of all SGs. SECTION III: JtJSTIFICATION Yh .r 5f oP -~ 4 3 0 bc-uyGt h u -+ e , 2 3 .. -F V c c e Eo/ 6^- o. Th, r shp ecc r v c N r 'l I c c , w , . .~ n _e f 5 c h la - clo- ~ < ~ cl J Sam o, l c v c. Ires. T5 e $h se v er. lver *Y'S

                                                            .n o ~

( (* 0 9 9 Af f-cc~, w7

T . Georgia Pbwer

                                                                                   ~~            -

W .f . h ,, ll894-c

              .,                    VOGTLE ELECTRIC GENERATING PLANT               " o*

U 7 UNIT C N N_ 1 op 7 EOP STEP DOCUMENTATION FORM ERG # E-O REV l EOP $ lD-l REV O l EOP WRITER h/O P ATE d J/f J' l

                                                                                                   )

i SECTION I: ERG' STEP

    .             33         Buet Centeinment Iseleties Phase A And

( Phase 8 ' l 4 e w 9

O N* Mh3NWCf c

                                                                                 ' ll884'C-    i a

ff.f. % ,

           ,                       VOGTLE ELECTRIC GENERATING Pt. ANT                0 M /M                             . UNIT. CCMIN _                    fork
                                 ~

EOP STEP DOCUMENTATION FORM O ERG $ [-O REV [ EOP # [fc) d o 'I REV EOP WRITER DATE __ k/Mff Ec? SECTION II) 596 STEP

             ~3 Y
33. Reset Containment Isolation Phase A: ,
a. Check containment area a. Go to Step J$.

radiation monitors - LESS - THAN 3 R/H: . . e RE-0005A e RE-0005B . e RE-0006A - _ e RE-0006B

b. Reset containment isolation Phase A radiation monitors if necessary.
c. Reset containment isolation Phase A.

O j 1

     .     ~mseemn                                                                                     %,

GeorgiaPbwer 11894-C

       ,    cf.g                                     * * *siswonessenrueer
                                                                                                       *'*** =a ens                             VOGTLE ELECTRfC GENEMTING PLANT                                   0
                   +/:s/e+                                           CO M N
                                                                                                      % "* f       f UNif                                            Yorf-y EOP STEP DOCUMENTATION FORM ERG 0 E-O                         REV j        EOP 0     t' ? c u o - t                  c EOP WRITER        -

h) / p DATE 6/ 7/5-/

                                                 '#"'"N sEcTroN IJJ                  p
                                           *    *r*cnhe              is    i ~ s f < va t o d e u c~    I" c~ 4 e        pla~+ c a n di h e ~ c hv c b re< vi a r e. dir+i~ te eIs                            , ,
                                                                       %e ~~bs,~ne+
                                                                                                -f A 4 c c , 4 c~ , ~ n. e; c c. J , c + , 2 ..       ,~
                 .I f       -r k e ,- ,     ,s      8.) L                                      lC '~ f         e o s ig. -            l ci i c c. +ia~ - A R .4 c~                                       ekL
               - f L,, s        ,g      c. ~     i iv Nt c                4 S       N                  Sl
                                                                             ~<

kA< Co~ N c. s N n e a H

                   , ov                                                                                                            l" el e ~ f , C, e d , 7 4'            < c~ ds"            ~            Ie t-t Y e -t-     bees                                                            O*            5E
                                                    , r c~ ~      iu clecc4,            -
                            /c      ,4 k      r acy r~       v     %<            c p e e c,'l u r c~ s r suprocu s                    s , 9 ~ c. I u-
                                                                     + < /c e        7:e         'f i r s r
               ,          ,~sr<mereJ                         w ceeuvacv.

sreg 4 .- s ~ d

                                                                                                                /,Yc
t. =1

1 i

           ~W
                   ~
       ..                                    GeorgiaPower                                     ~*II1E_c k1                               - - ~r                                        .  --

0

   .                                VOGTLE ELECTRIC GENERATING PLANT
                                                                                              ~.            3 O         e ve+                                   umT   cn-                                      1 Or x l

l EOP STEP DOCUMENTATION rORM ERG e ES-c.I REv I EOP $ N(D l- l REV EOP WRITER h / /} DATE _ cerPtnN Te ERG STEP 4 Cheek PRIR Level Centrol:

o. Level - GREATER THAN /61% o. Perform the fo!!owing:
1) Verify letdow.1 isolation. IF N_OT, THEN manually isolate.
2) Verify PRZR heaters off. IF NAT, ,

THEN manucily turn off.

3) Control charging to restore PRZR' level greater than ide*'. . ..
b. Venfy charging and letdown - IN b. Manually place in service:

SERWCE (Enter plant scocific means).

                         ,c. Level - TRENDING TO i >*4             c. Cen. 6 charging and letdown to meir :in level at r    s*'. .

O nlP wei

r AP*8tQvak

                                                                                ~o" ~ ~

GeorgiaPower -C

          #I        b4                  aowe2 cemeuro. cuameur                  * * * '
  • 0 VOGTLE ELECTRIC GENERATING PLANT care
 ,.                                                                             ..ca w O          Y/.i/t ~c                         UNIT    COMMON                           OF b'

EOP STEP DOCUMENTATION FORM l EOp 4/IcO/-J REV O ERG $ ((~O'/ REV EOP WRITER h/d DATE b /f![f Ge? SECTION ID EM STEP

4. Check PRZR Level Control:
a. Level - GREATER THAN a. Perform the following:

17%.

1) IF letdown NOT Tiolated, THEN manually isolate.
2) IF PRZR heaters NOT 3e-energized, (l THEN manually V de-energize. -
3) Control charging to restore PRZR level to greater than 17%.

NOTE e Without instrument air charging should be established using Attachment A. e Without instrument air letdown should be established as necessary using Attachment B.

b. Verify charging and b. Manually place charging letdown - IN SERVICE. and letdown in service by initiating 13006-1, CVCS STARTUP AND NORMAL OPERATION.
c. Level - TRENDING TO c. Control charging and 25%. letdown to maintain level p at 25%.

G

CO aPbwer 11894-C M'f/b muuressenenes= mane V0GTLE ELECTRIC GENERATING Pl. ANT '*""*'O' esse UNIT FOMMON "p y EOP STEP DOCUMENTATION FORM

                                                 /                                          C)

ERG e F 5 -0 ./ agy go, , f p (3/ - / REV EOP WRITER h/$ DATE b //[/f I~ b'S7"iFiCAT/CN SECTION IJJt 6p NECb dceS /v e Y [ ct ge c, r c c m p r es Dr3 Ace b e s . T h. s- p el+ ed 'E c c ~ t-b .m y c 7 , - c j e f ej, , , q _g qka c h e , y ,,5 -f j e ; ee,4ccIfee n Eee their

      -f' l o - t s .s i e c (le c LiL c c 9 mic e m ,c eow        e x, s r -

whic( cpcc~4,o. Cicc - srm~c.esc, -F i k , '3- pecc e d e ce r < t c r e th e p-cfc c ~ w .v e .

                                         - e ~ stecs              b-,~)~~kbk.

O - 'i u - ..- t-b,'r, < m c. ; ,,,. csrscy+e .

     '3c<ua5e c@                                 f-e 4 dc~iccHug l t e , ~ cd e ,_ c 4          .s e ci
      + s t u b lis L ~ ~ %                                                Ly ,mclod,-g

( e s e l. T h,2 m ms ci m ~ ~ Pasa ~ -/ A : <>ccceduse.

        / H . c w ~ c. A s a <~ a dees'! b l's b PRER c a_ ~ e Is e T hc cpe c   m +o     c                                              / o f < .- e t m; o       s by       / " / c I / ^' "j - o e ns,.

leve ( 6 u,4+ cc ( cc 's c+ '< "' ' Mle t  ? , n d r v e ~< i (> r c. c. e ci v e c s O Er

                                                                                            ~'~'a Georgia Power
                                                                                             ll894-C O                                   -
       ,      g y g*,                           DOWE.lGthtRATION 0tpantuth?                    * ' " ~

0 VOGTLE ELECTR!C GENERATING PLANT s o,1, anosw j g t n, Iv ,) Y/. i / S V.

                             '                            UNIT      COMMON                      __

EOP STEP DOCUMENTATION FORM O ERG # [ $ - d,/ REV / EOP # / / C d /~/ REV MW EOP WRITER b/b DATE SECTION I: ERG STEP O C G rr eS f cs 10 'n') ' g ge c p il ~ c. k .- , - ( O SECTION II: EOP STEP 3eo h~ c. c_ hmoM h

                                                          ,~ c (m           ci c    -

O b  ; 4

                  '0 3 ' J '

PAGE No. p

                 ,du~,.ENO.-

REVIStoN 0

                                                                                       %g ofM 19001-1 Sheet 1 of 3 ATTACHMENT A ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A.

Establish Charging With Both Train A And Train B Emergency Buses i Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B .

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106

4. Verify BIT isolation valves - SHUT:

r HV-8801A e HV-8801B e HV-8803A () e HV-8803B

5. Dispatch local operators to do the following:
a. Open 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS
b. Shut 1208-U4-134 RCP SEAL INJ UPST'EAM FLOW
c. Shut 1208-U4-135 RCP SEAL INJ DNSTRM FLOW C
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

e. Adjust to obtain desired charging flow 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS.

O ~ f5

                     'C144 %

e #g g

JDURE NO. REVISION PAGE No. } f 0 kr of p5 19001-1 Sheet 2 of 3 ATTACHMENT A (Cont'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS
d. Shut 1208-U4-134 RCP SEAL INJ UPSTEAM FLOW CONTROL ISO
e. Shut 1208-U4-135 RCP SEAL INJ DNSTRM FLOW CONTROL. ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP f1) - e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS.

O, M m e

REVISION PAGE No. dDURE NO. 19001-1 0 " h of f-Sheet 3 of 3 ATTACHMENT A (Cont'd.) r C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.  ;
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B i'

5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT e HV-8801A e HV-8803A
b. Verify Train A charging isolation valve HV-8106 - SHUT

() i

c. Open 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS
d. Shut 1208-U4-134 RCP SEAL INJ UPSTEAM FLOW CONTROL ISO
e. Shut 1208-U4-135 RCP SEAL INJ DNSTRM FLOW CONTROL ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1200-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS.

END OF ATTACHMENT A O! v 17 - b _ _ _ _ . - , , .

                      ,e                       on-                                           _ " 084 4
                ,-                    V0GTLE ELECTRIC GENERATING M. ANT                       "o"*
 ,        I
                   +/;s/e +

UNIT ColEDI W y] o r g-  ; 6 EOP STEP DOCUMENTATION FORM ERG # [f - d e / RIV / EOP # [ ke U /- / REV O EOP WRITER - h[ DATE b f/df I%' S T*o i= I C AT l c N SECTION IJJ ame gesP UEGE dceS /v e t d a u e c ,r c c m p r es s,rs S - p ., h e d f r<. ~ M e Ac e.-+c)c~c b. es. r b l y /c _ c c ,, -F c c ( / q c, q _ g 9gq / g yg,, e h q c ) ,,

                                                                                               -E e r deir
             + le -                                  ko i L ct~     i c e ( \e c                   r c y c ir e        m ,c c g,3 r w hic (

c Po r" i s c ~. Ct c c - .- s n ees eaw s, r

  • 9 c . c e th y emefer~w,ec. <, -F T A , :s preced-ce b f*

u t S h th  % . . - es .x ft 4 ,$ T e r 5 D'tN Cj "VR'

           '33 " ' '"           * "''            '~ - '-"         ' ' ' *  'V *
  • O < s i c h lis k e ~q ( f e , ~ cd e .m c Y Le cI o dcwir' b.7 Lv ,~c Im d . -g P R -> a ( e ,_s t . T h s m ms cA c .s. .
                                                                         '-/ A     r gcccedese.

A-H w<. w - c ats a ~ w d e T he cpe cmbc ou~ c(s c esi<bl<sb P R 2- R l e v e ( e c. ~+ r e ( ky <~<cfe~j " o r m I c' tw ed '"j 4 ndcv+ =c .s =v=t M. Ie.

                ;, c c c c a m i e 3        i         ,

O ., M

         *=om                                                                        ~ ~ ~ '~a Geore. O:aPower                                 ll894-C
   <       p; f g".,2                   aow = camamanom ouanme=r is,r                    VOGTLE ELECTRIC GENERATING PLANT                    *""'O O             .
                ?,i. :/ t 4 UNIT    COMNON eaan=o 1OFA}

EOP STEP DOCUMENTATION FORM ERG # [ S de/ REV / EOP # / I c' c' / - / REV EOP WRITER M)A DATE b/ ! NJ SECTION I: ERG STEP C OrreSpcN t& ffO ERG Rt/u h ~ vsf . O . SECTION II: EOP STEP qq \l W% W%k '& nc (mae a N

    /N
                                                                                            /

rwei l

i l I AEDURE No. REVISloN PAGE No. 1 3 19001-1 0 iq, of lg l Sheet 1 of 1 ATTACHMENT B ESTABLISH SAFETY GRADE LETDOWN 1 l CAUTION The PRT may rupture while performing safety grade letdown.

1. Open Reactor Vessel Head Vent isolation valves: l l

e HV-8095A e HV-8096A

     -                           e  HV-8095B e  HV-8096B
2. Open Reactor Vessel Head Vent flow control valves to obtain desired letdown flow:

h e HV-442A ' U e HV-442B END OF ATTACHMENT B O 30

                     .m..,

NE _

                   ,h                    an-VOGTLE ELECTRIC GENERATING PLANT N*

11894-c

   . .       ,-                                                                       0 I

4/:8/04 UNIT CD09tN w.fny I > EOP STEP DOCUMENTATION FORM ERG $ F8' N REV [ EOP 0 /7c)(3 / -/ REV O EOP WRITER - M/ DATE _ b /[d [f f" T w'S 7",A:I c A T /c N , SECTION IfJtagte eggp

                          \/FGP dceS /v e t Sc ue                        a,   e e c m p r es s,rs b n e 3, r A, S - p ,14 e d Trc ~ th .e Rc e.myc),mc ehec               -f / c - c c .e + cc Ile e q _ a -t- L e            l e t c4 - ~

4 l o ~ )c s m,-3 -P e e th e , c i c c { le c kiL r o <7 c. , r e m ,c e s,3r act c P o r <~ i i o ~ . Cice-snces ou precedvre rt}cere O e p*c(crm4weo of Thir u v= , lt ble.

         -i       i k cM     ~,- cm       .~ e r e s t e r s     be   i~c j O      'JL '""se c ' 9 t '  r . ' ~ <- 3 ~-                      '*s<r+"

e sis k lis k u _% i f e. ~ c j e ,m e+Le cd o 4 d e w i cc Il WJ P R + a t e ve l. T h s -~s de~. Ly ,~c t e d , ~)

             '} M u v % n a. h s R m a d e in Whr Prcce0*'9-ce         cIs e e si < b l o h           PR*R T he cre c ebe                    ), y     i ~ i e f i ~y n o c n .. ( o e r .- ch le ve ( e e s c.c (

m t /c L le. Pcc< c a Je3 i 4 , n. s I c ~ ~ t w , c

                                                      -                        ,s    c O        .,

3/

                                                                                             ~~~
   ~ ~ " '

GeorgiaPower 11894-C

    @/ f /Q ft/;w 2                       ,,,, , , m ,,                                    ~

VOGTLE ELECTRIC GENERATING PLANT "o' ' a ,. Y/'f/89 UNIT COMMON 1 OF 1 EOP STEP DOCUMENTATION FOPR O ERG # b'C 1 REV l EOP # [(l 1 'l REV EOP WRITER h/A DATE 6/[? f SECTION I: ERG STEP Repressurize RCS within limits of m to 14 Check PRZR Level - NO UNEXPECTED colicose potentici voids in system and LARGE VARIATIONS

                                              .                  continue cocidown..lF RCS,
  • depressurizction must centmue. THEN go -

to I8). O SECTION II: EOP STEP

14. Monitor For Void Formation 14. Repressurize RCS within In RCS: limits of Technical Specification 3.4.9 to o PRZR level - NO collapse potential voids in UNEXPECTED LARGE system and continue cooldown.  !

I VARIATIONS. IF RCS depressurization must o RVLIS - INDICATING FULL Entinue, VESSEL. THEt: go to 19003-1, ES-0.3 NATL 3AL CIRCULATION C00LDOWN WITE STEAM VOID IN VESSEL (WITH RVLIS). SECTION III: JUSTIFICATION b / e o wa d b ei w p e N / 4 rt'_ c /c c e ly 5hde t$5 /N e nt h SN Clo e r~ Y/ C ^' [ h abserve we.-e , n. clu d e d a c n~ c p a r e +'a c  ; Q CLt<$u Re (e.-c ~ce Yb Tceb S p e c. 2. y. 7 c~d fdP ( 9 0 c) 3 -/ ace o e ~ s i. r ct n'r v 1 1 la l { E.

Georgia Power ~'~'* g .7 g M O ll894-C men osaame opament on VOGTLE ELECTRIC GENERATING PLANT 0

           ! /U                                UNIT    COMMON                            1 OF 1 EOP STEP DOCUMENTATION FORM O

ERG # b- O. A REV  ! EOP # ,Yd o 2 -/ any EOP WRITER /// O DATE

                                                                            /

b[/ 8I SECTION I: ERG STEP

                                     /Yo      c c, I r e s fo e, N         'N3 Fec              Ha+e O                                                                                          .

SECTION II: EOP STEP NOTE Without instrument air not available. makeup to the VCT is i SECTION III: JUSTIFICATION V ['6 P (Ic 5 ^' c T b #~ 6 C

           /5      hir We tw p r e ss e r - ~!)e-e ' ~re                       t       YO tu /E
g. le e-f c , e c. / cr . s 4 c . h.d i z ~. .: c. .~ ~ v ~ . l e L I e n t ry s 7 r u . - e r cm ,c -//~ls. s- ' hR U m e. s , /c Lle s
 ,                                            GeorgiaPower                                                                         7;';;_c b f . k b w.4                       powsm oaNem4MN oENWGMT mayisson s.o.

oars VOGTLE ELECTRIC GENERATING PLANT 0 O - , PAGE NQ.

                 =c"                                                     co = "                                                                            }

uNir t or r EOP STEP DOCUMENTATION FORM E-l

  • ERG # REV l EOP # N0l0 -l REv EOP WRITER b/O DATE_ 6 [J c[PT SECTION I: ERG STEP 9 Check if Law.Need 51 Pomps Sheoid Be Stepped:
a. Check RCS pressure:
1) Pressure - GREATER THAN 1) Go to Step 11. -
                                  /u/ PSIG (t/4; PSIG FOR ADVERSE                                                                                          -

CONTAINMENT]

2) Pressure - STABLE OR INCREASING 2) Go to Sten 10.
b. Reset 51 if necessary
c. Stoo low necc 51 pumes and piece in Os stenchy I

l l l 1 l i P03:01 ff 1

                                       , - -      . . _ , . . , . , , -     . - - - . . . . - ~   - - - - _ . - . - , - , --        -     . - - . , - . -
                                                                                                                                                          ~'~'*

GeorgiaPower ~

   ;          h f. Ws                                                                an aanno oemmew
             ,                                                              V0GTLE ELECTRIC GENERATING PLANT             .

O' 4l;9lt + *'*'2- 3 Q UNIT COMMON

                                                                                                                                                              #OF 4&                                ,

EOP STEP DOCUMENTATION FORM O ERG # E-/ REV / EOP 4 Md / O --[ REV EOP WRITER h/O DATE b Ec? SECTION ID ERG STEP

9. Check If RHR Pumps Should Be Stopped:
a. Check RCS pressure: -
1) Pressure - GREATER 1) G o t o S t e p 1 1 . -

THAN 3oo PSIG O 2) Pressure - STABLE OR RISING.

2) Reset SI.

Go to Step 10.

b. Reset SI.
 .                    c. Stop RHR Pumps.

O

         .=..,
                                                                                                     , - _   , . ~ , -

NWLT ""

   .$                                             GCO                                                                                          ll894-C m eesenneessesmer
                                      . VOGTLE ELECTRIC GENERATING PLANT                                                                         0"
           #8/eS                                              UNIT __rmDL                                                                      "3 Ord$

O EOP STEP DOCUMENTATION FORM d/d-/ O ERG f [- / REV / EOP $ REV EOP WRITER - d/ / 8 DATE @@ 0[F I i L'5 7 , / # c AT / c tv SECTION IJJ!MP 19 e c e s s a s- Y R e r e +{ , u y Sr<s Yo s7a7 c// ese / c7 e e-c.n c.s,m.4,c A is ,y Q?e s ef/i ay SE <s '< ' S o . cla rva ,y s' +e e it. n ee- s ucy to p re nc a fa c sH /er - sz vec-, u d e o ,v ~. re c i s o v /s b o c c h a u p c c/ h i n Prc~'t T' r r~ s ~ o { < 7 y mr

                                                                               < c ~+ 1 a v . c e y e e m -4 o e o e. n ~ c ~

O Jt 36

                                                                                                                                                     -c== -

Geomia D Power 11894-C l. 2- . Q< A. *4 men oe=enano= osaame=r on V0GTLE ELECTRIC GENERATING PLANT o ) UNIT CO M N 3 1 OF 7 I i EOP STEP DOCUMENTATION FORM ERG # h~$ REV l EOP # Rojo-t REv 0 EOP WRITER ll / O DATE , d M i l SECTION I: ERG STEP 11 Check if Diesel Genereters Shesid le Stepped

a. Verify ec emergency busses - c. Try to restore offsite power to oc  !

ENERGlZED BY OFF3ITE POWER emergency busses. IF offsite powpr -I c:n NOT be restored, THEN food the following equipment en the oc emergency busses: (Enter plant specific list]. Q b. Stoo any unioeded diesel generator and piece in standby j l l O 37

                      ~

Georgia Power ~{t;';;_c

     <  h f lG$tl tats                  mn anneuw onnmen                           mm, V0GTLE ELECTRIC GENERATING PLANT                       0
                .                                                                  mn "j'g/"

O usir co""o" 1 O r e e. EOP STEP DOCUMENTATION rORM ERG # [-/ REV / EOP 4 /90/O-/ REV O EOP WRITER A// 6 DATE [!O d f I' Ec+ SECTION ID ER6 STEP

11. Check If Diesel Generators Should Be Stopped:
a. Verify AC Emergency a. WHEN offsite power Busses - ENERGIZED available, -

BY OFFSITE POWER. THEN restore power to EiiFrgency AC busses b~y initiating 13427-1, 4160V AC IE ELECTRICAL DISTRIBUTION SYSTEM. O n offsite power NOT_ available, THEN restore power to TNM1 and INB10 from emergency diesel generators,

b. Reset SI, if necessary.
 .                c. Stop any unloaded DG and place in standby.                                                                            ,

i

d. Verify INB01 and INB10 d. Manually energize INB01  !

energized. and INB10. l O .

       .n . ,,

f l

P GeorgiaPbwer ~~ 11894-C b.f .h . - *

      ,                       . VOGTLE ELECTRIC GENERATING M. ANT                      o Y/8/0 Y                             UNIT   MN orh EOP STEP DOCUMENTATION FORM ERG 9 _     E'!              REV /           EOP # / 9 d / 0 '/      REV EOP WRITER    -
                                 /{/ / 4                          DATE    kd      T TJ S 7~r P I c A~i-t o N SECTION IJJJBGG geSP 14 e 'l l 0 cl c c -f         r e s r, , e-     a ffs 17e P=-er %                c-c       c3,~cy            b<r.rer mce iNC      f' d o        . t  h #s    step        e3   ecw st       t e n. T-
             -,5L           L' K C u ~ el \/ F G 13 re r u i r e .v e n$s -
                                                      ,  ~y be eveeesg~cy
            \.S e s e $ l o ~ 3 o - f s .r O                                                                 ~ .., J i n e i o
            +e , s e a : e, e i.s . m ec t a re      ge e d e J & ,                   %Rt 1. - ~ + e cs ~ a d ~
                                                          , a d. c .. fi c ~ c.

ee a%. ( r c. el p v a , ti o ,a l O 71

                                                                            ~~
     .?                              Georgia Power                             11894-C w r k&hu                   - ~ ~ ,                                 __

0 VOGTLE ELECTRIC GENERATING PLANT O. ' 4/'8/8S unit ccMMon t Ord EOP STEP DOCUMENTATION FORM ERG # b -l,l REV  ! EOP # 1901l-l Rzy C EOP WRITER h/O DATE [ [ f[ SECTION I: ERG STEP 2 Roset Centmement isolaties Phase A And Phase B O l 1 , O V8 \ n _

     .7                                 Georgia Power                              ~ft;';; c
u F k&& - , - -

cars VOGTLE ELECTRIC GENERATING PLANT 0 Yb3 /S Y CO M N {l UNIT XOF EOP STEP DOCUMENTATION FORM 4 ERG $ N '/ , / REV / EOP * / 9 O//-~/ REV b EOP WRITER h/ f) DATE 8 /'Mf4( Ec? SECTION ID E@G STEP

2. Reset Containment Isolation Phase A.
a. Check containment area radiation monitors - ,

LESS THAN 3 R/HR: e RE-0005A e RE-0005B A e U RE-0006A e RE-0006B

b. Reset containment isolation phase A radiation monitor if necessary.
c. Reset containment isolation phase A.

O W

       "                                 GeorgiaPower                                  ~~

11894-C

  • bI b ,owen oma os,.nn ,

we VOGTLE ELECTRIC GENERATING PLANT * * ")t O * *!e + uN,r ccm ~)o,3, EOP STEP DOCUMENTATION FORM ERG # [8-/, / Rzy / EOP # [kd / / -/ Rzy 0 EOP WRITER k// d DATE 4/M JT y 5'S T", i= I c Am t e N SECTION IJ7: BRG-eeE)

                        $Cs        Ta s e k c' u              LSe        8 / S c $Ir; nt                                     .

1

                                                                                               ~

W 4 S' GfG E r c; M d " 7 ' ' " * ' '" '" P / c s,Y s g e c , f, c re c i k o ds *~ (-

             ~cc.        .~ e             Je d ..
                                                                                                                        ~

O - l I O

      '031:1

I ~ Pacciou:E No.

     'APM0 VAL
         .                              GeorgiaPower                            118,4_c I     b       'k     M                powsm caNERAnom otPAmmENT            pfVfSCN No.

VOGTLE ELECTRIC GENERATING PLANT 0

      ,,n 0            4j.5je g                             UNIT       COMMON
                                                                            'com 1 OFf a

EOP STEP DOCUMENTATION FORM ERG # [8 - /, / REV / EOP # /7d//-/ REV O EOP WRITER d/ / $ DATE  ! kT SECTION I: ERG STEP O C O f C C' 5 f b N IN} ~ SRG \ O { S SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment A. O 703101 B

    'i
           ==                                                                                     -

v GeorgiaPower 3 94_C f_ 97 acasa oss.emm osam.awr

                                                                                          * ***
  • f oars VOGTLE ELECTRIC GENERATING PLANT 0 4/;!'/a g ***
  • 2
  • n/

k

                        ~

UNIT CO M N A OF M EOP STEP DOCUMENTATION FORM ERG # 6 - /, / REV / EOP $ / 9 d // -/ REV d , EOP WRITER // / /) DATE ((S//7h

                                  $" S T"i R I C 4'T- t c N SECTION IJ71 h p
                                   \l E G \3             'I*S/S~ c/ce s             ,v o ~t , . t /m je c c ~ Pressor                      pc_eeed             f c c .s    m               ~
                 /FA& Pc-+c                          s'     pp ly, d A        ~c7 ,~y          /%

V a_ ( v e s r e 7 v ce sa air s a p p /y . (Cdre[ se ,4,, cc + he,c c p e. r ~ % u . Sn e ~' 9 ciuce +a be L.c eee e+ . possiaf, Th <s le,me m f e d .T kcut ~ c er %prmer

                                                                                 & eYb c $ oE im p a

et v c< e /e. b /e, a n, s. l i e r nr %i 15 swe essacp es4n b>l.sb,~3 e he cy,~3 ~ a L =l e c] i h,, ~ H e . , .o e .- e+uc-i is  ? f v /4 t ~/ c m e hw ew bb O py'

l

    ... ~;                                   Georgia Power                     7m_c
 ..       )) f                              powen sammam* ceramment VOGTLE ELECTRIC GENERATING PLANT                        0 osn       .

Paes feo. O 4/:8/s unit co-o-1 OP u EOP STEP DOCUMENTATION FORM ERG e 5 -l.1 Rzv i EOP

  • 190ll-l Rzv O EOP WRITER h/@ DATE N((f ,

SECTION It' ERG STEP 4 Establish //> GPM Chorging Mew:

a. Close charging line flow control volve
b. Open charging line hand control volve
                 ,      c. Open charging line isolation volves   .
d. Establish //> GPM charging flow using flow control valve O

O

        '03'41
                                                                                          #5
  ..                                  GeorgiaPower                           ~g;'s_c

.' $1 'f b aowea oe e== oe umeent

      ,                       VOGTLE ELECTRIC GENERATING PLANT                      0 n         "['/N                                UNIT      COMMON aaos w U                                                                                 Q\ op 24,)

EOP STEP DOCUMENTATION FORM ERG #hb~b? REV f EOP # lk hk REV O EOP WRITER /// 8 DATE d /M[T$ Sc? SECTION ID E4M STEP

6. Establish Charging Flow:
a. Open CCP normal a. Go to Step 6c. -

miniflow isolation valves.

b. Shut CCP alternate miniflow valves.
c. Shut seal injection flow O control valve HV-182.
d. Open charging line isolation valves:

o HV-8105 o HV-8106

e. Shut BIT isolation valves.

l Sg'

asesora -- GeorgiaPower ll894-C

            .d f b                            ,,,               ,

care VOGTLE ELECTRIC GENERATING PLANT **f O

                 ' 4/;3/e +

UNIT COMMON EOP STEP DOCUMENTATION FORM ERG # [3 - f / ggy } gay y j7gj,/_,1 Q EOP h'RITER ////) DATE [/A./T'r

                                'E' S 7~, F i c A 1- f e u SECTION IJ71 hp
                                    '     CW              r osy /     ~}- }      g,7 ence//e( %                   n   ,,         \c                         P lc ~            ~

e<r,,2c /s 4 , ck _m, cy ,, si~ 3 , - c. /m j e g Dec?'fcce. -- s g e c ;f,c .M 6 4 step.P/m

                   /~[^<r                                                         --f l e-       e<

O f e s 4' b I - A ~3 e A - r y ,s a . < <

                                                                                                      ~
                    /wo /v dd                ,~   4 A,e         s+, g       >  ~he                      .

vre - -f a e a u .a c n .J i n c-s e n -P 4 ~ im,,,if'/aa e s a /c + t a ~ v ~lv e s - f7' i

ka

                                                                                 ""{t;',1_c
       '7     ,
        /* 7 kb}.>A GeorgiaPower possn anusunon ososmsur                  ,__

0 pre VOGTLE ELECTRIC GENERATING PLANT 0 4/,5' j e UNIT COMMON

                                                                                 **os no-1 OF#

2.- EOP STEP DOCUMENTATION FORM ERG # [E- /' / REV / EOP # / kd //-'/ REV COP WRITER kf / h DATE N C SECTION I: ERG STEP O CorreSfk& i nr } E c c- Nets,

                                            ~

SECTION II: EOP STEP NOTE Without instrument air available B. let aan should be established using Attachment f O 47

assama --

 -                                    Georgia Power                                 11894-C bb                              ,,, m        m                             " *
  • 0
                           VOGTLE ELECTRIC GENERATING PLANT om
                                                                                   *
  • 3-
  • UNIT COMMON EOP STEP DOCUMENTATION FORM b -// / REV / ECP 4 /P v//-/ ggy C ERG #

EOP WRITER h / 8- DATE I/Mt//77 5 S ro P I c A t- t e N SECTION IJ7: spe-oggp

                                                                           ,v o T ,       t /% sf g
  • 5 / } rv C[ c e s
                                                                                       .v c c .x %                   '
          "'r       ccm      pressac P-ere ly,      L e + g, _ ,_,         -pf, w i E R k Pc ~ e -                s~    pp a , c. g y p p t}
          ", * "N < 0 I       v  a- ( v  e  s   r e  9  v . <- e  za se <4is
                "" + " * ' "           P ' e d' o "- 8~c'-
                                                                                                    ~'

es duc, +a we O -Se c Th 's pre Possiale - $b c uf n air c* soft *T ?ct Im p l e ,s c> a k e e) e t L. e e f' a u < /c h /e, a r, sHec~a4 ev e c

  • S S e' r /-
                                                                       'I Ivi de w c s 4 c. lales6,~)                        ~
                                                                           'S     ' " ' I" cle d
                                                    ~ e. ~+ k c      -
            'T h,,        ~He.v oe YG t
                 'v     b 't~/ c. c h e~e w
                                                                                              $'?
                                                                             ~ ~ <~c APPAQVAL

- GeorgiaPbwer t18 "-c

         .^ f kdub                     . .. ...     ....   . ,
                                                                             **'O    ' '

VOGTLE ELECTRIC GENERATING PLANT car eaan o. 5!:?/t + UNIT COMMON 1 OF l EOP STEP DOCUMENTATION FORM l ERG # [8 - /, / REV / EOP # /f d //-/ REV b EOP WRITER h/ h DATE /b [ff SECTION I: ERG STEP fD Cctre5pcM C iNy ffC Alc) T LT 0 ' SECTION II: EOP STEP NOTE Without instrument air makeup to the VCT is not available. O 63 F33'C1

  ~                                                                           ~~

Georgia Pbwer ll894-C r, 70 f .Q , 0

   .,                        VOGTLE ELECTRIC GENERATING PLANT
                                                                              **7 4/;8'le y.                            UNIT    CO M N                     y oph EOP STEP DOCUMENTATION FORM ERG $    88' /* /          REV      /        EOP g   / f d //-/    REV EOP WRITER h/O                            DATE     [/dY[7f
                           $%' S T"o R I C AT / c N SECTION IJ7 IMMP 4 91liP E65            b 2 Sty n         boes      McT   gmcfv        e con pcasscc po-ec o el -(' c o n m
         " ^'       ao r IE P0-ersu o r l y . (f c r n a he y cea1'c.cf va lves eq,e,ce m~                           n . c. se pely for Y l e <c 0 iM rc~Si c u .        Oecce - se i$rs p ossi J /e Scc Q                                                   -h,     b  .   ,~ ele-e           +es
                                                                                                 ~

1 A,s p ,. c c o a cc e J n uc t la b le cm , ko t 2. ~ e,. , c

c. < ns er- sscc lud e +o > ~ Sc e ~

th , s N org w ag in s

                                                                              , ~ s r c e - e mi ne -'/I          .4   eJ
           + he opec cfor
             %1c       % p o . f e r ,- 4hr                         5    ep O

67 F03'4'

           ~"                            Georgia Power                                " " ' ~ ' '

o ll894-C

   ./
            ;4 o7 g A,     ,

newsa onneaanoa os**me=r ,, . VOGTLE ELECTRIC GENERATING PLANT 0 o ,re l:Sje4 - son no. / z.

                                                 ' UNIT    COMMON                          ,,,l'         OF-F EOP STEP DOCUMENTATION FORM ERG #   [8 - / /       REV         /       EOP #    [ 7 6//"/        REV                6 EOP WRITER        Mh                                  DATE      ((bY!If SECTION I:   ERG STEP O        COrre5pcN                   I
                                            &~ e 6             0 A va /c a Q                                                                                                                -

SECTION II: EOP STEP CAUTION Without instrument air available CCF suction should remain aligned to the RWST. O 5.2

r m -- GeorgiaPower ll894-C y y.g a ma mno % N*

   ./                                        VOGTLE ELECTPlc GENERATING PLANT

_ cars

                                                                                                                                               * * 2-              p O            4/;S/6%                                                                   UNIT    fol440N                                             < 0e ,fy EOP STEP DOCUMENTATION FORM ERG #                 b -/ /             REV                               /     EOP #    [k d //'/                            REV                 O EOP WRITER                        hfD                                                                DATE        S/ SY!TI'
                                              '5 T~o G I C Avlq y SECTION IfJ: h p Y FG 9 cl " s '3 ~ c/c e s u d                                                           iuclude
                                                                                                               # m             %               / r                At
            " "' "~presscr P ~ e -- e d                                                                                      a u cl                / c T~

s u p pl y , C f az e y _, ~ ; f / c w sun ty - D "' e r an a , ,- c e p o i ,- e , u fo r m cc-~4rc I va(ves " / ,3 0 0 L? T/ O pr

                                     $h e oc o y a c f ic y, c                                                                                           ig

(~ cr l < s- u n o va ilr b ' i he o g e .n c$c c i f -t h e V C T c = .- a tro s ( i 7 r, + d sA, lJ r e .- coPsu e i <cu

                -I           t h e tawsr O

FJ

        '03'a t

s - - - - - .

     -                                                       Georgia Power                                                          tt:34_C e
      $j.[; %

w omeemamm N 7 m* 0 voGTLE ELECTRIC GENERATING PLANT oan m o.s y 4/t!/Bf 00 MIN t OF A Q UNIT EOP STEP DOCUMENTATION FORM l EOP # ROli-l aEv 0 ERG # b -l,l ._ REV ECP WRITER h/d DATE bY/W SECTION I: ERG OTEP , 19 Caswrol PRIR Pressores

c. j{ normal spray NOT available and
a. Tum on heaters and operate normal letdown is in service, T_ HEN use spray as necessary to maintain auxiliary spray. g g, THEN_ use one pressure stable PRIR PORV.

Q . O

                                                                                                                     '                          rr
      ~
  .                                       Georgia Power                                         ""Eis _C
  ,    u_ks w                            - . - -

V0GTLE ELECTRIC GENERATING PLANT 0 nos *2 2 O +/ e ee + unit co an" w or e* EOP STEP DOCUMENTATION FORM, EOP # /P d / /~/ REV O ERG # [3 'N / REV / EOP WRITE 5t A/ / $ DATE [/Ekff Sc? SECTION ID -EM STEP j

19. Control PRZR Pressure:
a. Restore power to PRZR -

backup heaters:

1) Check power to 1) Restore power to -

Emergency Busses - switchgear 1NB01 and 1NB10 from emergency SUPPLIED BY RATS. diesel generators.

 .O                      2) close feeder breakers to switchgear 1NB01 and 1NB10:

e 1AA02-22 a 1BA03-18

b. Energize PRZR heaters and b. IF normal spray NOT Wailable, operate normal PRZR spray AND letdown is in as necessary to service, maintain pressure ~ HEN use auxiliary stable.

pray. F letdown is NOT in Irvice, HEN use one PRZR PORV. O

                                                                                                                            ~

5~'

        '0 3 ' O '
  " ia==                                                                                               Geop..aPower                                                      uns4-c y .y . 6                                                                                                  ~~                                                               a.

voa m m.semeasnanam e w uan mm- ' #3 O #8/w _ OP STEP DOCUMENTATION FORM

                                                                                                                            /Pau-/                                 azy                o ina                                    ESM /                                           - arv   /     x0, ,

so, wmI m . #/4 OAT 7/2 c/rr r n l 7S 7", F t c A t / c N SECTION IIII h p S v p p / I e cd b

                                                                                                         &    Cr Are n... n...
                                                                                                                                                                         -,.s i~                                                              w                       <

Y's me,f$ err ft re b Y h tS

            )3 e /

N S e r vic G o~ g/u ,~, ne% '

                                                                                                 , ~ si r v et , c ~                                                                           ~

s g c #,c i s p s v. c/ e d . . g e r vic e O ,~ O f6 -

GeorgiaPower ""Tgg_c a f. h - - - _. 0 - =- VOGTLE ELECTRIC GENERATING PLANT mars m == r V Y/'8/0 Y UNIT CO M N 1 op y EOP STEP DOCUMENTATION FORM d ERG # b -!.I REV l EOP # 190ll -l REv EOP WRITER M/8 DATE i d[dkTI l SECTION I: ERG STEP Check RCP Coeling - NORMAL Establish normal cooling to RCPs. Refer 21 to (Enter plant specific procecure numoer -l

  • RCP CCW System flow nd tittel. l a RCP sealinjection flow
                                                         .                                                                                                                          ^

O - O f7

              . _ _ _ . __      _ _ _         _ _ _ . . _______.--_- _ __._..__,. ..__. ____ .___..-_.__ __ .._,____ ,_._=___
     '       ~

GeorgiaPower Tg_c k f k&hu maeao m m . om VOGTLE ELECTRIC GENERATING PLANT 0 Sli!/t % , UNIT CO W N

                                                                                                                    'Y O? h EOP STEP DOCUMENTATION FORM Eac . E s - 1. I                  aEv         l     EOP
  • 19 o I l- I aEv o EOP WRITER O/Q DATE b[&NfN Ec+

SECTION ID ERG STEP NOTE be adjusted using seal injection needle valves.W ,

21. Check RCP Cooling -

NORMAL: 21. Establish normal cooling to RCPs using Attachment C. - O a. Annunicator alarm: Accw RcP ctR to rtow - CLEAR.

b. RCP seal injection flow -

NORMAL. O . 4

           '                                                                       GeorgiaPower                                                                                              7 ,L Nf $                                                                me. une.aemmme                                                                                          _,

0

             ,                                                 VOGTLE ELECTRIC GENERATING PLANT j0[0 Y                                                                                                                                                        mm Q                                                                                          UNIT   CfMinN                                                                                        ,yg op gy y

EOP STEP DOCUMENTATION FORM ERG # E f'l. I REV ) EOP 4 [4ofI-} REV O EOP WRITER d// $ DATE ( / ,4.4 M < 5 'S'ri P I c A v io u SECTION IJJ % p ea C /3 S f G.c , hi c m a f/ o / f(fa c s -f e s + ~ h I, s k , ~y re c 9 z se~\ e-ti,,,, c.AaeA,.y see coct,s.y ~ece

                    /h atA . d'c c/                                                              i ~ ., +r v e im ~ c ~

i,,efu. fed'. /b rE

                                                                                            <s                                                                                             ,

se % / s i,Yk / ^< 3 b" ' Y" ^'. m m , d u . ~ , s. ,' 12 c P O ~,c. O FY

    '                                                                                                                                                                   ~~
      ~

GeorgiaPbwer .# w mm,,, m ,,

       $) -[                                                                                                                                                                                  0" VOGTLE ELECTRIC GENERATING PLANT Y/!8/6%                                                                  UNIT       00MW1N                                                                                         1 OF EOP STEP DOCUMENTATION FORM i            EOe e             19011-1                                                 REv o

era e ES-l.1 REv EOP WRITER A// O DATE d/S 77 SECTION I: ERG STEP 23 Cheek if Olesel Genersters Sheeld Be f Stepped:  !

a. Try to restore offsite power to oc
a. Verify oc emergency busses -

emergency busses. ENERGlZED BY OFFSITE POWER ~ j bc Stop any unloaded diesel generator and place in standby l O . O i 56

    -                                                                            ~

g GeorgiaPower

M k&M -- _fg,1_c VOGTLE ELECTRIC GENERATING PLANT 0 0 +/a/e * . unit co-,u ~#0,A EOP STEP DOCUMENTATION FORM O

ERG # [8- A / REV / EOP $ /7 d/ /-/ REV EOP WRITER U/G DATE IN 7 I sc? SECTION ID -E4W STEP

25. Check If Diesel Generators Should Be Stopped:
a. Verify AC Emergency a. WHEN offsite power Busses - ENERGIZED BY available, ,

OFFSITE POWER. THEN restore power to Gergency AC busses by initiating 13427-1, 4160V 1E ELECTRICAL DISTRIBUTION SYSTEM. , IF offsite power NOT ivailable, THEN restore power to I E U1 and 1NB10 from emergency diesel generators.

b. Stop any unloaded diesel generator and place in standby.
c. Verify 1NB01 and 1NB10 c 'tanually energize INB01 energized, tnd 1NB10.

O .

     'C 3 ' 3 '
    ~'                                                                            ~~~

GeorgiaPower 11894-C ~' ElIb ... on,. . een,n . , 0" ar, VOGTLE ELECTRIC GENERATING PLANT Y/S/0 Y UNIT COMMON OF EOP STEP DOCUMENTATION FORM EOP # / 9 0 //-/ O ERG # FS - /s / REV [ REV EOP WRITER h/ d DATE M[ f

                            'Iw' S 7~, F l C AT / c N SECTION IJT! N P Pi a ~ + s ir e c Me n e +) e s' o 42
                                                                       ~ere        i~ c l" d'I r e si s c i ~y o F-F' g i+ e p e - e .-
                ; u soi    - a e         cueu ave                 veoJed 40c                  .

t~ d i c c + < a ~, 6 c ,e 4 c c ( ccJ p c. s ,-l i c ,~

                + hoc, L c,              +hey              e .- -    <~cl dodc O

O 662

     '03 ' C '
                                                                               ~~

N Georgia Power ll894-C

        $) .y g                                                                      0" VOGTLE ELECTRIC GENERATING PLANT 5,

un ,.. O esfe# ,,,, cm,, t or EOP STEP DOCUMENTATION FORM 190ll-l azy C ERG # b ~l.I REV l EOP # EOP WRITER M/ 6Z DATE N[TI SECTION I: ERG STEP , b/N f0 c' o r r eSjo e el 4 A c b M O AI

                                           /[ k $                                            .

0

  • SECTION IIt EOP STEP 2G 0 g%c k me d A incIude el SECTION III: JUSTIFICATION / / .s 4 O. - M m
  • n/ w o0
                                                     -P p /a c           r + 2,s     , ~ fa, n n), a c incIvde d in           ,
                                          '.'ea    c                  .~

oiv S-f e a ec . S'e>e 'T' c4,4 ccl/,:~ e 4 WerE O b c- 4 ' e e A 5 4 e p G,

                                                                                               )7

I PAGE NO. VROCEDU,4E NO. REVISION 0 15 of 23 19011-1 Sheet 1 of 3

  ~                                  ,

ATTACHMENT A U ESTABLISHING CHARGING WITHOUT INSTRUMENT A. Establish Charging With Both Train A And Train B Emergency B Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-EiO8A e HV-6308B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106

4. Verify BIT isolation valves - SHUT:

e HV-8801A e HV-8801B r~s e HV-8803A g U e HV-8803B

5. Dispatch local operators to do the following: SS.
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV
b. Shut 1208-U4-134 CVCS SEALS FLOWISO. CO
c. Shut 1208-U4-135 CVCS SEALS FLOW CON
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE V TO 11 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4) 6 CVCS

e. Adjust to obtain desired charging flow 1208-U4-13 SEALS FLOW CONTROL HV-181 BYPASS.
    )W cGild

PAGE No. PRoCEDUT.E No. REVfSloN 0 16 of 23 19011-1

  /

Sheet 2 of 3 ATTACHMENT A (Cont'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Triin A charging isolation valve HV-8106 - OPEN.
4. Dispatch Local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438 b Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYP j
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 i
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE pa ' VLVS TO #1 SEAL:

I v e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) . e 1208-U4-417(RCP #4) to obtain desired charging flow 1208-U4-136 CVCS

g. AdjustSEALS FLOW CONTROL HV-181 BYPASS.

09 (lS~

                                                                    ~_

REVISloN AAGE No.

   *      ,PRoCEDU;.E No.

0 17 of 23 T 19011-1 Sheet 3 of 3

                                       ATTACHMENT A (Cont'd.)

C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-85083 -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Tr.in B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

5. Dispatch local operators to do the following
a. Verify Train A BIT isolation valves - SHUT e HV-8801A e HV-8803A
b. Verify Train A charging isolation valve HV-8106 - SHUT

{} c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET IS
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUT
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

END OF ATTACHMENT A O

   %) e l

{

          ~                                                                                      h-GeorgiaPower                                 ll894-C Q .f . g    .                                         ,

VOGTLE ELECTRIC GENERATING Pt. ANT o

                       !#0/0Y                                   UNIT    copeenN 1 OF EOP STEP DOCUMENTATION FORM ERG #    E S-l.1                 aEv      i        EOP e    19 0; 1 _;     aEv     o    i EOP WitITER             h /b                                DATE       [/8//ff" e                SECTION I          ERG STEP 2             lleest Castelsemat feedeties Phase A And Phase 8 O

i l i O

         ' 3J i d e

[7

Georgiaoower

        ~"                                                                    ~~-

11894-C " Ol b b4 wa ase.eme meat **" on VOGTLE ELECTRIC GENERATING PLANT o 4/;3 "aos ao 2_ 3 GQ ' I g untit CHnN .yor g P EOP STEP DOCUMENTATION FORM ERG # b' S ~/, 2- REV / EOP 4 / 2 0 / 2 -~/ REV b EOP WRITER Af / 8 DATE I/A Y!ff' Sc4 SECTION ID ERG STEP

2. Reset Containment Isolation Phase As
a. Check containment area .

radiation monitors - * ' LESS THA'N'(3) R/HRi , e RE-0005A e RE-0005B O e RE-0006A ' e RE-0006B

b. Reset containment isolation phase A radiation monitors if necessary,
c. Reset containment isolation phase A.

0

       .m . ,

b

        ~
          ~'                                                              -~

Georgia Power 118 "-c NFk& . .... , _ ,. .., um VOGTLE ELECTRIC GENERATING PLANT 0" 4l:S'/e y esosn 3 y Q. UNIT COMMON NOFM EOP STEP DOCUMENTATION FORM ERG # [$' /< 1 REV / EOP # /9 o [2 -/ REV C EOP WRITER A/ / A DATE [/2 Q p L s r,1= r e a vie u SECTION IJ7 Bes.qpesp Y$0O Ye5tyn hoe 2 p eY V S e Th e r e -C c 2

                                                             ,hwrs da. lel e d, Q h e. .r e B cm4'~4'c" R e s e. 7) , 5 ~ - s ~ - e o+ b r e s e+

c4cc s ,, yecw sraey mm O e kc se A"4'"~ O iv:, f)y

r -

                                                                                  ~~

a f /dh GeorgiaPower VOGTLE ELECTRIC GENERATING PLANT g _g7,q_c 0 Y//8/BS UNIT COM40N 1 op g EOP STEP DOCUMENTATION FORM ERG e E S -l.1 REv i EOP

  • 19 011-l REv O l

EOP WRITER M /d DATE (($I[I[ SECTION I: ERG ' STEP 11 04:J.e RCS To RefE Pt2R:

o. Use normci PRIR spray a. Use one PRIR PORV. E no PORV available, THEN use auxiliary spray,
b. PRZR level - GREATER THAN //l>% b. Continue with Step 12.

((121% FOR ADVERSE CONTAINMENT] WHEN level greater than //11% [/121% for adverse containment], THEN do Step 11c.

c. Stop RCS depressurization O
                ~

26 w;t

r GeorgiaPower ""fy;'i;_c Z" nr IdM -..... - - -, VOGTLE ELECTRIC GENERATING PLANT 0

        ,7, "o*
  • 7_. 3 O

(/

                 .4/;3
                      / b,                        UNIT COMMON                         -1 "OF M EOP STEP DOCUMENTATION FORM REV   /      EOP 4 / Ed / } '/       REV       b ERG #    [8 /                                                        _

EOP WRITER A/ /8 DATE ((# //i[ Ec? SECTION ID E-RG STEP

11. Depressurize RCS To Refill PRZR:
a. Depressurize RCS using a. Depressurize RCS using normal PRZR spray, one PRZR FORV.
b. PRZR level - GREATER b. WHEN level greater than THAN (21)% ((50)% FOR (21)% ((50)% for adverse containment],

ADVERSE CONTAINMENT]. CONTAINMENT]. THEN do Step lle. q O Continue with Step 12.

c. Stop RCS depressurization.

O 7/

          '0 3 ' 0 '

r

            "**                                                                ~'~'a Georgia Power N $ lGlAAiht               ocwen aannur'on ovsment                     "'
                               VOGTLE ELECTRIC GENERATING PLANT                      O

( Y[S/0 Y UNIT COMMON .-t-oph EOP STEP DOCUMENTATION FORM ERG # [$- / /2- REV / EOP # [ PC /2 -/ REV EOP WRITER h!f) DATE Y fl~ Tu S T P I c Ar t e tu SECTION ITJJ N P P/n~4 s p i f,c uc ta e s ~~, IN c I u d e d. // h u c. s ree r y aw ' 2 e d Yo e , am re G. eyce l e c~ O c m % ru Ie s c f u s b e c a f e b a + >c i l r c r y s P r a y w a S de/ eye a shacy,~ya.~et./efh~~ (wb.c k<s se+ . N e cers s ry fer s v x , / < w ry s o r ny} a r e nf I bis si' P-I~ s e (vic e n v P03'C'

                    '""'                                                                              ""'~'*

Georoia a Power ll894-C g'7 gA Powtm GENERAfiON CtpARnatNT 0 o r. VOGTLE ELECTRIC GENERATING PLANT cm esat no. > N" ') 4/:6j'b <4 UNIT COMMON 1 OF g EOP STEP DOCUMENTATION FORM ERG # [8 - A 2- REV / EOP # / 26)/ 2 ~/ REV O EOP WRITER M[O DATE //A 9 /7e SECTION I: ERG STEP fo Ocrr4 S ;o c N IN}

                                                         ]5% $ WCTE                _

(3

 % ,l SECTION II:     EOP STEP NOTE Without instrument air available              char t,ing should be established using Attachment B.

SECTION III: JUSTIFICATION Sc> c h n sJes '.

 !O N ,)

j P03 ' 0 '

F .

                                                                                                                               ~~

P GeorgiaPower uS 94-C wp m ___ " V0GTLE ELECTRIC GENERATING PLANT 0 O */'/*

  • usiT cn>+ina ">Or %

EOP STEP DOCUMENTATION FORM Eno e E S - 4 2- azy / EOP e /# e /1 Y arv o EOP WRITER M//f DATE k [ TwS7,F# CAT /crv SECTION IIII H P_

                                                                         \l E G ?        d e s , 9 ,, c.f c ,       ,    , , .'t   . .a A d .-

cer c c c~ pressor p-e,ed - c c .m  % ppl y, d A ~ep ,~) -F/cs

                                                         /r AG. po-ec                  w
c. i c s v p p ly c c ai c e / v c. ( v e s r e ej v . c e s-ec + heir c.pe c dr o s, 3 +> c " v s e ei is
                                                                                                                  ~d v ~ e       %       o=

O -Sc c Th 's eu . p ogsi ,( , e e c. _,Y(,euY ~eIe c'ciwfre'5' Ic/'

                                                             .-   pie.-e~4eJ                                            " E t I' ' E
                                                                     /e_6/e,n.n,          q   l i e e ni c i -

avae > e o s se rp

                                                                                                                    ,5      ci c 5 -b c Y I n S h n e-C G r} I")                 
                                                                                                                                 '^'",'     "",

m H y .. r, o e ~ e+k<- -

                                                           -f    n,,

9 j ,, f9 T/ c e hmew O N

F

             ~                                                                            --

GeorgiaPower

                                                                                              '," -C 2 Ik&hu.                                          ,  - ,

VOGTLE ELECTRIC GENERATING PLANT 0 Y/'0/0Y UNIT COfe40N g op f EOP STEP DOCUMENTATION FORM ERG e E S -l.1 aEv I EOP e 19011 -1 nEv Q EOP WRITER ///d DATE N Y/ IS~ e SECTION I: ERG STEP _ H istubEsk Ild) GPM Charging Mews

o. Case charging line flow control volve
b. Open charging line hand control volve
c. Open charging line isolation volves
d. Establish //4; GPM charging flow using flow control volve 1

O y.

                                                                                                   /)
               .s, . . .

c GeorgiaPower ~~iiG _c fu / /Qft/s.4 e oe.saam ee- me

     .      osn                   V0GTLE ELECTRIC GENERATING PLANT                 0 O             +/'<e+                            uNir co * "
  • orm EOP STEP DOCUMENTATION FORM gga , (;$-l,Q agy } EOP 4 19of a REV O EOP WRITER g/j DATE bSNN Ec?

SECTION ID BM STEP

16. Establish Charging Flow:
a. Open CCP normal miniflow valves, a. Go to Step 16c.
b. Shut CCP alternate O

v miniflow valves. .

c. Shut seal injection flow control valve llV-182.
d. Open charging line isolation valves:

e l{V-8105 , e liv-8106

c. Shut BIT isolation valves.

O . 76

F

              "                              GeorgiaPbwer                           7

_pg_c

     .s m

s> ;r htaz- - . _ - . - . , VOGTLE ELECTRIC GENERATING PLANT f 0 b [' /0 Y UNIT CO M N OF EOP STEP DOCUMENTATION FORM ERG 8 [ $~/,2 REV / EOP 4 / 7d / 2 ~/ REV O EOP WRITER ///// DATE  ! !6 Iw'S 7", Ar t c AT / c N SECTION ITI!IHWHBOEP

                                \lEGP d e si9a                   c[o e. , n ,-f , n a /v ej ,

h n ~ cl e c ~ f r e i ec lve, c~ d har3in,) fic ~ e + 1u ci s E es +"6A'~> - P la ~ v' s po e S /s ~ Y

                                                              <~cle      d e el.

mere c h c. cy , ~ y -f l e ~ Irc ( ~c I

  • J '* d '
                                                        -e-<      N

(^) specifie vs I u. e' s << h P " v ' f l < ~ r i ~ c /v J e s' v 2 1 T ns' e l u 4 is ~

                                                                     '~   ' " '    "S      ' ' "

ccp cv~ ..+. 6 c~ M k ' '

                                 ,v a , m m /   ,,,, ,, f /o~ vn A 's.
                  ,geev l

lV 7 _/_/

r . GeorgiaPbwer Tg1.c - W f kd/pu, w e no= -  %. we VCGTLE ELECTRIC GENERATING PLANT 0 o V 4/is/eV UNIT NM m. 1 0F fr y EOP STEP DOCUMENTATION FORM Eaa e E S -l.1 arv I EOP e _19011-1 REv O EOP WRITER k// 9 DATE W SECTION I ERG STEP ', 24 Cheek If IHesel Generstws Sheeld Be Steppede

o. Verify oc mwgency busses - c. Try to restore offsite poww to oc EMRGlZED 8Y OFF$ lit POWER , emwgency busses., .
b. Stop any unlooded diesel genwofor '

and place in standby O O

                                                                                                            ,y
                      '                                                               ~~

Georgia Power Ef Ws I 11894-C 1 N mn aan,eum oensmee

                ,-                     V0GTLE ELECTRIC GENERATING PLANT                   o Ybd/ W                           UNIT  CO W N                       [oph

([]) EOP STEP DOCUMENTATION FORM Eno e ES -/, 2- arv / EoP e /9o /2 -/ aEv 0 E0P WRITER ///O DATE_, /7f Sc? SECTION II) EM STEP

24. Check If Diesel Generators Should Be Stopped:
a. Verify AC Emergency a. WHEN offsite power l

Busses - ENERGIZED BY available. 0FFSITE POWER. ,THEN restore power to Emergency AC busses by initiating 13427-1, 4160V i 1Z ELECTRICAL DISTRIBUTION SYSTEM. q C' IF offsite power NOT - ivailable THEN restore power to INBil and INB10 from emergency diesel . generators,

b. Stop any unloaded diesel -

generator and place in standby,

c. Verify 1NB01 and INB10 c. "anually enerE :nL 1NB01 Energized, and 1NB10.

O

        ._- Y
                                                                                                /t il 4'

F'-- V

       '          ""*"'                                                                ~ ~ ~

Georgia Power ' " -C 70 f M A ,u. . .... . - ~ 0"

                   .                      V0GTLE ELECTRIC GENERATING PLANT (3              4/;8/e +                              CG#10N
                                                                                       **3y   op3 g x_/                                            UNIT EOP STEP DOCUMENTATION FORM ERc e    F r /, 2.       REv   /       EOP # /9#/2~/          REV EOP WRITER       d// O                          DATE  ,   /        [

Tas r, s o e arie n SECTION IJ7 mp P h ~ + .s p e i L na+L.ds a 4-A c e n. e c y e n cy h u s s e .1 by esary1219 of-Ps,ie p4~ec weee ,~c.Isdad ,

                                                   / tv G / o   m L s-t-   6 o ' e u e ry ,2 e l-
                            / p/ e o ( s J ej p r e ur el e     c o rt+ c c l r o d p e .c t i t e H 9                  %

f e, el , c a i , c u ,

7 i
                                                                                                 ,3 o     :
  • n e. l

a~' Geo iaPower ll894-C l' d2%:. 4 ,owen as=en4re espans=t 4, 0 VOOTLE ELECTRIC GENERATING PLANT osse aw 1 op 1 U 4/.9/e e UNIT _ C0$d*80N . EOP STEP DOCUMENTATION FORM

                                                                              /Ede)C-/              rey           C ERc e E-D                        _ REv      /        EOP $

E0P WRITER sA DATE 6,// 7/A" SECTION I ERG STEP _ Manually trip reoctor. @ reactor will NOT VerWy Reester fr$ trip, THEN go to FR 5.1, RESPON51 TO

  • Rod bottom lights - LIT HUCLEAR POWER GENERATION / ATWS,
  • Reoctor trip and bypass brookers -

Ii'RI-OPEN

  • Rod position indicators - AT ZERO ..
  • Neviron fiva - 0(CREA$ LNG SECTION II: COP STEP IMMEDIATE OPERATOR ACTIONS
1. Manually trip reactor,
1. Verify Reactor Trip IF reactor will NOT tri ,

TITEN manually opTE" supp y e Rod bottom lights - LIT. TiidII breakers to INB08 e Reactor trip and bypass and INB09. breakers - OPEN. IF :cactor NOT tripped. FR-S.1 I; gi x . TITE ; go to 17711-1 t $0

  • RELf0NSE TO NUCLEAR POWER GENERATION /ATWT..: ,['

[.c h JUSTIFICATIO?{Y![6De(e_.s.... ,, _ / , , A ; 2 . ' ,. . , n - .. j th. m GECTION !!!

                  , $ D c. ~ C. n .. r ..,.. .

9 p ctf NmaSc~.O Inoe-,G,L.S.- 1% , 9~ LLQn 4t rv-s,t....0e. ..,..-{ % .s a, C', t.... m._,.. < e ._ , , .... . i.f..L , V u e n aet i Mw u-ed iVEoS j INBo? *vtylym untr,l m .

                    .2   M k -+ a e.a*~ -- -n w , e . A 6 ra ,a ar, c.a ,.iu t,
                     .eto v m ', A f n

c GeorgiaPower ~E;'s.c M le s k - , - - - . , _, 0 VOGTLE ELECTRIC GENERATING PLANT 4 ,' , O, Y 1 OF 1 b) UNIT __ COMM0h EOP STEP DOCUMENTATION FORM

                                                      /        EOP * / 70 d d * /          REV       O ERG #       h~- O              REV DATE        d /2        I EOP WRITER SECTION I          ERG STEP _

C 0 V t' C S' p ac N c IN} ffo Ex6 S te P p- *

     ~-

SECTION II: EOP STEP _

l. Verify Pro o. Manually actuate SI*

Actuation:per ESFAS IF nroper ESFAS actuation

a. MLB indications can NOT be verified, TitEN continue with correct for injection phase after load Step 7.

sequencing.

b. Go to Step 13,
                                                                                       "       4     N"      M SECTIOtt III:         JUSTIFIC ATIO!1 -O Me 3                   -
                        -.a   _n ~. y        LD P                 L'  * *%= ',)   W~
  • h ud1 W - *W

( f f hY D "f e h A- s

                 */mi 1 4 _v .. d 4 s.rs-a                             <                                                          .

s.

                                                                                                ~~
                  .                        GeorgiaPbwer Mf b                           sowen assamanosi sewmeest 0

Q , VOGTLE ELECTRIC GENERATING PLANT ObY UNIT C0fG40N 1 OF g3 EOP STEP DOCUMENTATION FORM EOP # lW-l REv 0 ERG # E-O aEv i EOP WRITER M/4 DATE 6[/f/fJ' SECTION I: ERG STEP e Yertfy AFW Peeps Ronning: (( a. MD pumps - RUNNING o. Manually stort pumps.

b. Turbine driven pump - RUNNING IF b. Manually open steam supply volves.

l NECESSARY

                                                                                                           ~~

O O

                                                                                              ~

[3

~ GeorgiaPower ~E;'g_c l 7N h Wj m ee emo oemmerr _, 0 VOGTLE ELECTRIC GENERATING Pt. ANT

                                                                                  --2       2      -

0 -

                 */ e/ev.                         UNIT  COMMON                         g op 43     l 1

EOP STEP DOCUMENTATION FORM O ERG # [-- O REV / EOP # /70 0" V REV . EOP WRITER d /& DATE 6//f'/fP Ec4 SECTION I.Tt BRG STEP Verify AFW Pumps Running:

a. Manually start pumps,
a. MD pumps - RUNNING.
b. SG blowdown isolated:

e SG blowdown isolation valves - SHUT. O e SG sempte isolation valves - SHUT.

c. Turbine-driven pump - c. Manually open TDAFW pump steam supply valve RUNNING IF ANY OF THE HV-5106.

FOLLOWING CONDITIONS EXISTS: e LO-LO LEVEL IN TWO OR MORE SGs. l l e BLACKOUT. t O r ff "3'3'

                                                                                     ~ ~ - ' ~
 '-     """                                   GeorolaPower                              11894-C O

g ,yT powen aamroe osamew " 0 VOGTLE ELECTRIC GENERATING PLANT

                                                                                     --2 O           eve
  • UNIT __ COM40N a op EOP STEP DOCUMENTATION FORM l

l O ERG # P O REV / EOP # /9 o <J 0 -I REV _

      .          EOP WRITER' k/ /O                                       DATE      kI/      J' Tw'S Ti F I C AT / c N SECTION IJ7I NP S$nrk             r  c2 y v \r e ru e s b       her ku r b i n e d<,e~              p_gvec                    e    <~ c lo Jed.

cl - ~ m ~, d s m _,I, ,sc/tf,e~ sc Llc V'Iver re c. . < v e cl sLA s)n,sIe a l o ."

                    ** ' * " ( C"79                            P~+        "*"<'"       ""t"'

O ,de~4.4'.ca+,a~ w~s i elvm ed-cl e. ,- + a ; o o P e rd ec aa 4 t, , c e~ r et i c( l l I l O 1 >5 703707 f

GeorgiaPbwer

                                                                                                                .T,L

,' f- news easwen osaammer

            ,,                          VOGTLE ELECTRIC GENERATING PLANT                                            0 0              4/<s/e <.                                uN,1   en,,,n, 1 c, t ,

EOP STEP DOCUMENTATION FORM ERG # E-O REV l EOP # lD-l REV D EOP WRITER N/d DATE _ d[/7/ff SECTION I: ERG STEP l 14 Verify Centeinawat $ prey Not Rgired:

a. Containment pressure - HAS a. Perform the following:

REMAINED LESS THAN m PSIG

1) Verify containment spray initiated.

jf g, THEN manually initiate.

2) Verify containment isolation Phase B valves closed. H El "

DfB manually close volves.

3) Step oil RCPs.

( O

                        ~

T

                                                                                                               ~~
              ~
         ~

GeorgiaPbwer ll894-C Q .f . g VOGTLE ELECTRIC GENERATING PLANT O Y/d/0Y UNIT COMMON [OFk EOP STEP DOCUMENTATION FORM ERG # E-o aEv / EOP # / fo o a M REV O EOP WRITER N [d DATE d kI Ec+ SECTION ID BRG STEP _

15. Check Containment Spray -

NOT REQUIRED:

a. Containment pressure - a. Perform the following: ~

HAS REMAINED LESS THAN 22 PSIG BY PRESSURE 1) Verify containment RECORDING. spray initiated. IF NOT, THEN manually actuate. O

2) verify contei-ent spray pumps running.
3) Verify containment spray additive flowrate of approximately 40 gpm per operating CS pump.

i l i 77

                                                                                  ~~

GeorgiaPower

        ".[' %

ll894-C 70- , *

                  '                                                                     0 f                               VOGTLE ELECTRIC GENERATING PLANT
                 ! /N                           UNIT  CO M N                           X OF EOP STEP DOCUMENTATION FORM O
                          &-O             REV    /     EOP #    / 9 o <J o - /     REV ERG #

EOP HRITER - h/O DATE _ 6//f'/g-f i Is'STsFiCAT/cN SECTION IJTt M P

                                                                               " ' ~ ~
  • 8 e(e r e ~ c e 'i o Cow t

d e / e 1 e s '.

                  ,,,y,,- Ps m,e 2-,

ygce cl e g , p n clces n' c Y~  !"'N

  • Phrcse B "" b '~ ^ "Y '*"/'+'$^' b s , 7 y a. ,/. L' c cr'EY"ws e ht ~yed Q "' " P c h ec Ic c' ~S'TI'"

c! e [, w. b o w s.

                      <sr<ders           9 va d el e s le + e . ,7 c P         rena . . -

jQ c p srup we.s Phase R ~ <- s cl e I ci e c!

                    ,a sec s ,c e h e c. c .-s e 9 ( e. 4 s p e c S. c .we+%.dy              .k      i e. fy sup cr      ,~<tJvd c e n h . ~ . c .s i sp a y                         ALL U Mt ts5fahd BcP cooi&     tader is sypl&A      Accia s skr.

9 a c- 17hsc S cmtemed so . Sc$ntf O KK PC3tC1

V

                                                                                      ~ ~'~
   ~"

Georoia O Power ll894-C g .f gs n.. -., *** 0 VOGTLE ELECTRIC GENERATING PLANT un O 4/,o/ey UNIT COMMON 1 OF 1 EOP STEP DOCUMENTATION FORM O ERG # 4 -O REV / EOP # /9000-/ REV EOP WRITER ///A DAIE b[/f[fI SECTION I: ERG STEP corrcSpem im

                                   ,g / o r= R G          S+ep o                                                                                                                    -

SECTION II: EOP STEP

         / 4
                                                                /{

X Verify Diesel Generators - .JJr "anually start both DGs. RUNNING. SECTION III: JUSTIFICATION VFce d. re / 7e~ee d , cs 5 a b d -f ~gcc 4cw, / [ir ucs s4c rT c .. c. ' le d e c/ ,~ osc v,c s  : -4 c p s _ 4 A c c e d'e r e vor i~c l w ar i~c Iv]s el l1eec.DrereI s4ac+ o1 Q ousvce ee(,c b te s A C pc ee Meeecsc.cv h 3.r 3, s s v r ~c e t o e m e r y a .- e y b v s .r e s dveou3

GeorgiaPbwer . 7,L N Y- m essunem osm' mort m. VOGTLE ELECTMC GENERATING PLANT 0 O , Qs/e* UNIT ENW 1 OFrTT EOP STEP DOCUMENTATION FORM ERG # E-O REV l EOP # lD-l REV O EOP WRITER N/& oATm 6[/yB f SECTION I: ERG STEP n Check if RCPs SheeW Be Stepped:

a. 51 pumps - AT LEAST ONE RUNNING a. Go to Step 22.
  • Charging /51
                                                 -OR-
  • High head 51
b. RCP Trip Parameter - LESS THAN //21 b. Go to Step 22. --

Q [uJ) FOR ADVERSE CONTAINMENT]

c. Stop all RCPs O

90 f03101

      ,. I "g..jf .h ll894-C
  ,         ,                         V0GTLE ELECTRIC GENERATING Pt. ANT              j                             0" UNIT       CNN                                               g oph O               -

1 EOP STEP DOCUMENTATION FORM 1 ERG # O REV / EOP # /9C)d0-/ REV _ O EOP WRITER h/b DATE_ 6[/[([ [ Ec? SECTION ID ERG STEP

              ,,,27. Check If RCPs Should Be Stopped:                                                                                g
a. ECCS pumps - AT LEAST
a. Go to Step Z.L&.

ONE RUNNING: o' CCPs or SI pumps gd ,

b. RCP Trip Parameter -
b. Go to Step 3.Adf RCS PRESSURE LESS THAN O mr .
c. Stop all RCPs.
d. Start one ACCW pump. .

l l l O W

                            -                            _ _ - ,      -    , _ _ . _ ,           _x- - - - ---
                                                                                                                                                                 *anamme.a
                 .' Nf b Mhb 11894-C
                                                                                                                                                                                     ~

0 V0GTLE ELSCTRIC GENERATING W ~

                                                                                                                                                                 ~~

O */:*/e + mim t o, y, EOP STEP DOCUMENTATION FORM O pgy [ ggy y &O o e _j ggv e EnG 0 DATE d kd/J J~ EOF WRITER D'S M F l c A t-/ c N SECTION IIJi M P h, ,g, YEG(* des ty ,v c e y t. , c e 5 s u p p e rT M tc o pv_g to of si l e s st e s e  % ., oper d ra.a. /F see1,opa ,s ,,

                                                                                                                                                                    ,g 12c P                                                                                                                                         r u a m mg, co d / a v e                                                           m     8cc0          i3 ' ~ e maci he L>

s io p p ce <d e AC6 P v M- Q MfAu 8 C_ P <3 6 p cc , el e 1 Ae r U-r~ s i s -l e / I la e con,~,mg

                                                                                                                   ,s J    fo     sv       e p o rt R C
  • ha r r ie c cca liny
                                                                                                               =
                                                                                                                 /adee           t,me.                                                             l O pe r c                                                     fc~             ds                                                                                          l l

I O 72

    ""*: b klf cars GeorgiaPower wn osmonarca espamwtwr VOGTLE ELECTRIC GENERATING PLANT
                                                                                       ~fy;';;_c 0

().  ! [N UNIT COMMON 1 op 1 EOP STEP DOCUMENTATION FORM ERG # [ - 0 REV / EOP # [ fd o 6 -/ REV D EOP WRITER A/ /$ DATE ((/f[8 J' SECTION I: ERG STEP Check If SG Tehes Are Net Ruytwed: Go to E 3, STEAM GENERATOR TUBE

 .       23 RUPTURE, Step 1.
  • Condenser air ejector radiation -

NORMAL

  • SG blowdown radiation - NORMAL
                                           ~

O SECTION II: EOP STEP

24. Check If SGs Tubes Are 24.

Intact: Go to 19030-1, E-3 STEAM GENERATOR TUBE RUPTURE.

a. Main steamline radiation - NORMAL.
b. Condenser air ejector radiation - NORMAL.
c. SG blowdown radiation -

NORMAL. SECTION III: JUSTIFICATION V EG E ba SI@ A MII#C c c J , c4 , e .- - o ~ , b s . 7% s e .-ece <~ cl'Jed as c c Leek for kde r-obre.

          \f 6 G.P    GoP            , efe ,.i !, [i c a. li a ~         w c~   1    cu ls e O           i~c   /u cla d'        l og i-         w a.      c h a ~ :. '

ea r r au o p e rw% c - Id . fY

        ~.                               GeorgiaPbwer                                                     .

11894-C 70 .[ .h . . . -

        ,,                   VOGTLE ELECTRIC GENERATING PLANT                                                           0 O           e,/OY                                                      CNN UNIT 10F Q EOP STEP DOCUMENTATION FORM ERG #  E-O                  REV      l                    EOP #             lD-l                 REV          D EOP WRITER              /O                                                  DATE    M//!8I SECTION I:    ERG STEP                                                                             ,

30 Check Aemillery 8vilding Redistion - Evoluote cause of abnormal conditions. !! NORMAL the cause is a loss of RCS inventory outside containment, THEN go to ECA-1.2, LOCfouTSIDE CONTAINMENT,' Step 1. O - 1 l l O l

                                                      . _ _ - - - _ _   -   - _ . _ . .      -    _ _ , ,          __       ~_ _ , _ , _ _ _ _

y WhW ja0 -, MAih

                                                                                                                                                                 ~"

J --- I V0GTLE ELECTmc GENMATING PLANT 0 l

                    -ema O                       b/M                                                              UNif                               ctDeens for
                        .        ?                                 :.   -

a.: n' EOP STEP DOCUMENTATION FORM ERG e E -o REv / EOP e /Po o 0-/ REv - 0 EOP WRITER h/A DATE __ b Gc+ SECTION IIt BM STEP 30

                     .ET. Check Auxiliary Building                                                                             29. Evaluate cause of abnormal Leak Detection Systems:                                                                                  conditions,
a. Check auxiliary building IF cause is loss of RCS and plant vent radiation tiiventory, monit' ors NORMAL: THEN go to 191~12-1, ECA-1.2 LOCA OUTSIDE CONTAINMENT.

e Selective cubicle monitors: O . ae-co24A e RE-0024B e Plant vent monitors: e RE-12442A e RE-12442B e RE-12442C

b. Check auxiliary building break detection system on PCP - NO HIGH LEVEL STATUS LIGHT LIT.

r

                                  . mpg-:

i O W

        - - - -                   ,--.---.-.------.---,w--,,,--n-                 - - . - -   . - - - - - - _ - - . - . , . , - .          , - _ . . - - , - -      ,.,--,,,---.-,.,~-----,-----e,--,

r

       ~.

GeorgiaPbwer 7p_c MY M = = es ennomoe w uer  %,

   ,         ,               V0GTLE ELECTRIC GENERATING PLANT                   o O/*                                   ""  """ "
                                                                                    ' #3 O

EOP STEP DOCUMENTATION FORM ERG # -O REV / EOP # /7000-/ REV O EOP WRITER - M//9 DATE 5!/I[I I Tw' S 7", /O f C AT / c N SECTION IJJ.* BetegesP

                                ~/<r .3 7 e p           w o. ;-  o. h c. uy e db
           .s4ee^u              So a          Ika , s + , r, e a , a ~ c ~ F e> P s4ep       fk?            , e      }, e +f e c a~ clec s } c. a di~5 d&1
            /n e i% ./ c 4 </. Je. .'~ ;~fu)/g Z(39hi~, 6 a A s,4
            +he ec.~4~,~ ~.at .~e<< , ~ e Ia da d c s      .
                ~    e peca 4.>c                ~ s4.         VFGP GoP O             i cle ~ 1', -f, c a + , r ~ ~ e c e ~I,
                                                                        ,. e h c/e e/.

O 74

e. 4
       -                                                                                                                                                             ~~

GeorgiaPower NY b ,onen eessunon as=mmer

       ,                       VOGTLE ELECTRIC GENERATING PLANT                                                                                                          0 4//8/04                                       UNIT    CO M N 2-1 op g EOP STEP DOCUMENTATION FORM ERG #   E-O                    REV      l            EOP #            lD-l                                                                               REV    O EOP WRITER           h/d                                              DATE                                                              b /8/f f SECTION I:      ERG STEP 29        Check 5,cendary Radietion - NORMAL                        Go to E-3, STEAM GENERATOR TUBE

[ Enter plant specific means] RUPTURE, Step 1. SECTION II: EOP STEP 11

           #2. Check Secondary Radiation -                              32. Go to 19030-1, E-3 STEAM NORMAL:

GE::ERATOR TUBE RUPTURE. e Direct chemistry to take periodic activity samples of all SGs. s SECTION III: JUSTIFICATION D i5 5 r e <p - c- 3 C b c .r } Q d h n -+ e . ? S .  ? \/ f C l' &'d f f- c). This s/ep e c9 v, e e e i / e c , w .~ , - e J ef Ic b /e - c/c,_ ~ c c/ Q sea n o le veI.es. To e no~ 4 k se v alve r i+ is N e c c e ss a ,-y *Io vegc+ s z s p n c. / c o u r i ~ v e c/ W101

                                   ~
          ~'                                                                 ~'~'~
    . . .                               GeorgiaPower                             ll894-C
  ,        7// -[ M                    w-
  • r
                            -  VOGTLE ELECTRIC GENERATING PLANT                     0 4/;3/S <4
                                                                             '"8 *::2. 2 Q                                              UNIT   COMMON                        4 OF f EOP STEP DOCUMENTATION FORM ERG #      -O            pgy   /       gap , /7o o 0 -f       ggy       y EOP WRITER        h/d                           DATE / 1A         f

{ ( fN W f sx ,, a ,, c.,.+ ,- aa  ; 7 here Eoce -f b ,a proceduce %+ 3 -[ q g 3,4, be p l e. c e d s +er s T'a P 31-s f .e e ~ - r r his /s c oc r *r'") I et r e 7 ve r e s Y A e ok s T eps l os31, 3)., s l l l O l 15 l l

     "T                                                      Georgiafbwer N f-                                        m eemmnon neanmeer
               ,,                                    VOGTLE ELECTRIC GENERATING PLANT                 0
                   !# !OY                                                  UNIT  CNN 1 or y EOP STEP DOCUMENTATION FORM ERG #   E-O                               REV          l     _

EOP # lD-l REV O EOP WRITER h/O DATE b d8f SECTION I: ERG' STEP 33 beset Centenamet Isaisties Phase A And Phase B O O ff

         ?- ?                                      y          Wfktf                                               M t llSSM-v r

g.f.%. ,

             ,                                        VOGTLE ELECTRIC GENERATING Pt. ANT                                    o UNIT. CNN                                              fork
~
                                ~~

EOP STEP DOCUMENTATION FORM . O ERG # E-O REV / EOP 4 /Fc) d 0 -/ REV EOP WRITER DATE _

                                                                                                         /                 ff E&

SECTION II? BR6 STEP 3V . R. Reset Containment Isclation Phase A: ,

a. Check containment area a. Go to Step )$.

radiation monitors - LESS THAN 3 R/H: e RE-0005A l e RE-0005B ,

 ,]'                     e e

RE-0006A RE-0006B

                                                                                                                                                ~
b. Reset containment isolation Phase A radiation monitors if necessary.
c. Reset containment isolation Phase A.

O O . e - ., _ - - .,, _ ._ - - - - ,

1

    ~                                                                                     ----

GeorgiaPbwer 11894-C b.{ , ,

  , ,                           VOGTLE ELECTRIC GENERATING Pt. ANT                             0 4l:8/8 +                                         N88                            **f Q                                                    UNIT                                      70F M.?

EOP STEP DOCUMENTATION FORM ERG # E-O REv / EOP # / IC c' 0 " / REV O EOP WRITER

  • k) l 8 DATE 6kMM L' S 7 , F i c A'r / c N SECTION IJJt M P T' h -e opaen for is i u s t' e v<.1 e el 4 =
         ' "  I ' S
  • P l a u + ecadiho~c by a j re, vi y d'a+<s~ +ka e ~~h,~-e~+.

r' l e v e. I s ,~

                                                      <- c J . c + , e .v     , ~
                                                                                     -t A 4 e c ~. 4 c. , ~ n. e4 J S     -t-k e c o      ,3      h,7      L cl c e f i c ~ &h n. 4 c -
                                                                                    !G '~ b      C R'Y
       -}- k , g     ,5     c:. w     i iv i

ck "s ~<+ ' s

                +n          cc~ 4m,; ~e e                              L O          ,~

el e m &, C, e J , 2 -r c cJ.<4.<~ le-I-ye-t- bee ~ r O* *E nu cl < c w4~ ic~,-lk., ,se~ ac,

                                                                   ~~      v      *h*           P e r d 'c s    i 9 ~ c~ l
      ~     ~s~supreces                                                     I' #         '"ST to     4 ' lC +

IT f~S T r u e. T- e d s re g t - sc d ceccv.ecy. O

      't
                                                                                                   /d/

m m. Georgia Power 7pg c c fu h

  • V0GTLE ELECTRIC GENERATIN3 PLANT 0 urn
                                                                                           ~~
           *l#s/M                                    UNIT CO M N 1 OF g)

EOP STEP DOCUMENTATION FORM ERG # C REV EOP $ d 2 0"/ REV O EOP WRITER A/ /A DATE _ /5 2 PJ' SECTION I: ERG STEP 2 I W Ru M SG(s): Continue with Steps 5 througn 12.

  • WHEN ruptured SG(s) ident.fied.

Unexpected increase in any SG narrow range level GEN do Steps 3 and 4

                                 -CR-H'gn raciation frem any SG samcie
                                 -O R-                                                                 .
                     * .Hig$ reciation from cny                                                      -

SG steam:ine

                                -OR-O
  • Hign recier:en &cm any SG blowcown line:

[ Enter atent scocine mecns] O l W l l l

            ~'

Georoia ~'~'a O Power

   .-          4 Wf anose.enano osame=r ll894-c m                       V0GTLE ELECTRIC GENERATING PLANT                           0
                 .f.j;9jy                                    COMON usan no UNIT gg op,gg'y EOP STEP DOCUMENTATION FORM ERG #     l.                REV      !     EOP 4    /9t3C'/        REV                           O EOP WRITER                [A                           DATE  6           8 J' Gc)

SECTION ID ERG STEP

2. Identify Ruptured SGs By 2. WHEN ruptured SGs identified, The Following Conditions: TREN do steps 3 and 4. .

e Unexpected rise in any SG narrow range level. Continue with Steps 5 through 12.

                                  -OR-e    High radiation from any                                                                          -

SG steamline. a O .

                                                                                                                   /41
      ~                                                                                                             ~~

GeorgiaPower 11894-C

 . .~

f /Qftltu . . - "

      ,,                                     V0GTLE ELECTRIC GENERATING PLANT                                            0
                                                                                                                    ==

4/ 8/84 "" 0 ' " ' " E or h

                                                          $0P STEP DOCUMENTATION FORM ERG #       8'3                                _ REV      l      EOP # _ /942 0-/ _ REV                          O EOP WRITER                                       k)/M                       DATE (,/ M lT(

Tw' 5 7~, F l c AT / c N SECTION IJ71 NP S a np/e a n J l) la - do~ ra J, c 4i s ~ c a u na ( i d e a 1. fp cv eine d .

s. c a e e. o c s, ~ g r' o VE C D d * " ? ~'-

O O

                                                                                                                              /M

Apenovat.

                                                                                       ~~~
   .                                        Georg.aPowcr                                  118 "-c is!.k<tdu                        . ...         . .. - ,

o.r. V0GTLE ELECTRIC GENERATING PLANT o UNIT COMON l OF gJ l 1 EOP STEP DOCUMENTATION FORM j ERG # b'3 REV f EOP # MO 30 -I Rrv EOP WRITER k} /b DATE b[2 ((W SECTION I: ERG STEP l 9 Roset Casteinasent lseisties Phase A And Phase 8 l O

   'C2 ' O n
                                                                                               //W    l
          ~'

GeorgiaPower ~ ' ' ~ la n-C 2 y Atdu . . . . . . . . , , , , , _ , , , 37, VOGTLE ELECTRIC GENERATING PLANT 0 4j' g' y *. *non e O a'(or e > EOP STEP DOCUMENTATION FORM ERG # d REV / EOp 4 hd 3 c'-/ REV O EOP WRITER b) /S DATE 6 2y/pf Sc? SECTION ID ErRG STEP

9. Reset Containment Isolation Phase A:
a. Check containment area o ~-

Ps .t. radiation monitors - *

                   ,       LESS THAN 3 R/HR:

e RE-0005A ' e RE-0005B e RE-0006A e RE-0006B b3 .

b. Reset containment isolation phase A radiation monitor if necessary
c. Reset containment isolation phase A.

$v

                     '                                                                 ~~-
              ~f Id      M/.,                     Georgia Power
                                               ,owenos,.euno oepa m e,n              -

ll894-C a ,re VOGTLE ELECTRIC GENERATING PLANT 0 osaa n 4/: S/

                         '6 y                            UNIT    COMMON                   P/ OF g3

('} EOP STEP DOCUMENTATION FORM ERG # g'-3 REV / EOP 4 /f d JdY REV O EOP WRITER' [d DATE d!.2 ((d'T ITw'n 7", F l c Av / e N SECTION IfJ h P

                                   \l E G ?          cl e s i y ,y      clo er we'f     6TC b

Phase G ,4 Lece bee <i

                                                                         ~ ' ' ' E
                    \l e c e d e s , y ~ c e ,                .,ce s    'La < e g e fh n, y o k r c:. d < % f a s w rw e n      dcrs E cese (

PhcTeA. . O o

             .u,,,                                                                               ,

m

    -    ~                                                              ~~

Georgia Power 8 " -c

 !         Wh                           _ , _ , , , , , _
          ,                     V0GTLE ELECTRIC GENERATING PLANT            0"
                                                                        ~

O * */* unit coa <ou 1 Or P EOP STEP DOCUMENTATION FORM ERG # REV / EOP # ((d 2d d REV O EOP WRITER kl f b DATE O PI SECTION I ERG STEP d C- Q r r 2 5 f a N Y!N) G (z G- N O TE SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment A. l 1 ( i PCJ ' 31

r-AMRC'% s i GeorgiaPower 11894-C bf b om

                                        ,,w . m VOGTLE ELECTRIC GENERATING Pt. ANT 0
             * '/ * *                                                          -    z-    2-O                                            unit   co - ,

Y OF ~1d7 EOP STEP DOCUMENTATION FORM ERG 0 l[~ 3 BEV f EOP 4 $6 ] o ~f REV O EOP WRITER b/A DATE h 9[PS~ E S 7~, F l C AT / c N SECTION IJ71 MP

  • S / G ru Cf c e z ,v o 4 o w q.k ) q
            "'"cc*              Pressae             Pc-ered [ce.w                 s
            /rAa             P <> - e e    s-    enl y. d A ~ ~ 7 , ~, -F / .              .

va.(ves a,c s a p p ly (caire[ r e 9 v,r. , su cc +ke,c c..p e r e&i o n. S e c ~ ws e i4 e s

                                  -Sc c Th 's e ec. e e d v cv +a oe p o ss i kle p / e ,m c> a f e c/      - Ykeut                ~ c-ir      c<.Qr+T ice im s Hec ~d.-etL.e                            d a v e , /c b le, a ~
                                                                      '5    ' * * *      ' f-c s -i a hI.sb,~3 c h a ry i~ 5                            's   '~c ,'        a, n, , m s ,.. ,, o e                     -   e. 4 x . - .

sv YfC. C kme re W h f O

       ,~,

lg){

uenom.

                                                                              ~~~

u Georg.aPbwer 11894-C b ~f b  %, ,,,ur,o , o.m.,,,

                                                                              * * * *       ~

are VCGTLE ELECTRIC GENERATING PLANT o 4/'3/84 UNIT COMMON 1 OF g 3 EOP STEP DOCUMENTATION FORM ERG # 3 REV EOP # l'kO7f -I REV O EOP WRITER k/ DATE d # l' SECTION I: ERG STEP 22 Estebiish CJ) GPM Charging Flew:

a. Cosa charging line flow control voive
b. Open cheging line hand -

control volve

                     ' c. Open cheqing line isolation volves
d. Estcelisn cJ1 GPM chcrging V flow using flow control volve O

d

GeorgiaPower ~g;';;_c 3 b f / git./Mur, powea oswaam osaanewr

           ,                      VOGTLE ELECTRIC GENERATING PLANT                          0 YbS,0Y                                                              paos s.o g                  /

G UNIT COMMON gg or g ) EOP STEP DOCUMENTATION FORM ERG # h3 REV / EOP # / D'l REV O EOP WRITER _ h/O DATE dd EI Ec? SECTION ID -EM STEP

22. Establish Charging Flow:
a. Open'CCP normal miniflow a. Go to Step 22c. -

isolation valves.

b. Shut CCP alternate miniflow valves.
c. Shut seal injection flow control valve HV-182.

n v

d. Open charging line isolation valves:

e HV-8105 e HV-8106

e. Shut BIT isolation valves.

t

     ?
                                                                                                 /#
       ~                                                                      % .e .

GeorgiaPower

 >      p p g,                       aownaoes.amano oemmm
                                                                              %m 11894-C care                  V0GTLE ELECTRIC GENERATING PLANT                       0 4bs/eS                                                            ****
  • 3 7 (D UNIT COMMON
                                                                                  # 0F EOP STEP DOCUMENTATION FORM ERG *' /'- 2__          REV       [        EOP # [7c)]ey         REV     .

O l EOP WRITER M /$ DATE _ [y g ,__ D S T, /e l c Av f e u SECTION IJ7t hp G b ct- Hy e kh hq

                                ' f  4 T a i r f ,r,._       ,,
                  *~ f spee < f x e.                 C~c, P   I f /a ~ ,  rs i i P ~ < < I le (       +v     e  k a c y ,9
                                                      /v de d         Ae~.               -
                                                                                           -i i s. Mis ~          - s-       ,~c                                               .
                                                               \

ive,-ne{v.,,~,f/w ( s c /c. -f a s irive.r dc? fe,Iere O , h!

           &                              GeorgiaPower
  '                                                                            ~{p;';;_c df b                       newen osmo oenumsw                    .                   ;

VOGTLE ELECTRIC GENERATING PLANT 0

             ,                                                                                     )

4/;3[U '^os w. 'z- I p v UNIT COMMON 1 op g l EOP STEP DOCUMENTATION FORM ERG # b~ REV [ EOP $ /fd 20 V REV _ O EOP WRITER d/ /M DATE _ b[b ((P T ~ SECTION I: ERG STEP O OorceSpaN

                                       '                               l 'V )

cRa N OT E k

                                                        's SECTION II:   EOP STEP NOTE Without instrument air available makeup to the VCT is not available.

SECTION III: JUSTIFICATION O q C o av 7~ / tv u [b n U

                                                                                          /B
       ,'-~"                                                                      ~~~

Georgia Power ll894-C

     ~

b f, powanosumano oanament

31. VOGTLE ELECTRIC GENERATING PLANT o p Y/*'S/S %
  • COMON L.)

UNIT XOF& EOP STEP DOCUMENTATION FORM ERG # -3 REV / EOP # [Md 30 -/ REV_ O EOP WaI"'ER A//d DATE 6/S/b r

                            'T s S 7~, f I c A m tc 14 SECTION ITJt N P
                               \/ c T        c e ~ 4 < < l vcu l v e c r eg v r c,
                                                                                       -y ,   ~.

1 " s T r a - .a 4 a , e Sa c +Lu.r a g e , dessya c(c e s n, { Se c a ve e VFCD e, ccm a c> w p r e s s c, e p c .~ e r e tivc/v de nir s u p p ly, e ~ d < Y s c /E Reec~er T 'S P f~ c c c2 Grq n {em oM jQ c T 5t hly h zw ec w+~v~i le b le A i w dh a Ng ,4 e co 4 +e M-

                                                         ,  -  c /  4 g,, ygg                      _m, V C T a ' /c ' 'P rA'Y
               .I ...h .e o p o r c~. f a r uat 6.e c- v e rk   Ue .

m~y O 703$ct HV

r

      '  ~"                                                                ~~

Georgia Power N 'Y W men anneuvou eenmens

         ,                    VOGTLE ELECTRIC GENERATING PLANT                 0 b            !                               UNIT    COMMON 1 OF/ Q EOP STEP DOCUMENTATION FORM ERG #       -h
                          -           REV    !        EOP # ((d 30 I       REV    O EOP WRITER       h/h                              DATE      O  II SECTION I:     ERG STEP O    C o r r e 5 y c ev d e su ERG            NOTE SECTION II:     EOP STEP NOTE Without instrument air letdown should be established using Attachment B.

SECTION III: JUSTIFICATION G@ /N G [uoft O m.., ,

                                                                                   //T i
             ~                                                                     ~~-
         ..                              Georgia Power                               11894-C "KI f M                   ,,a m        -                           _
             ,                 VOGTLE ELECTRIC GENERATING PLANT                         o 4/;!/g S                                                          *aos
  • casans O uNir q e 0,fg.a EOP STEP DOCUMENTATION FORM ERG # h REV [ EOP 4 /7d3c -/ ggy C EOP WRITER h/d DATE 6/ 9Y[F T Te n 7", F l c AT / c ev SECTION IJJJ M P
                             \lEGP             cd e s ,7 ~ c/ c e :        ac t      ,  .e d Je
               ^'r     cc- Pressor                  pc - e c e d -{' c c . m m
               /E A0- Po- er s' pp l y, L e + d e n, -F/cs                                    '

c c ui c e [ v a. ( v e s r e 7 v,ce s ., c,c s a p p /y cc +he,c c .p e r ed r o n . S e c ~ us e i d t s. O e+ d u ce *= a= poEsiaf, 4^ = c Yh 's ere

                  ,n   pie     c, a 4 e d            .Ybcuf         . ~    c~ i r      ccr+fres ?ct am,       /c b le, a ~ s H e r n, a 4                       etL 4 4 cs-fs L l . s 6 , s,            le+ de m             /J    " " ' " " S ' " " I'       l
                                                                          '      '~"            *

(-f e , n, d e .v e. N k e ' j 9,,

                   , ~    g r/ c c h -e                 & e 1

1 O Io

f~

        ""*"                                                              ~~

GeorgiaPbwer 11894-C IV f M .., m VOGTLE ELECTRIC GENERATING PLANT 0" O ** usiT cos os

                                                                          ~

10,1 EOP STEP DOCUMENTATION FORM ERG # b~3 REV  ! EOP 4 / kd2 0 -/ REV O EOP WRITER h[M DATE_(o[d g 3" SECTION I: ERG STEP O C o r r e S g aos t er Egc stee O . SECTION II: EOP STEP CAUTION Without instrument air available CCP suction should remain aligned to the RWST. SECTION III: JUSTIFICATION D Y rw c. k,sp w t ,v o be nent lc.b(+_ i f , u s ] < u n e i / cn , e is w & a v c. i /a Ah . So o Tc: Ti fi ce77o w e f Na re~ h u da .- e s 4e o 2 &. i

      'w s t                                                                       ,

Georgia Power ""g;'; _c 6fb nowen oenenafoe osaamsar ,, ,, m -

        ,                           VOGTLE ELECTRIC GENERATif4G PLANT                       0 0          */'*/*
  • u"'r co " "

t or t EOP STEP DOCUMENTATION FORM ERG # REV f EOP # lQ030-l REv o EOP WRITER A) /A _ DATE __ fM SECTION I: ERG STEP 38 Go Te Appropriate Post 5GTR Coeldews Methed:

  • Go to ES 3.1, POST-5GTR COOLDOWN USING BACXFILL, Step 1 -
                                         -OR-
  • Go to ES 3.2, POST 5GTR COOLDOWN USING BLOWOOWN, Siip 1 -

O -OR- -

  • Go to ES-3.3, POST SGTR COOLDOWN USING STEAM DUMP, Stoo 1 SECTnJ II E09 5HP 38. Go To Appropriate Post,-SGTR Cooldown Method:

e Go to 19031-1, ES-3.1 POST-SGTR C00LDOWN USING BACKFILL.

                                                                 -OR-e     Go to 19033-1, ES-3.3 POST-SGTR C00LDOWN L' SING STEAM DUMP.

SECTION III: JUSTIFICATION

              \l f c e 6 I c - cl ~ ~                  d e s i n .v cl e     s   u +pa<~.+
             -f h e o r e c e s s i             ic,   e f l N e ci e <c n e v ,v Y S oh                ,

e e A - , ~ cA ef ~ ~ +e c. M e v e r , e s - 3. 2. ~ ~ s  ! O geI,4,s yycp ycp , ci , s . f, , , s , -

              ~~s        ,~ c /vde s.

TC3'a t

                                                                                                 //
     '  ~"                                                                  -~

Georgia Power '*" " k i k&M -...... ~ ***

        ,                      VOGTLE ELECTRIC GENERATING PLANT                   0                !
                                                                            ~'"

O- #^ 8/*

  • uNir cossou 1 Or e a EOP STEP DOCUMENTATION FORM ERG #
                           ~

REV [ EOP # [kd2C#-/ REV O EOP WRITER h[b DATE,_ b! J l SECTION I: ERG STEP o c. o r e e S p c wt iN [kh h 4 C k*Gd m SECTION II: EOP STEP f\ # 1 { -e Q R \ \ r c. nmed \ j gr c c @ SECTION III: JUSTIFICATION re c fu e is I,e. c, f v la c .~g f2.s i~Ac- s,c- i~ .N epay a9 Y UT LT h e fe ca S+eo 2, Scc T U 3 T / F~t C 4 7~/0 tJ j O 1

       ,n.2,

l I pnocEQURE NO. REVISION PAGE No. Q 19030-1 K M of Sheet 1 of 1 ATTACHMENT B ESTABLISH SAFETY GRADE LETDOWN

1. Open Reactor Vessel Head Vent isolation valves:

e HV-8095A e HV-8096A e HV-8095B e HV-8096B

2. Open Reactor Vessel Head Vent flow control valves to obtain desired letdown flow:

e HV-442A e HV-442B END OF ATTACHMENT B O

                                                                                                                                                                         /$b
  ~                                                                                      -

Georgia Power Nh & m ae emnou emmen 0

  ,                           VOGTLE ELECTRIC GENERATING PLANT
             'k N                                 UNIT  COMMON                                1 0F 1 EOP STEP DOCUMENTATION FORM ERG #      [C M c . O REV                  /    EOP $    /k/d0-/               REV      O EOP WRITER          h [b                                   DATE    6/'?Y            3" SECTION I:         ERG STEP 1          Verify Reester Trip                         Manually trip reactor.
  • Rod bottom lights - 1.lT
  • Reactor trip and bypass brookers - OPEN '
                                                                                                                 ~
  • Rod position indicators -

AT ZERO

  • Neutron flux - DECREASING O .

SECTION II: EOP STEP

1. Verify Reactor Trip: 1. Manually trip reactor.

e Reactor trip and bypass breakers - OPEN. o Neutron flux - LOWERING. SECTION III: USTIFICATION i c pec, A ,e s u C / c cc.I/c ev Q. 4 b a le.' M , e,e e < c ues tec - + Ae y are oasecect Cro- (4 e s c c es. C h .s n f x, i c e . ~ n, / o c, y are +o improve o p e c ute r O -~~ ~,c3,m~r

 '03'31
     ~                                                                                           ~~

GeorgiaPbwer ll894-C 70 ./ Q ,

     ,,                         VOGTLE ELECTRIC GENERATING PLANT                                       0"
                !0Y                                   UNIT  comenN 1 OF 1 l

EOP STEP DOCUMENTATION FORM j l ERG , ECA-0.C aEy i EO, , 191co-; rey o l

                                                                                             -                                           i EOP WRITER // /M*

DATE

  • b
                                                                                        /

Y[I/ l SECTION I: ERG STEP ' 1 i 7 Dispetch Personnel To Lessily Restore AC Power Using (Enter plant specific precedure number and tittel .

7. Check AC Emergency Busses Status:
a. At least one AC a. Dispatch operator to emergency bus - locally restore AC ENERGIZED. emergency busses.

WHEN one AC emergency bus is energized, THEN go to Step 24.  ! Continue with Step 8.

b. Go to Step 24.

SECTION III: JUSTIFICATION ea <-m, ee 1ed 4 a c ~ V ,-- e Acae-e, ces+,.m ,: ~ e fre c +  ;

          +hcom Jc.+                 +h i s        areceduc~. R N D                          -r,      b e c, , ,

nv a /<= d t i r e- s 4 c c- m f , = ~ D r o e a c/ m ee eS N+ e ~ c tw e nersiA/e + m. e. l F33101

                                                                                                   /27

r Georgia Pbwer 11894-C l N y.Q _,

             ..                             V0GTLE ELECTRIC GENERATING PLANT                       " o"
                 +/'8/e 4                                       COMMON 2

UNIT 10F Y t EOP STEP DOCUMENTATION FORM ERc . ECA-C.C Rzv I EaP . 19tcc-; azy e EOP WRITER hl/fh DATE 6MMM SECTION I ERG STEP 12 Cheek if SG Tebes Are Net Reptered: Try to identify ruptured SG(s). Continue

  • Condenser air ejector radiation - with Step 13. WHEN ruptured SG(s) goggat identified, Efg isolate ruptured SG(sh
  • SG blowdown radiation - NORMAL .* .lsolete AFW flow. .
                          * (Enter plant specific means]
  • Close stoom supply valve to turbine-driven AFW pump.
                                                                         * "<a so pressure res >aoa o , asi.

O THEN verify SG PORV closed. F.,g, . THEN tenucily close. O O3

  - -                                                                   ~Ei'n_C GeorgiaPower wm                         _ . - -

V0GTLE ELECTRIC GENERATING PLANT 0

    =                                                                   .... .

C' +/e/e+ unit co *n" toret EOP STEP DOCUMENTATION FORM EOp 4 /f/Oo-/ REV O ERG $ [C./4-0.0 REV [ I EOP WRITER M DATE Ge? SECTION ID ERG STEP

12. Checkl T SG Tubes are 12. Try to identify ruptured SGs.

Intact e Main steamline radiation WHEN ruptured SGs identified, ' monitors - NORMAL. THEN isolate ruptured SGs: e Isolate-AFW flow by . shutting the following

  • throttle valves as necessary:

e Condenser air ejector e HV-5122 (SG 1) radiation - NORMAL. e HV-5139 (SG 1) e HV-5125 (SG 2) e HV-5132 (SG 2) e HV-5127 (SG 3) ' e HV-5134 (SG 3) e . e SG sample radiation - e HV-5120 (SG 4) NORMAL. e HV-5137 (SG 4) e Shut TDAFW steam supply valve from affected SG: e SG blowdown . radiation - NORMAL. e HV-3009 (SG1)

                                                                  -OR-e  HV-3019 (SG2) e  WHEN SG pressure is less than 1135 psig, THEN verify SG ARV shut.

O 1F SG ARv Nor shue, THEN manualT9 shut. Continue with Step 13. j wr l

t AM40VA4  % . .. , Georgia Power ll894-C 3p g malosaamanon os,.m., U =a VOGTLE ELECTRIC GENERATIN3 PLANT 0  ; cars 4/. i '- 3 cossoy s, l uN,7 s-OFh O

                                             'EOP STEP DOCUMENTATION FORM Erh n G C A ~ o. o             ggy    j         c0P 4 / 9 / o ,.y _ /

33y o f/ / EOP WRITER ff /M DATE V" Jff fM I S S T"i G I c av j e y SECTION IJ71 % p P la ~ + s e c , n c ~ q u J, ,+ , w j,,, Se SG -k he re9 4 vc e w~s ieinclv 4,,~ de el , m, q, i% ~ f s p a e , p, e 9, w ,, c lu f e d. A n y e hanyes iw c.v ece in tm p r[v e op d der 4 e r m, ~ le 7 7 are h cc~~w~ , e c~ % < e u r, O .' s O

                                                                                             /ff                .
     ~                                                                                                                                      ~~

GeorgiaPower 11894-c

      $ .f Q                                       ,
     .n                          V0GTLE ELECTRIC GENERATING PLANT                                                                                               0"
             # !0Y                               UNIT                    cn M N                                                                                 1 OF 1
                         . - _      -y EOP STEP DOCUMENTATION FORM ERG ,     ECA-0.c             aEy     i                        EOP ,      19 co-;                                               aEy                    a ECP WRITER               A/ /A                                             DATE                 h.2 f/Ff SECTION I:        ERG STEP 15           Check QT Level - GREATER THAN (6)                          Switch to attemote AFW water supply. JF alternate supply NOT available, THEN:
                   .                        ..                             .    (Eriter. plant specihc means].                                                                       ,

O SECTION II: EOP STEP

15. Check CST Level - GREATER 15. Switch to alternate CST.

THAN (15)%. SECTION III: JUSTIFICATION Y $ 6 ? <- 5 / 9 a hRf 5oecad DSi a_ s A ~ c be r .v Ye

O ll24

r

       ~

Georpia Power ~~ 4 - o 11894-C df- ' e om.amno osu m mar *

       .                            VOGTLE ELECTRIC GENERATING PLANT                                 0
                                                                                              ~

O +/< 8/e

  • unit co,.40s 1 Or 1 P
                           *w ene '

EOP STEP DOCUMENTATION FORM ERG # ECA-0.c azy i EOP , 191cc-l Rzy c EOP WRITER hM DATE d /c7 f/ J' SECTION I: ERG STEP 21 Cheek Centeinment Pressere - NAS Perform the following: REMAINED LISS THAN //// P51G a. Verify containment spray signal actuated. JF g, THEN manually ) actJote.

b. Vwrify containment isolation Phase B voives closed. g g.' THEN monucily .
  • close valves. E volves con NOT be ?

manually closed, THEN locally close volves. {;

c. Reset containment spray signol. l SECTION II: EOP STEP
21. Check Containment Pressure- 21. Perform the following:

HAS REMAINED LESS THAN 22 PSIG. a. Verify containment spray I '

 .                                                                         signal actuated.

i i IF containment spray signal R5T actuated, TFfN manually actuate.

b. Reset. containment spray signal.

SECTION III: JUSTIFICATION IG S pec 'C V(* ! MGr m ece i ~ c t A s. DLmre am 3 d m /e h s Sr e ~ vscP d v s i;, n. O

                                                                                                      /$7
 ~~""

GeorgiaPower Tg_c W f k&hu. - . - - ,,,w,,,,. a.re VOGTLE ELECTRIC GENERATING PLANT 0

       #8/eS                              unit    cnMuos t Or x EOP STEP DOCUMENTATION FORM ERG ,  ECA-0.0             Rzy    i        EOP , 19100-l                 REv _ o EOP WRITER        kfb                              DATE _ b               I ff l

I SECTION I: ERG STEP 23 Cheek if AC En::;:cy Power is Restored:

a. Check oc emwgency busses - AT o. Continue to control RCS conditions l LEAST ONE ENERGlZED and monitor plant status: .
1) Check status of local actions:
  • AC poww restoration.
  • RCP seal isolation.
  • DC power supply.
) Check status of auxiliary boration systems:
  • BIT temperature greater than fl3)* F.
  • BAT temperature greater than fl3)* F.
                                                                 ] either temperature less than setpoint, THEN dispatch personnel to reduce baron concentration (Enter plant specific means).

Check status of spent fuel cooling:

  • Spent fuel pit level greater than ild).

{ favel less than //41, THEN dispatch personnel to initiate mcKeuo to the spent fuel piti (Enter plant specific means).

1) Return to Sten 15.
                                                                                           /

v., _ _

                                                                               ~ ~.-

P" GeorgiaPbwer 11894-C e .) v f b  %, * * * ' 0 VOGTLE ELECTRIC GENERATING PLANT are ...., O +/ eje+ UNIT COMMON RYOF sy%) EOP STEP DOCUMENTATION FORM ERG # [CM ' O , O REV / EOP , [9/00-) ggy o EOP WRITER d/ /d DATE d 7 ?[ Ec? SECTION I.D BR6 STEP

23. Check If AC Emergency Power Is Restored:
a. Continue to control RCS
a. Check AC emergency conditions and monitor -

busses - AT LEAST ONE plant status: ENERGIZED.

1) Check status of lo' cal actions:

e ^c Power re= tar cio=- O e RCP seal isolation. e DC power supply.

2) Check auxiliarystatus of boration systethi e BAST temperature greater than 78'F.

IF temperature less E an setpoint, THEN dispatch personnel to reduce boron concentration.

3) Check status of spent fuel cooling:

o Spent fuel pool low level annunciator - NOT ACTUATED. IF actuated, bJ TffEN dispatch personnel to initiate makeup to the spent fuel pool.

4) Return to Step 11. ^

n,2, ll2Y

        ~"                                                                          ~ ~ '
  • Georgia Power " 8 " -c
        '.N.F k h
      , ,                            V0GTLE ELECTRIC GENERATINO PLANT                       0 4l. i ' ? 4                                UNIT   COMMON                  ' " '3    3,
                                                                                         -- - 0F t-J

(]-

                         ---             EOP STEP DOCUMENTATION FORM ERG '            A - U-           REV    /        EOP , /7/o o - /      33        g EOP WRITER              h//)                                        f           ,

YS' S 7~ , F 1 C AT / c ,v SECTION ITJ h p 5 5 e. -Q h q b Q(V N G S l} u D M m f-f e ~ p e rA ce e e. y . . r e - ats. n~ d kod of ko-9 -h s e a c ,0c b~ve s' e o .r + I= I p a ; / ~ , + w f A c. p e - e c iv ot b o e_ y Je...elopa.d, a3 4) c k ~ ~y e.d d Io e xe< r e% ~ % S4sp<< td o p e , mt e r ev u l v o. + , c w of e ("v"*"E  ! e c u a s t a u s. Plset.yg.<rfic wcr i ,s. e- (uded. I i ' l jf6 )

r

                                                                         ~

GeorgiaPower ypg_c 10 f W m.ae ua o me.r _, VOGTLE ELECTRIC GENERATING PLANT o om O 4/,8/e# uNir ca nu 1 0,p EOP STEP DOCUMENTATION FORM ERG # ECA-o,i nEv I EOe 19/01-1 Rzv 0 EOP WRITER ) /M DATE Y if SECTION I: ERG STEP 2 Cheek Camamusem Isaw Perform the followmg: Phase A . NOT ACTUAM a. Reser comommem isosation P%se A

no Phase 6.
b. Estantisn irmemem ::r m
rm2inmem.

O P03 ' 0 0 B/

l "5 ~~~ GeoreiaP6wer 11894-C

    ~...' A b rJ.-                               3' --                   -
                                                                                            ~O m onneum oenmeer                                                 -
   .Y ..         .                                                     V0GTLE ELECTRIC GENERATING PLANT                                                                o
                     #8/e+                                                                                 cossos
                                                                                                                                                             ~*            7         '
c. ~, ..: unit s.k or & l
                                 *:# .+                                    s s '
                               .Q. i-i  .m .:
                                                .                      p .,    .

EOP STEP DOCUMENTATION FORM Eac # E C 4 - o, / aEv / EOP * / 9/c /-/ aEv d EOP WRITER' d//[' DATE (( f [6~~

                           ~ '

gap . SF.CTIOtt IU ERG STEP .

2. Perform the following:
2. Check' Containment Phase A -

NOT ACTUATED,

a. Reset containment isolation Phase A.
b. Establish instrument air
                                      .                                              ..                    ..                   to containgen't:                                   ,

_I,f instrument air pressure normal, THEN open containment Os isolation valve HV-9378 and go to Step 3. IF instrument air pressure IT5T normal, THEN perform the au u__y.._ ToTTowing:

1) Start one air
                                                                                    * " ~ -                                          compressor by                                   ;
                                                                                 .- . a . . ..                                        initiating
                                               -.                                      . ... . -                                      13710-1, SERVICE AIR SYSTEM,
r. ...;. '- ,. .m . . . ..+..

s l.

                     * ?. .                                                7
2) WHEN instrument air
                        ,~.,i 3

pressure is normal, 4 7 , THEN open containment . 1 solation valve HV-9378 and go to Step 3.

                                                                                                                                                             '       ~
                          ~ '

O __

o "a f l%td y s ma u,..um omme,a

                                                                                                                                 "'*C
   ,      ,                                                                    V0GTLE ELECTRIC GENERATINJ PLANT                   "o" 4/.3 / s                                                                               CCMMON a=
  • 2. 7 UNIT 4. oy y_j.

v EOP STEP DOCUMENTATION FORM ERc e F c 4 0./ REv / EOP * / 9/o/ aEv C EOP WRITER h/A DATE _ [ E Id % Y o R I C Av / c N SECTION IfftBfMb4*EP

                                                                                                                                   ~

h)q y d s pq ci e C. & 9- # ' A. pLese G-as d e l * + '" d

                  , ,s c I v a
                .p ,.                                                 _   v r s- P     cd e s > 9 ~.

L> j f

          .a..,
                                                                                                                                     ,n$
                                                                                                                                             .b

I O

          ~

GeorniaPower ~~ c f W T. -

                                                                         ~o wwas soumse,r ll894-c y                                 V0GTLE ELECTRIC GENERATING Pt. ANT                                                            O' 4/ 8/B*                                                     UNIT   co mnN t op y EOP STEP DOCUMENTATION FORM ERG #        ECA -0. i                               REv      I      EOP * - I4 101-1                                  Rzv   o EOP WRITER                [/ /A                                                   DATE _                         b           7 SECTION I:              ERG STEP 3               Messeily Laed Feueweg th Os AC?-- ;ci Sees
c. Oeck instrument air - AVAILALLI a. Start one instrument air comoressor,
b. Oeck volve alignment and start CON pumos *
1) Geck volve alignment: 1) Manuely align volves as necessary.

[ Enter piant soecific list]

2) Start one CON puma
c. Oecx valve oiignment and start charging / SI cumo
1) Geek volve alignment 1) Manually align volves as
  • Gorging /SI pump suction volves necessary.1VCT or BAT g from VCT - OPEN ovcilcole, TWEN estcolisn suction
  • VCT momevo control system - ** N N' SET FOR AUTOMATIC CONTROL
  • Joen suction valv'es from RWST.

AND GREATER THAN RC5 BCRCN e ::ose suction valves from VCT, CONCINTRATION

  • Chargmg line isolation volve -

C:,0 SED -

                                       * (Enter cient soecific list]

21 Start one c.9ergmg/ Si cumo

d. Start contemment fan cociers as necessary
e. (Enter cient scectfic list]

O  ;

                    + =m ee seum , em    -

g-

r

             ~'                                                                 ~~~

GeorgiaPower ll894-C fG.[. Q , ,

             .                     V0GTLE ELECTRIC GENERATING PLANT                  o
  • Y n Y/'S/0 Y UNIT COMMON
                                                                                    < Or fNE-U EOP STEP DOCUMENTATION FORM ERG $ 8 C 4 -0./         REV  /       EOP 4   h/ d / -/      REV     O EOP WRITER        // /S                        DATE    <d/M/77 Go#

SECTION ID EHM STEP

3. Verify Valve Alignment and Manually Load The Following Equipment On The AC Emergency Bus:
a. Check NSCW System a. Align NSCW System for alignment and scart two normal operation by.

NSCW pumps. initiating 13150-1 NUCLEAR SERVICE COOLING WATER SYSTEM.

b. Check ACCW System b. Align ACCW System for (mv) alignment and start normal. operation by .

one ACCW pump. initiating 13716-1. AUXILIARY COMPONENT COOLING WATER SYSTEM. O c c urnwe o BT

r

    ".# F                                      GeorgiaPower                            11894-c
 . .: .~ Wkduk                                . .... _ ,

VOGTLE ELECTRIC GENERATING PLANT 0 m

 ]                   0/M       .                      UNIT  CO M N                       ]oph
                      ,        a:-

EOP STEP DOCUMENTATICN FORM ERG # [ d 4 ' O./ REV / E0P $ / k/d / '/ REV O EOP WRITER d//M DATE 4[4N9T Eo4 CO MO CAUTION SECTION ID EHHf STEP Without instrument air available CCP suction should remain aligned to RWST.

c. Check CVCS valve alignment and start one CCP:
1) Check valve alignment: 1) Manually align valves g as necessary.

V e CCP suction valves from VCT - OPEN: IF VCT NOT available, TREN establish suction e LV-ll2B from RWST: e LV-ll2C e Open CCP suction e VCT makeup control valves from RWST: system - SET FOR GREATER THAN RCS e LV-112D BORON e LV-112E CONCENTRATION AND AUTOMATIC e Shut CCP suction CONTROL. valves from VCT: o Charging line e LV-ll2B isolation valves - e LV-ll2C SHUT: e HV-8105 e HV-8106 e CCP normal miniflow isolation valves - OPEN. ) O , O 2) Start One CCP. )

d. Start containment fan PCJ ' 0 '

coolers as necessary. [ 1 I

amom .

                                                                                 ~ ~ . .

eorga Power uae<-c k ?,, W . ..... . - .., _ ur, V0GTLE ELECTRIC GENERATING PLANT 0

               !' 5/ S '                        UNIT CCMON                             op h U

EOP STEP DOCUMENTATION FORM ERG $ C N 'O l REV / ECP 4 /I/d/-/ REV d EOP WRITER [//A CATE _ d Yf 7% n T,4 i C AT/c N SECTION ITI* BMHe*EP P / e ~ + s p e e , fi e ~+^t,~~L i a e. / v ,[ a j vo lv e i el e ,v f C c uti;, wa s

             \/G G p el e, e ., u d k u v <e t e e c- p e-e r a d a a    t-  c o.- p rostor.          ~7~h e ca Y c r e - [ N c d (: ' r S u pply        V c T m m /c o -p         a  soYrol'YJU' ~                 

C A v'i~/ c W p/ inopeca gle, n .r m ~ /, e r+he q L , l b [C f , I i i t I m M1

GeoroiaPower ~ ~'a

                 -                                   O                             ll894-C Wf b 4

e ,en so.ena m osaan m e w

                                                                                ,, , ,'     l
            ,                      VOGTLE ELECTRIC GENERATING PLANT                   0     ;

( ';  !'/M UNIT COMON 1 oph EOP STEP DOCUMENTATION FORM ERG $ 6 C A-O,/ REV / EOP#[9/O/ -/ REV O EOP WRITER M DATE (($Y[T7 SECTION I ERG STEP o

                                        ,            C o f r e .5 p c YV   IN )

G~ 0z c pl a v E O SECTION II: EOP STEP NOTE Without instrument air available charging should be

 ,                      established using Attachment A.

SECTION III: JUSTIFICATION Ec' o f yv C fv e $. o O Bf

     & u.                                    Georgia Power
                                                                                  ~~

Il894-C

      .d T       M4                         ,,        .

we V0GTLE ELECTRIC GENERATING PLANT 0 tm 4lis la '~'e U UNIT COMMON EOP STEP DOCUMENTATION FORM ERG $ 6 C A - 0. / REV / EOP 4 ///d /-/ REV h EOP WRITER M DATE _ [N ff 5" 5 7"o I: I C AT I Q tu SECTION IJJ Mp g c Y , .v t. ./w

  • S / } ni C[ c e s t g
           " '"          C'"       Pres;cc               gc _ , , e 4 fr c, q
           /FA& Pe~+- sc ppl y, d A m c 7 , ~, -F /c d C 'd i r o [ V a ( v c s r ce c/ v .<- e s .u aic     s v a p /y ac +he,c c . p e r ~+ < w . Se e us e
                                                                                      ,4,,

o I ns +a be O possial, -S=c ece e e =l v c v

                                                         .ibcuY -         ~ cir        cer+yrE ?cr p i e . ., e a 4ed i . v.

av<, /c 6/e, 2 s Hecr,J, etL.e 4 is n e c

  • s s ~ r f-as4a k l.s b , ~3 e h a ry i~3 '^'" A ded
                                                                             's m H e r,o e .m e 4 k e         ..

T h. s v N T[ c_ e h ow e w b

                  /

O

    ,=,,,,
                                                                                             /W

c .... GeorgiaPower ~iral_c b~h b ma omesnae os=mesc . , , , , ,

      ,                         VOGTLE ELECTRIC GENERATING PLANT                   0 4/!8/B %

Q UNIT COMMON 1 OF EOP STEP DOCUMENTATION FORM ERG $ [ C 4 - U./ REV / EOP 4 [7/ O / ~/ REV O EOP WRITER  ! DATE f MY[fg-SECTION I: ERG STEP O C c r e e S p c ey N E qa G N oTe SECTION II: EOP STEP NOTE Without instrument established air available using Attachment C. letdown should be SECTION III: JUSTIFICATION ,,

                                     $ c' e S H c /O l G $

O FC3 ' Q t , Mb

r

                                                                                            ~ ' - -
       ,  f"                                    Georgia Power                                   8 " -C 70F.% 6                              - . - -
           ,                           V0GTLE ELECTRIC GENERATING PLANT                           o"

[' /3 Y

  • UNIT COMMON " ' _1 0F EOP STEP DOCUMENTATION FORM ERG $ IC A ~ #e l RIV / EOP 4 / P/ c> / -/ REv O EOP WRITER h/] DATE _ [/ Ydf 5' S Yo I: I C AT i c 14 SECTION IJ7 396-49EP
                                    '\f '- b D         CN e S / 7 fv
r. [ c p fu e T , .v sks q c<c cc- pressae p ..e ed [c c .m s
                <   r      A a e , - e .- x              y. i y.         L e. + s o -            -F /~

c c a -( c e { v ce (v c s r a rj v . c e < .a G'r sap 9fI

                 !cc +he,c c .p e w+t a v . S e c ~  l
  • 5 b o n.
                                                                                                     ,u            ,
                                                                       ,             .g     , ~ c-       -=a p, qN E

['t (- ,

                                                             -B   d-p -r/ c. e    k ,- e w &         C                                                 <

O l

                                                                                                       / /
        ""                                                                   ~~~

GeorgiaPower " ' " 'c

       .k i kddux                   - ,..,.. n .,
 ,;     on                   VOGTLE ELECTRIC GENERATING PLANT                    0

{} */

                                           . UNIT   CO MON                       1 opg p i

EOP STEP DOCUMENTATION FORM ERG # [C 4 ' O / REV / EOP # /7/0/~/ REV O EOP WRITER M/M DATE *U SECTION I: ERG STEP f 6 C a t re s p b y lN} rec- A%eL e ,4+ . O SECTION II: EOP STEP

                                    $ee At a-ckwea                            O
                                              /w,c_lvd# d SECTION III:     JUSTIFICATION        N <- (v    e      ^   lGw C o la e , ~ c,   +k.s      . Se c - e4 i a ~            <8  S'4e o Y                 l
           $ee do-rr                   h,e ('c c e         f+ep 4    '

Eac 3 V S Tt r~t c RTt a & O

                                                                                    /W

D PROCEDURE N,o. REVISION PAGE No. 19101-1 0 15 of 19

                            .-                                             Sheet 1 of 3

( ,

   'v                                             ATTACHMENT A ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized:
1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

i e HV-8105 e HV-8106 4; Verify BIT isolation valves - SHUT: e HV-8801A 6 e HV-8801B W e e HV-8803A HV-8803B l

5. Dispatch local operators to do the following:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO.
c. Shut 1208-U4-135 CVC3 SEALS FLOW CONTROL HV-181 OUTLET ISO.
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL: ,

e 1208-U4-414(RCP #1)

                               .e  1208-U4-415(RCP #2) e  1208-U4-416(RCP #3) e  1208-U4-417(RCP #4)
e. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

v 70344$ BB k

PROCEDURE NO. REVISION PAGE NO. 19101-1 0

    -                                                                                     16 of 19 1

Sheet 2 of 3 ' I ATTACHMENT A (Cont'd.) B. Establish Charg'ing With Train A Emergency Bus Energized:

1. Verify OPEN.

Train A alternate miniflow isolation valve HV-8508A -

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438 l
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.
d. Shut 1208-U4-134 CVCS SEAL'S FLOW CONTROL HV-181 INLET ISO.

e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO. J f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL: /

                                                                                                   }

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

O v mus

P.'.ocEDURE No. REVISloN PAGE No.

             -                     19101-1                      0                    17 of 19 ATTACHMENT A (Cont'd.)

C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

  ~
5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT e HV-8801'A e HV-8803A

(]} , b. Verify Train A charging isolation valve HV-8106 - SHUT I

c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO.
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO.
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO fl SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) I e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

END OF ATTACHMENT A 1 i 1 M5' \ a - __ _

a

          '"'                                                                        ~ ~ ~ ~

GeorgiaPower ll894-C

          .k/ f /Qft/pu                 ,,        . m, wm                     VOGTLE ELECTRIC GENERATING PLANT                               o 4l;8je q.                                                               *noe n O-                                                unir    co"Mo" 1 OF y.o EOP STEP DOCUMENTATION FORM ERG #    [d M -d,/        REV   f          EOP # !i/d / '/             REV EOP WRITER       /M                                 DATE _ b[MhI SECTION I:      ERG STEP O     CorreSpcw             pu )

R%knn G~at c

                                                                                                 . p.

SECTION II: EOP STEP e4 - c c k ee W'L C-I n e [v d e.d O 9 6 e,~, 1 L, w Sc c - + n ~ i~ na a

              $ee         VC O T L=        be&ce                S4 w' p      i 2-    for B^u s T/ F i C A t/o w.

O M

PROCEDURE NO. REVISION PAGE NO. R Q 19101-1 0 W of M O Sheet 1 of 1 ATTACHMENT C ESTABLISH SAFETY GRADE LETDOWN l CAUTION e The PRT may rupture while performing safety grade letdown.

1. Open Reactor Vessel Head Vent isolation valves:

e HV-8095A *

                                                                                            ~

e HV-8096A _ e HV-8095B ' e HV-8096B Is

2. Open Reactor Vessel Head Vent flow control valves to obtain desired letdown flow:

e HV-442A e HV-442B END OF ATTACHMENT C 4

        ,=,..,

M7

r

     ~                                                                        --

GeorgiaPbwer fy f .Q , , , ll894-C

     ,                           VOGTLE ELECTRIC GENERATING PLANT                   o 4l:8/t 4                                                        **

UNIT CNN 1 OF 1 EOP STEP DOCUMENTATION FOP.M ERG $ [ U N ~O.'2- REV [ EOP # /f/d 2 REV O EOP WRITER b/ / M DATE dd / P J' SECTION I: ERG STEP pk cocrese>~ i~5 E~/2 G S k e s O . SECTION II: EOP STEP

3. Manually Align Valves To Establish CCP Suction From RWST:
a. Open CCP suction from a. Locally open valve.

RWST valve.

b. Shut CCP suction from b. Locally shut valve.

VCT valve. SECTION III: USTIFICATION do O S e c /3N /S R 9 N6 d h tust,a < e , a pa , J,w a Ac ab9n /

                                                                                       ~s
                                                                                        /
                  /$C        Q /~~ Q C     l   CO d 0
                                 <                    s O
   '03 ' 3 t AVf

r '

        -                                                                              ~~

GeorgiaPbwer bf b sones somwen onwmsorr we V0GTLE ELECTRIC GENERATIN3 PLANT 0 4 ** 4/'a/M s'* UNIT CNN 1 OF 1 O EOP STEP DOCL.GNTATION FORM ERG # E c -0 2. agy / gap , /Md21 any O EOP WRITER d//_d DATE [ 2 -) U J SECTION I: ERG STEP fo C o f~ r R S f l N' iN) f ie c s' t e e O 5. " au tty ^tisa cce rio-Through the BIT: s- tocativ eti8 a equiv=ent as necessary.

a. Open CCP alternate miniflow isolation valves.
b. Shut CCP normal miniflow isolation valves.
c. Open BIT isolation valves.
d. Shut charging line isolation valves.

SECTION III: JUSTIFICATION C/3 e; c c. e q e 4.Ir9 y e d hh ra s s k' N e 9 (T ifC P s e ~ ' ace pedcc-/cd as<~ ' SYe ,a y O

                                                                                           /W

maom mn  ; GeorgiaPbwer H894-C I

         $0 $ -                                   nowen announon onnnmsnr                             ,,,,a ,           l
        ,                              VOGTLE ELECTRIC GENERATING PLANT                                    0 Y[l8[0 Y                                     UNIT     COWON_                                 1 op 1
                                                                                                                        \

i l EOP STEP DOCUMENTATION FORM l ERG # EC A -0. 2. aEv I EOP e 19 101-1 aEv o  ; EOP WRITER h! DATE $/J. 3 Pr I SECTION I4 ERG STEP 3 Cheek RCP Therusel Bemer CCW lselettee Status:

a. CCW renan isolation volve outside a. Manually isolate CC# to RCP containment - CLOSED thermet barriers: -
                         .                         .
  • Cote CC# returnisointion voive-ouhide containment. -
                                                                                              -OR-ts U                                                                             = Case CCN r + rn isoiation verve
nsioe contet snent.

SECTION II: EOP STEP

6. Check RCP Thermal Barrier 6. Manually shut valve. .

ACCW Isolation Status. IF valve can NOT be shut,

a. ACCW thermal barrier THEN manually or locally return header isolation shu: ACCW return isolation valve HV-2041 - SHUT. valze outside containment HV .975.

i l l SECTION III: JUSTIFICATION Y66 9 d < c ,v 545' A CC& I cz s dCP Wbe-me/ h a e r i e t- C // y 9 , /]le< .W l cpoe, fe n o i 7 c dr - e ~ , .- e I+ ele el IC A n .<p e r i

e,J i n- 4 c.. .~ Ic c;.,,. +v .- a c c .. e e ,n ,che OCmn u ,u a c c k i
. w ,

1 703101

                                                                                                            /w        f
            ""*"                                                                 ~'**

Georgia Power N'flGlAAZvs m nasu nnoneoan m em

            ,                    VOGTLE ELECTRIC GhNERATING PLANT                        0
                  !S/N                        UNIT    COMMON 1 OF Y

(] EOP STEP DOCUMENTATION FORM ERG # [C 4 - /s / REV / EOP # / 2/// -/ REV d EOP WRITER !M DATE j kSY/if

                                                                               /

SECTION I: ERG STEP O C o f r e 5' fJ w iN res M eTP O SECTION II: EOP STEP NOTE Without instrument air available makeup operation of Step 16a should be established using A:tachment C. SECTION III: JCSTIFICATION Q (2 [a e \ VN C 4 U S T / fl C A T7c W O m.... N/

      ~                                                                                     ~ ~ ~              -

GeorgiaPower ll894-C

  . N /Q//lau,                            %.         . -                                 **"
;     ,.              1             VOGTLE ELECTRIC GENERATING PLANT                              o 4/' ! /n
                      <g.                                                                  *aos
  • 2 COMMON O .

UNIT # OF EOP STEP DOCUMENTATION FORM f ERG # [C /l -/ / RIV / EOP $ [9/ //-/ REV O EOP WRITER NM DATE _ ((SY/If l T6 5 7~, F i C A'1 / c N SECTION IJ71IMHb49EP

                                  \l E G P           ei e s ic, ~ cl e e       ;ve        -t . . e /~ J e
            c            cc-      p r e s s c ,.         f '. '~ T T t             r c .u I#              G Pc-       er       sm pp l y,             m m ic e c, g          <'cn; d ca l vec ( v e g r e y v , ,- , z ,, a ., c , y,4p [,                           p t,
                   *r Nhe'c c.. p e e c~. f i a n . S u c ~ ws e du.,           +a w ..

possialv -C= c Th s e c e. e e

                                                        - . $ h ., u 'i    -    ~   c~ i r       c <- r" f r "E ?cr p  i e .- e  a  k  e   d                   .

I . v. c i' b c d oY ow q ) -t e r ne ed < et v cs f /c. 6/ q n,

                                                         - p. e . 9 ,
                                                                               ,s     awe essac(.

as4n k l. s b , ~3 ~

                                                                                   'S       '~"      /' de c/

n, d e w e. -+ k e <-

              'T h . s < N e .

h ew b c.

                 /
                      'v       N T / ct  e        ,w O

AO

r

     ~'                                                                          ~'~

GeorgiaPower ll894-C b f /QMt/hu a, . m. * * *

  • 0 VOGTLE ELECTRIC GENERATING PLANT um UNIT COMMON 1 OFg g EOP STEP DOCUMENTATION FORM ERG # [C 4 - /, / REV / EOP $ / 9 ///-/ azy C EOP WRITER ///M DATE b NY/ C' SECTION I: ERG STEP O C c r r 4 S jD c, ru b' A' ERG Pr Ili c k~'\

SECTION II: EOP STEP mc bevew C {q q j s v c. f u e.k SECTION III: JUSTIFICATION [ u c [v d e u < <v !/ e w- e [e r - ci f a iv C> p / g, D[4 C / A/ c, f .9 f u S2 2 $ L' S Tt f l CRT/o w a[ / JTE ),e f;ee s+ev/4

        .=...
                                                                                          /5

r-n REVISloN PAGE No. l PROCEDURE NO. , 19111-1 0 a W of 2rQ Sheet 1 of 1 ATTACHMENT C MAKEUP WITHOUT INSTRUMENT AIR AVAILABLE

1. Dispatch operator to do the following:

e Unlock and open RMWST TO CCP A ISO valve 1208-U4-183. e Unlock and open Train B EMERG BORATE MANUAL ISO VALVE 1208-U4-188, e Verify Boric Acid flow to blender control valve FV-110A - OPEN.

2. Open Emergency Boration isolation valves:

e HV-8104 e HV-8.439

3. Start Reactor Makeup Pumps.
4. Start Boric Acid Transfer Pumps.
5. Return to Step 16b of procedure.

END OF ATTACHMENT C 1 I l l

                                                                             /S9'

r e

     ~'                                                                       -

GeorgiaPower ll894-C fG .f sg , , ** 0

     ,,                      VOGTLE ELECTRIC GENERATING PLANT
                                                                              ** a m 4/;8le +                          UNIT  COMMON                            1 op g 4j EOP STEP DOCUMENTATION FORM ERo e FC A - I. /       REv     /      EOP e   / ?///-/          aEv      O EOP WRITER        M/M                           DATE     b[        N SECTION I:   ERG STEP O   C O r r- e 5 p z m % o~
                                                                      *w GL KI 6@G            h      Ac SECTION II:    EOP STEP b *C

[q ,y, AC D i n, e f u ded 1 m P SECTION III: JUSTIFICATION d/v C !v ec / 'v !/64( c) l pke,~, ici fer n J u ~ c i. S 4 e n, H.

               ,          s f

l

                                                                                   \

f REVISION PAGE NO. PROCEDURE NO. yggyy,y n Sheet 1 of 3 O' ATTACHMENT D ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized: l

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B 1

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

l e HV-8105 I e HV-8106 ,

4. Verify BIT isolation valves - SHUT:

e H -8801A

 ,                      o   HV-8801B e   HV-8803A e   HV-8803B
5. Dispatch local operators to do the following:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
c. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET l ISO l
d. Adjust to obtain 8 to 13 gpm RCP EEAL INJ NEEDLE VLVS TO fl SEAL:

e 1208-U4-414(RCP #1) l e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

e. Adjus t to obtain desired charging flow 1208-U4-136 CVCS .

SEALS FLOW CONTROL HV-181 BYPASS. l

v PROCEDURE NO. REVISION PAGE NO.

 ,                                                                   Sheet 2 of 3 ATTACHMENT D (Cont'd.)

B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET-ISO
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain' 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

l l l l l l

                                                                               /57

_, _ _-  :- ._ .- .. W ~~ "

                   . :' =:

l

 ,,         PROCEDURE NO.      19737,y REWSION 0               21 of 22 Sheet 3 of 3
    "' )                                     ATTACHMENT D (Cont'd.)

C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT: i e HV-8801B e HV-8803B
5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT ,

e HV-8801A e HV-8803A pp

b. Verify Train A charging isolation valve HV-8106 - SHUT
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP fl) ' e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

END OF ATTACHMENT D 4

Georgia Pbwer ~J;',1 c _

      . r lac, u                            _ .              .   -                                             ___

VOGTLE ELECTRIC GENERATING PLANT 0 g; . PAG. NO,

             ," ,
  • CO M N UNIT 1 op 1
                            '" ~

EOP STEP DOCUMENTATION FORM ERo . ECA -2.1 aEv I EOP

  • 19 21-1 aEv o EOP WRITER d//M DATE
                                                                                                       /

((c77/97 SECTION I: ERG STEP 4 Geck 07 Level - GitEATH THAN a) Switen to citemate AF# water succiy.

                                                                                                                           ~_    ?

O v SECTION II: EOP STEP

4. Switch to standby CST.
4. Check CST Level - GREATER THAN (15)%.

SECTION III: JUSTIFICATION b b u c/dy df/ /S a (Ye e uc 4 e [] S Lv t o p p ly 'P/c ~ f s no ei Le valae -c , ~ c h de el O XT

r 7a f.% GeorgiaPbwer

                                                                                                                             ~y/ac VOGTLE ELECTRIC GENERATING PLANT                                          0 cars g, / . - .
                         *     0 *..

PAQ8 % y U' NIT COPO40N 1 op y P EOP STEP DOCUMENTATION FORM ERo # ECA ol.I REv l EOP # N l2l-l REV b EOP WRITER , k//d DATE _ [M 7[T / l SECTION I: ERG STEP 7 Check if Centeinment $ prey Sheeld'Be Stepped: j

o. Soray pumps - RUNNING c. Go to Step 8.
                             ,             b. Containment pressure - LEIS THAN                 b. Continue wim Stoo 8. WHEN
                                              ' /ll) PSIG                                       , c'entainment pressure'less rnan
                                                                                                   //// psig, THEN do Stoos 7c and '+.
c. Reset comninmem scray signal
d. Stoo comainmem sordy pumos and O place in stanaby:

l (Emer piam scecine means] 1 e i O i l _

F weno m Georgia Power - . - ll894-C

      .b f &                             , , ,
      ,,                         V0GTLE ELECTRIC GENERATING Pt. ANT                  0 ONS%                                  COMON                       "1     2 UNIT                                MOT nt O
 \j EOP STEP DOCUMENTATION FORM ERG 4   [6A '2 I        REV   [      EOP $ / k/f /~[          agy _   O EOP WRITER         h/M                           DATE     ((M/ff Ge?

SECTION ID ERG STEP

7. Check If Containment Spray Should Be Stopped:
a. Spray pumps - RUNNING. a. Go to Step 8.
b. Containment pressure - b. WHEN containment pressure LES.S THAN (15) PSIG. is less than (15) psig, -

THEN do Steps 7c and d. Continue with Step 8. O c. Reset containment spray signal.

d. Stop containment spray pumps.
e. Shut CS Additive Tank e. Dispatch operator to, isolation valves: unlock and shut CONT SPRAY ADDITIVE TANK' e HV-8994A MANUAL OUTLET ISO e HV-8994B 1206-U6-029.
f. Shut CS pump discharge isolation valves:

e HV-9001A e HV-9001B O

      ';3 7 3 t
                                                                                    /dl
           ""**                                                                                    ~~

Georgia Power ll894-C h) f h ma um -w

            ,,                         VOGTLE ELECTRIC GENERATIN3 PLANT                                   o"
     ~                                                                                    '
                    !' 'b                              UNIT   CO M N                                          OF E0P STEP DOCUMENTATION FORM Enoe FCA-2/                   azy    /     EOP #              / 9/ 2/-/ aEv                0 EOP WRITER           ///M                                      DATE   d df[h7
                                            #    '     #" N SECTION IfJ:               p S.'s ~ l spo e, f e v c. l u e uece d e s ip u bas n sk a d dy I"'lu d e d .           V   EC     9                                                                    I hen          penpr a. c e s h y pct d ,

in a de .

                     -                                           9 I

O I  ! l l l 1 l i l i O 703'cv i

                                                                                                                          )
        ""                                                                                   ~~

e - GeomiaPbwer

                                                   'O                                           ll894-C 6 T .kD.C+2                      a nos wio oemmeein
  • V0GTLE ELECTRIC GENERATING PLANT 0 Y, 5. D E UNIT Col 440N 1 OF E E0P STEP DOCUMENTATION FORM ERG # ECA ~N-l REV f EOP # ,hl11 -l REV O EOP WRITER h DATE [$fNT SECTION I: ERG STEP 11 Roset Centeisment Iseleties Phase A And Phase B
                                                                                                         .?

v O MJ

GeorgiaPower ll894-C g .[ g d 6

       ,,                                   V0GTLE ELECTRIC GENERATING Pt. ANT                                 " o" 4/;3/BS                                                                                                 *3 UNIT    COMMON 0                             .

EOP STEP DOCUMENTATION FORM ERG # [C8~1/ REV / EOP 4 / /2/-/ REV O EOP WRITER h/M DATE [/ f[b'" Ec@ SECTION ID BRG STEP

11. Reset Containment Isolation Phase A:
a. Check containment area radiation monitors -

LESS THAN (3) R/HR:

                                               'e  RE-0005A                                                               '

e RE-0005B . e RE-0006A e RE-0006B

b. Reset containment isolation phase A radiation monitor if necessary.
c. Reset containment isolation phase A.

l l l l ( O 3,,, loY l . . _ _ _ _ . _ . . ._. __ - _ , . . _ . _ . _ , _ _ _ _ ._ .

       """                                                                                      ~~

GeorgiaPbwer 11894-C b f /Qft);u a,.-

  • V0GTLE ELECTRIC GENERATIN2 Pt. ANT 0" Y/iS/04 UNIT COMMON OF O .

EOP STEP DOCUMENTATION FORM ERG # [CA ~ 1 < l REV / EOP # / A / ~/ REV b EOP WRITER d//M DATE [N/If

'h'S T~ r i= I c Av r e N SECTION IJ71mp Pk s a 8-s J e k v'ed.V cc P dec

c ~h .- u .u cl e .- 4 .sd,~n s O$/GN C. 5 C I CN y M' c F O whe~ ov ~$g cc ce sh pped 708101 .: - GeorgiaPbwer T ,1 c .- 1I b m osnemm osamusw ., VOGTLE ELECTRIC GENERATING PLANT 0 0 4l:! b *' UNIT comenN 1 OF/) EOP STEP DOCUMENTATION FORM ERG # ~2l REV l EOP # b 1l-l REV O EOP WRITER h DATE , ((M((7$ SECTION I: ERG STEP 13 istablisk /17) GPM Charpeg Flows

c. Case charging line flow comrol volve
b. Open charging line hand control volve
c. Open charging,line isolation volves. , ,
d. Establish //7) GPM d v.4 flow ,

using flow control vaive . ~ O - l O F08101 /h7 - t GeorgiaPower 7J,L ki kddyr m enossa ammen aas: V0GTLE ELECTRIC GENERATING PLANT m. 0 0 YlSl% , UNIT CnMiN 8640 m } X OT K Q l l i EOP STEP DOCUMENTATION FORM ERG # E C.O ~ ) . REV l EOP $ I9 lM - REV O EOP WRITER DATE b/M/i$ Ec? SECTION ID E-R6 STEP

15. Establish Charging Flow:
a. Open CCP normal miniflow
a. Go to Step 15c. -

) . isolation valves. -; l . l

b. Shut CCP alternate miniflow valves. -

1 0 1

c. Shut seal inj ection flow control valves HV-182.
d. Open charging line isolation valves:

e HV-8105 e HV-8106

e. Shut BIT isolation valves.

e O I Georgia Power "Td'il_C l ' b f.% mowen sammam casamen moo a **' ' v0GTLE ELECTRIC GENERATING PLANT 0 ,l l ae ,.a 1 4/ S/8S UNIT COMMON JyOF /3 l l'3 t v 1 - EOP STEP DOCUMENTATION FORM ERG # [CN ' 2 ' / REV / EOP # / / 2 /'/ REY - O EOP WRITER d/ N/) DATE /h'8/3C f ' A i c Avf e u SECTION Ifft p m e ,q *" s p e c < fe c v a /a er l a d e d , \ ( E' G & d e 3 /f u ef o e r ev e f h a v e In c oe>.ikro{t,g f u e, Cw l14~ cI * } 'WJ h B .t i <sela%~~~s pv m p c. o a o v f. ineiJeJ . p c e v e m t a h n c y , ~j - ~ cce in e nse o f A t lu ce of O / s'c /? iv o i s i.so h 7% ~ va/ve.c. ivor / m ,,vi f w 0 TCJICT /M ' ~ ~~ GeorgiaPbwer Il894-C ' 70 .f.h . , VOGTLE ELECTRIC GENERATING Pt. ANT 0" */'*/S S ~ O unit co = = 1 orJ f EOP STEP DOCUMENTATION FORM ERG # [d O " 2. / REV / EOP # / k/2-['/ REV ( EOP WRITER /[/[2 DATE , (($f/77 SECTION I: ERG STEP O G. Q C r e S G b N 'I^!} Fva c- NeTe . O SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment A. SECTION III: JUSTIFICATION See 3 U ET/F: c ern w i a c lv c/ e c! O ?CJ'Q1 /7d' & GeorgiaPower ~~ ' ll894-C J) .[ .Q .- " . VOGTLE ELECTRIC GENERATING Pt. ANT 0 Y/S/M UNIT COMIN OF ~- EOP STEP DOCUMENTATION FORM ERG # [C A ~~ 2 [ REV / EOP #  ! [ M "~/ REV O - EOP WRITER M/!d DATE b/Rf/T7 '7 v 5 7", F i C A't /c IV SECTION IJT* IMHF40EP N bbD C e S / 7 fu c[ c e s ,v c 7 s av L .k C c<r ccm pressac gc_,7 ef _f r c ,, q i e R e ec- e= s ~ en y. a h ~ , , , ~3 -P/c ~ t c a+c; { v a. ( v e 's c e c, v c e 's a. s , e s y p p ly , y t s- ' cc + heir c .. p e c d f e s . S e c = vs e ciuce +o be O pcssisl, -Se.c Th <s ereee ~ c t e c er wpm ic.i' -,Yk e ut i.u p le me a f e d ctva , /c. 6/e, 2 n, q l i e r n, d . m etLe d o +' <S < " c " S ' " r /- cs42 Ll.s6,~)e c har) f~'c 's ' ^' " (')ai m H e .. n, s e ~ e. 4 k e a 7 h , , fv /4 T-/ c_ e b ,w ew bb O /7/ .. 1 "" ~'~~- Geo iaPower ll894-C 6 *, 7 %dCw 4 . powen aansaarca osaame=r , VOGTLE ELECTRIC GENERATING PLANT 0 or, O. ='; '~ ~ UNIT COMMON 1 op i f EOP STEP DOCUMENTATION FORM bb - N.l REV f EOP # lh O I 'l REV O ERG # EOP WRITER A) /d DATE 6Nf[9f / / SECTION I: ERG STEP 19 Stop Low Heed 51 Pomps And Ploce is Stendhy O SECTION II: EOP STEP

19. Stop RHR Pumps.

SECTION III: JUSTIFICATION O 4u9e Gfmi~ !O9V ' ' i~occsa o e c .3 o c v o el e c s h s c / , ~ c, . '/E G P cle s 9 ,s, Aas o s h a c/ A v [ e c/e - Aen ' C p v .- o s ace s% 7 p ee/ F03101 /7% --. - _ _ ~ _ _ _ . _ - - . r ~ GeorgiaPower ~~ ti - - Q .[ .g , , , ll894-C ,- g, VOGTLE ELECTRIC GENERATING Pl. ANT 0" O #8/*

  • unit coaan-1 or ,2

"~ EOP STEP DOCUMENTA"' ION FORM ERG # [CA ~ 2-< / REV / EOP $ /f/M /-/ REV O EOP WRITER h/M DATE f/I[ SECTION I: ERG STEP O C o f re s pcw f iv cec N oTe O - SECTION II: EOP STEP NOTE , Without instrument air available makeuo to VCT is not ' available. O P03'Of /77 ~ GeoigiaPower Tg_c 'a bf- ~ menamma==osm aser VOGTLE ELECTRIC GENERATING Pt. ANT .- m. 0 = =a 4/:s/e+ O unit co = = ar or ee o BOP STEP DOCUMENTATION FORM ERG # [C 4 ~ 2, / REV / EOP # / k/ 2 /'/ REV O EOP WRITER DATE _ b f[ @ Tv S 7~, /: 1 c AT/ c N SECTION IJJ' em>40EP pu o 'Y r sv C .k

  • S / } rv Cl c e s (

" 'r cc^ Pressar p~eeed -f c c s m - /rAae-ee s- enl y, y o r mm u m aoc g y p p ly ** ME r 0 [ Va- ( V e s r e g v . c <e ea *r +henc c..p e r e&i o n , L c ~ vs e 4 ls ., 4'c e Th is e r e, e e & u c e +o be possiA c+yrosicr p le -e A e d - ,+b o vY ~ ~ a i r in _ a , a n < Ie hie, T g , 7, , ~ s , , c -9 y e r ~ /< e m p c v cs / cal,+y am mce O "3'C1 /74 r ~ GeorgiaPbwer -- "MI f M ,,m m 11894-C V0GTLE ELECTRIC GENERATING PLANT o" O +/*/w uN,7 ca nu ~ 1 c,1 ~~ EOP STEP DOCUMENTATION FORM ERG # ECA ~ 2 '[ REV / EOP $ /f/d /-/ REV O EOP WRITER // M DATE , 6/9f/Tf SECTION I: ERG STEP ko Correspeudj Eee c A vh O . SECTION II: EOL STEP CAUTION Without instrument air avail:tble CCP suction should remain aligned to RWST. l l l l t SECTION III: JUSTIFICATION a rN < c pe A Jr ofu p o v r i J /e /o r s c -8 e e a smc rn,v s u o c, l y i f /~s A .,e.~f a..- a / o s s. ca.% e ~ , c th e r e is yo Ice -g +o \/ C i  ! O / i / 75 AM8WMA Georg.iaPbwer ~~ I b f -[G . Il894-C "o" ,._ .m. VOGTLE ELECTRIC GENERATING PLANT O ** . u.uiT co - . -- 2 1 0F A t ~ EOP STEP DOCUMENTATION FORM ERG # [ C A ~7_, / REV / EOP # [7/ 3 /-/ REv O EOP WRITER h/) DATE / 8 5-/77 ' / SECTION I: ERG STEP / O CorreSpDN IN) Enc n oT E,  ? O SECTION II: EOP STEP NOTE Without instrument air available letdown shculd be established using Attachment B. SECTION III: JUSTIFICATION 6Q TL/I// C /C A T/d N / u C lv c/e c! O 'C3 ' C t ~~ GeorgiaPower *"~* 'N 1 htdzu. n., _ _ ,.. . VOGTLE ELECTRIC GENERATING PLANT 0 ~~=-- = O- +/ 3/e <<- UNIT CO M N ,,,,,g. OF M P EOP STEP DOCUMENTATION FORM ERG # [C M ' 2-i [ REV / EOP # /f/2./ '/ REV O EOP WRITER M/M DATE d[8f[7f' - TG S T~r P I c Avl e N SECTION IJ7* BRe-40EiP NE0 CbeSI)nt Cf c e 3 p o Y t w C- l * ( G/r ccm preIScr Pe-ered [re,w A -P/ ~ I E' R k P o - e r s~ ppl y. L e-F d o w ~

q. a- cL .i e s 'd p p Iy C Uk r o [ Va ( V c' s r e c7 v c e 0 t' Y beie c..p e r ciY'/ cys, b e c a vg e fi t[

ceSU re (0 0< pesstm{g ( c r Yh !S (* r co - (k b o 'Y ' N 4 /f C'*fMEIF lm p / e m e a h e c/ I d e r N e~i E & 'E Y b a o ct v q r [c b /g q n ,. q. L e & ci e ~ ~ 's r' " ' " S ' " ' f-es4a hI.sb,~ '- 'O ' w e_ ~k k e y h,7 q [d e , p, de - omc s _, o O /77 l " ~ ' GeorgiaPower -- ll894-C 70.f h , .- L VOGTLE ELECTRIC GENERATING PLANT o' ) UNIT COMM0M i opgg t ~ EOP STEP DOCUMENTATION FORM ERG # IC4-2..[ REV / EOP # [f / 2. /-/ REV 0 EOP WRITER /// DATE $[$f/K/ SECTION I: ERG STEP gff !b C. o r e e S [3 a W iN} /_ Nb Q- C. bM Gd .e O SECTION II: EOP STEP {qQ f c~ c NW0+ i n e la d < el SECTION III: JUSTIFICATION /v C [v # C! / tv // f " C e la c <~r / ~ l' . - J, : ~ . o <v S+ep 2V 'Se a M$4 e ko $ ora T4ep 2 cy' he r- _ T LI STI /=~/ C );1 / /0 JV, /7f anocacunsNO. REVl80N Pneg NO. G Q .. 19121-1 0 23 of X O . Sheet 1 of 1 ,  ? , ATTACHMENT B .y " ESTABLISH SAFETY GRADE LETDOWN CAUTION. The PRT may rupture while performing safety grade letdown.

1. Open Reactor Vessel Head Vent isolation valves:

e HV-8095A e HV-8096A

  • e HV-8095B' ,

e HV-8096B .

2. Open Reactor Vessel Head Vent flow control valves to obtain
  • O desired letdown flo ,

e HV-442A e HV-442B . END OF ATTACHMENT B O J77 GeorgiaPbwer -- Q ./ .4 ,, ll894-C , VOGTLE ELECTRIC GENERATING PLANT o O W'8/*

  • unit co = "

l Or 22 EOP STEP DOCUMENTATION FORM ERG # [CA ~ 2 < / REV / EOP # / k/ M /-/ REV C EOP WRITER k/.M DATE f[ f/I[ SECTION I: ERG STEP O C o f re S pc w /tv rgc N oTE , ,, s , .. O SECTION II: EOP STEP NOTE Without instrument air available make;p to VCT is not available. O PC3'Ot /# ~ ~~ GeoigiaPower ll894-C h .[ .Q' ~ " VOGTLE ELECTRIC GENERATING Pt. ANT 0 l m 4/;3/eS CO M N Gy og ggg 0- UNIT 1 EOP STEP DOCUMENTATION FORM ERG # [C 4 - 2, / _ REV / EOP # / k / 2 /'/ REV O EOP WRITER DATE b f!(7 Tu S ro f I c art e N SECTION IJJ B3HF40EP

  • S / p iv C[ c e s fu o T r w t /v q c<c ccm pressar pc - e c e d [c c .x e

/ E- 8 0- P o - e r w ppl y. Ndr N k.ve car supPY / su c o r e f r J [ v a. ( v e s r e 9 v.cw ~ ac +he,c c.p e e x% m S e c ~ vs e t4 ts' d u ce ^% bc O possial, -Sec Th <s erece ec+pcor ice _ , + b c m t c._ ~c,e ~ p i e n e a __t\ e g etvae/c.ble, T ho e po c m % c is m% de q~~ca e, -9 y c v ~ (c e - p c va , (c. k l i +y O 'hI /7 i ~ GeorgiaPower ~~ , b f ,h , ll894-C , 5. VOGTLE ELECTRIC GENERATING PLANT o "q v 4/:8/e

  • UNIT COMMON 1 OF /O EOP STEP DOCUMENTATION FORM ERG # [dA 2,/ REV [ EOP # M[2 /-/ REV O EOP WRITER /ll/) DATE (/8f/kf SECTION I: SRG STEP fo C c ( r t S f a r4 lN tr e c Ait- h ea+ .

O SECTION II: EOP STEP 1 N h I ri c ( v d e L SECTION III: JUSTIFICATION /v c v e e/ /N / eu C l pla c e i d 'u .- a ,c c~ s+eo <c Sae tv0Ts k f c .- e s+enir -f'c c T L) S T/ f/ C f) ~/ /D W O (( . PROCEDURE NO. REVISloN PAGE NO. 19121-1 0 20 of 28 Sheet 1 of 3 (-] - ATTACHMENT A ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106 . . s 4'. Verify BIT isolation valves - SHUT: e HV-8801A e HV-8801B p)i s ' e HV-8803A e HV-8803B

5. Dispatch local operators to do the following:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
c. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL: -

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

e. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

O 3 PROC 6 DURE No. REVISloN PAGE No. ~' 19121-1 0 21 of 28 [J ATTACHMENT A (Cont'd.) B. Establish Charging'With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS

, 'd. Shut.1208-U4-134.C.VCS SEALS. FLOW CONTROL HV-181. INLET - ISO -

e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO l I
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

%VAS [f 4 v / m-PROCEDURE No. REVISION PAGE No. 19121-1 0 22 of 28 Sheet 3 of 3 m (j ATTACHMENT A (Cont'd.) C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B ~

5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT

'e HV-8801A e HV-8803A _ b. Verify Train A charging isolation valve HV-8106 - SHUT \'

c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-13^ CVCS SEALS FLOW CONTROL HV-181 INLET ISO
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) - e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

6 END OF ATTACHMENT A (3 u> .(_ 703445 'v l GeorgiaPbwer 77;';;_c  ?. ? 'kdim - e. o. .a ,, _ V0GTLE ELECTRIC GF.NERATING PLANT 0 UNIT COMMON J, op EOP STEP DOCUMENTATION FORM ERG # EC A -3.1 REv I EOP # /h l 7 f -l REV O EOP WRITER _ l//M DATE / I/Akff" / SECTION I: ERG STEP 2 Roset Castoimmest Isaisties Phase A And Phase B O i O ' 1 l maini I ~~ w e ggOrgia FDwer il894-c *g .7 g . V0GTLE ELECTRIC GENERATING Pt. ANT o"* un . 4/ 8/BS UNIT CO M N 4 Or,e O EOP STEP DOCUMENTATION FORM a ERG $ 6 C A - 3, / REV [ EOP 4 [f/8/M REV O EOP WRITER M/J DATE d hTT es SECTION ID ERG STEP

2. Reset Containment Isolation Phase A:
a. Check containment area radiation monitors -

LESS THAN (3) R/HR: , .~ ' ' e RE-0005A . .- ' e RE-0005B e e RE-0006A o RE-0006B

b. Reset containment isolation phase A radiation monitor if necessary.
c. Reset containment isolation phase A.

8 O 'S GeorgiaPower di'a_c 70.f & .owen onnenama me aewmoie cam V0GTLE ELECTRIC CENERATIN3 PLANT 0 '~ y 4/;$/B4 UNIT CO M N = =o. 3 .-- F - O F M O-EOP STEP DOCUMENTATION FORM *-h h ERG # $~C // '3,/ REV / EOP # / k/ 3 / -/ REV O EOP WRITER d//M DATE b[d$/T T Tw' S 7~, F l c A 1 / e N SECTION IJJ-B4WF40EP Y { & 'h N e r/f p/ O t' S N" ~ p g ,, Q,. P la ~ + s ec c i f'c m e ,e , ~c /v d ed-m

  • S O

O NJ'cr A '- GeorgiaPbwer c O

. Ph
a. .

*"- C UNIT c.,_., voat's s' acta'c assenarina et4~r COMON f _7g, G E OF# EOP STEP DOCUMENTATION FORM l ERG # ECA-3.8 aEv i EOP e 14:31-1 aEv 0 EOP WRITER A)/ A DATE O-f[7d SECTION I: ERG STEP i 5 On.k if Casteament Sprey Shosid Be Stepped:

a. Soruy pumes - RUNNING c. Go to Stoo 6.
b. Containment pressure - LEIS THAN , b. Cominue wit Stoo 6. WHEN ' '

a; PSIG . comninment pressure is less ' - than /21 psig, THEN do Stoos Sc cna d. ~,- Q c. Reset conteinment surcy signet

d. Stoo cont:inment scr:y pumns One picca in stenecy:

l Enter cient scoctfic means) l l O / l Georgia eower ig;;_c

v 1 kJdra. -- _.

VoGTLE ELECTRIC GENERATING Pt. ANT 0 aus **oe m z '3 '/ N UNIT CO M M . t OF O- - EOP STEP DOCUMENTATION FORM .. M ERG $ hC ~3 / RIV / EOP $ /[/8/-/ REV O EOP WRITER bl/ A DATE dD Ec? SECTION TI? ERG STEP

5. Check If Containment Spray Should Be Stopped:
a. Spray pumps - RUNNING. a. Go to Step 6.
b. Containment pressure - b. WHEN containment pressure LESS THAN 15 PSIG. is less than 15 psig,

' 'THEN do Steps Sc, d, e, and f. - , Continue with Step 6. O c Resee conc ^tn=ent a9r^7 signal.

d. Stop containment spray pumps.
e. Shib CS Additive Tank e. Dispatch operator to isolatio.. valves: unlock and shut CONT e

SPRAY ADDITIVE TANK ' HV-8994A MANUAL OUTLET ISO e HV-8994B 1206-U6-029.

f. Shut CS pump discharge isolation valves:

o HV-9001A e HV-9001B O J e)'$I O . Georgia Power "gi';;_c 10 $ k& h u. w ae.eu m m m. VOGTLE ELECTRIC GENERATING Pt. ANT 0 QATE - 4/ S/e4 ~ ~s 3 UNIT COMMON 4 op p O EOP STEP DOCUMENTATION FORM ERo # 6 C 4 2</ REV / EOP # /k/2/'/ , REV O EOP WRITER ff / A DATE d/MfdC , / ' S T ): 4 C Ay r e y SECTION IJ7:hp w e e .e f ru c lv d e.d. hl% ~ I S' foe c i Se v et h e e s 3 -/ a ~ d' Ay a c / e when VGGP d e s ty n Aas s h p e n.d D.'n tspeei f,e

c. < v

~ Pu~es cene+u,m rw e rk n e th e d' s- o f s fogopr~ e, es cegar,a d 6y s p ra y w a c k r u e la d e d ~~ F R C I. O O y GeorgiaPower ~'t;';;_c '""*l kshu ... -.e...--., , , _ . 0 m VOGTLE ELECTRIC GENERATING PLANT 0- 4'.' ; . y , ., r0MMON nov.a. UNIT 1 0F 1 f EOP STEP DOCUMENTATION FOPJ4 ERG # R A - 3,1 agy l gap , 4/3l-I agy o . EOP WRITER ///M DATE 6[') f[f7 SECTION I: ERG STEP 14 Mese AE PRIX Nester Switches la ON Posities k O SECTION II: EOP STEP

14. Place All PRZR Heater Switches In PULL-TO-LOCK Position.

SECTION III: JUSTIFICATION I b be rcmese m u & c, -Orp o cc S to w c. av d per ~ b <de o c o s s e r rz i n e; s O /91 * ~ GeorgiaPower ~ ~~ $ .f .,% ,, l ~11894-C ^ VOGTLE ELECTRIC GENERATING PLANT , 0" *' * / *

  • O UNIT CO M N 1 OF h t

EOP STEP DOCUMENTATION FORM l ERG # [ C A - 2i/ REV / EOP # / 2/ 2/-/ REV O EOP WRITER [/ /l DATE [/kdf SECTION I: ERG STEP d d o rrG.5 g 4N IN E 02 G /V o T e ~ . l l O SECTION II: EOP STEP NOTE Without instrument air available char;;ing should be established using Attachment C. SECTION III: JUSTIFICATION .59 O [ A/ c [v M C L. 'T Li S T / f i C ni/O k O H3 l 70 f /4t</su. GeorgiaPower .e o n.= - T ft.c ,, VOGTLE ELECTRIC GENERATING PLANT 0 0 * */" unit c-- TORA ~ EOP STEP DOCUMENTATION FORM ERG # FC4- 3, / azy / EOP e /f/".f/-/ aEv d EOP WRITER Af /A DATE _ d[8 N f '7%' S 7", F l C AT / Q N SECTION IJJ- M P_ '\f E C D d e s p ~ c/ c e : y n ,. g je " ' " 'c" Pressor pc.~ e , e d f cc.s y pg / e A a se e .- m gpf y, e % ,,,g va (v e , v e n . <- n ~ .. a,c g a ggj9.. y a4 c c l *c +henc c.pe.y % u, 85 p .s e +a if t g . 9 Possiaf, . Scc Th <s e ee,e e d u cv be .i bcuY ~ c ,, cu+frasice pie, en f e d m e t k a e oS i v. <t v a , le. b l e , a n, n 14 e r u cA . <s ~~ "' <

  • s s r f-us4,klsk,~3 e haryi~e, '~c ~ e~

n ,, ,He..n.s c ~ aw~ is t av lA l l c c h ,- e w & C-. O MV ~- m GeorgiaPbwer ~ g ;*_c g Mf b ma es eneen osmmesc ,,,, 0 , VOGTLE ELECTRIC GENERATING PLANT -  !#0[U UNIT CO M N ], op EOP STEP DOCUMENTATION FORM ERG e ECA - 3.i REv l EOP e Ml31-1 aEv o EOP WRITER - kJ /k _ DATE I/N/fe SECTION I: ERG STEP 20 letabilah (13) GPM Chart ali M***

o. Cosa charging line flow control volve

, b. Open charging line, hand - . control volve ,, '~

c. Open charging line iso'otion volves . .,

~ O 4. s>'==iisa > or* ca=rsie, flow using flow control volve O m y /dh GeorgiaPower '~iig c _ VOGTLE ELECTRIC GENERATING PLANT un 0 O 48/e* usiT cossou 8404 % t Orze P EOP STEP DOCUMENTATION FORM ERG # $ CO - ), } REV [ EOP $ REV O l Q / M-f EOP WRITER Af/J DATE ((bd[6 Sc? SECTION II) ERG STEP

20. Establish Charging Flow:
a. Open CCP normal miniflow a. Go to Step 20c.

1 solation valves.

b. Shut CCP alternate '

~ miniflow valves.

c. Shut seal injection flow Q control valve:

e HV-182.

d. Open charging line isolation valves: .

e HV-8105 e HV-8106

e. Shut BIT isolation valves.

O - /9d GeorgiaPower _ 11894-C . 3,7 g maoensumm m  %* ' == VOGTLE ELECTRIC GENERATING PLANT 0 */"'e ***

  • 3 C) UNIT COM40N TOF t

EOP STEP DOCUMENTATION FORM ERG $ N g - ],/ gEV / EOP 4 ff/ J/ / REV D EOP WRITER' d/)J DATE [/ (([f I S Yo I I C Av / c y SECTION IJ71 h p ~cS tN C lv ek, l4 " S p e ci ic f / c;. lv e h s i r i s c / a -I , c a - ~ ,- i~chLel 0c? r v u e vT , V E G p & n ,y , P rav7~4 k ct a c/ dc95 N e,d ha.e A c . b 4. ry j u Q { e-

  • Vc f ve, 1Ob WRJ ,

c* u N ire f c c e m, - J ea n ago ~r i n clu da li~ e~se A < l. n . a.Do- <so/r-fic~ v~/ae l l O /q,7 , ~it;'n_c GeorgiaPbwer

. ?w 0

VOGTLE ELECTRIC GENERATING PLANT O pre ~. .:' . 4 P40E rco. J UNIT COM40N 1 OF (  ; l t EOP STEP DOCUMENTATION FORM l ERG # ~ *! REV l EOP # l9131-1 REv d EOP WRITER k/ /d DATE [/Al/ff SECTION I ERG STEP 28 ' Osek if Diesel Generator $beeld Be Stepped:

a. Verify oc emergency busses - c. Try to resTe offsite power to

, ENERGIIED By 0FF3ITE POWER oc emerger: y busses. ,

b. Stoo any unicoded diesel generefor -

and piece in stenchy - ~. . s O N101 - ~~ ~ GeorgiaPower IV f be w oomsuno=cewrmen V0GTLE ELECTRIC GENERATING PLANT 0 C Y/*i/M UNIT COMON [OF EOP STEP DOCUMENTATION FORM ERG # 4~C/ '7 - 3./ REV / EOP 4 [f/7/-/ REV C l EOP WRITER M/A DATE i Af/7f' Ec? SECTION ID ERG STEP

28. Check If Diesel Generators ]

Should Be Stopped:

a. Verify AC Emergency a. WHEN offsite power Busses - ENERGIZED BY available, OFFSITE POWER. THEN restore power to-Emergency AC buses by initiating 13427-1,' .

4160V AC lE ELECTRICAL DISTRIBUTION SYSTEM.' O IF offsite power NOT Wailable, THEN restore power to TRT61 and 1NB10 from emergency diesel generators.

b. Stop any unloaded diesel generator and place in standby.
c. Verify 1NB01 and 1NB10 c. '-tanually energize 1NB01 energized. And INB10.

l O V '03 ' 3 ' d  %- - . GeorgiaPbwer - L1894-C d hf & _, _a m VOGTLE ELECTRIC GENERATING PLANT 0 O ** usiT co = = '3,A30 ~~ EOP STEP DOCUMENTATION FORM ERG # 8~C M ' 8 '[ REV / EOP # / 9/3/- / REV O EOP WRITER' 5/ J A DATE [8-((T7 I*' S Y o l= I c am i c y SECTION IJ7 IHug eggp T e h r e S Yb r i ov) l9 " Y Sf'Qeihre m9Ybc ,~ c.Ieel e /. e f 4' s ii e e e .~ e c -ees "r* Meede* S*r D# I M G ol ~ ~ d l N R to #"l ' ~' - ~P re s s v r

  • e e d P o I -~ d ,

p = : . 4 :.. .., a c d ,;, @^$'/g r - O l 1 f O l , /d '03 'g t - GeorgiaPower ~~ Q .[ % , ll894-C , VOGTLE ELECTRIC GENERATING PLANT 0" 4/ 8/9g COMMON === UNIT Q. 1 OF 1 " - ~ EOP STEP DOCUMENTATION FORM ERG # ICM ~3.[ REV / EOP # /7/" 3 /- / REV d EOP WRITER A/ / .k DATE [N/[(j~ SECTION I: ERG STEP fo C c t r es l3 4 tl IN) . t= de c- N O TG' L 3 (J SECTION II: EOP STEP NOTE After isolating flow from the condenser hotwells to the CSTs, the condenser hotwell levels must be controlled manually. SECTION III: JUSTIFICATION N /A - Yk e o p e .sh c :- -H d , r e ( ci . c, + L e c c ~ 4 ~ r e. c A c t-a // l cl o fe & ~ 4 a l ~ +, e w c- ka up O  ; 'C3'ai v M , r ~ GeorgiaPower -- . 10 .f* g , 11894-c ,, VOGTLE ELECTRIC GENERATING Pt. ANT o O uNir co = ~ t Or r+ l EOP STEP DOCUMENTATION FORM ERG # [C A d, / REV / EOP # h/3/-/ REV _ b EOP WRITER M/ DATE d[ If SECTION I: ERG STEP ,YD Ccrrespad DN . r5 g c. RTf u h -}e d 3 O SECTION II: EOP STEP L {qq rc ~GA d iv e Is d a SECTION III: JUSTIFICATION tv c [v e /N  !/ e w o n L , + L,r , - O ,- - _+,;~ c u Sb ha Se: ' 1 v s ti fi enT70 v c -P Ncke b efe e e S & e n 2.c O N)$ 9 PAGE NO. REVISION 31 of 36 h;oCEDURE No. 0 19131-1 Sheet 1 of 3 ATTACHMENT C ESTABLISHING CHARGING WITHOUT INSTRU cy Buses A. Establish Charging With Both Train A And Train B Emergen Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106

  • 4.. Verify BIT isolation valves - SHUT:

o HV-8801A e HV-8801B e' e HV-8803A s ./ e HV-8803B f

5. Dispatch local operators to do the following:

181 BYPASS

a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL T HV
b. ISOShut 1208-U4-134 CVCS SEALS FLOW C 81 OUTLET
c. Shut 1208-U4-135 CVCS SEALS FLOW CON ISO
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDL TO fl SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4) 4 136 CVCS

e. Adjust to obtain desired charging flow 1208-U -

SEALS FLOW CONTROL HV-181 BYPASS. () A v 103nes REVISION PAGE NO. P,ROCEDURE No. , Sheet 2 of 3 ATTACHMENT C (Cont'd.) B. Establish Chargi,g n With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL NV-181 INLET ISO' .
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE l VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

i m.., * \

  • PROCEDURE No. REVISloN PAGE No. l 19131-1 0 33 of 36 i Sheet 3 of 3 ATTACHMENT C (Cont'd.)

C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT HV-8801A e

e HV-8803A

b. Verify Train A charging isolation valve HV-8106 - SHUT T_,i j k/ c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

END OF ATTACHMENT D b m.., ,a GeorgiaPbwer 7 ,7 N f -lG$t)1u m mm common m, .. , VOGTLE ELECTRIC GENERATING PLANT 0 i '0b UNIT CO M N 1 OF l i '~ EOP STEP DOCUMENTATION FORM ERG # 6d/7 ~3. 2 REv / EOP # / P/ 3 2.-/ REV O EOP WRITER M/M DATE d/6kf[ l SECTION I: ERG STEP O C- G r r Q C p c N sm s e c- y are O SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment B. SECTION III: JUSTIFICATION beF 7 5 I/ bl C /7'I/0 W i n c / v el e d O ng ~ ~ -- GeorgiaPower Il894-C b .[ Q . " VOGTLE ELECTRIC GENERATING PLANT 0 y ,  !' /0 Y [OF b Q UNIT CO M N EOP STEP DOCUMENTATION FORM ERG # [ C 8 ~ 3 . 2- REV / EOP # / f/f 2 ~[ REV O EOP WRITER d//M DATE M[f7 3~ s r, >= # c am i e u SECTION IJ7: BRe-eOEiP 'N b b D Cd e S / 7 fu c[ c p s g oY r v c [v q ~ " 'r cc~ p r e s s a ,. P '. - e r e d f c c.. s m ##g P"~*"*"Ppl y. c' A m , 7 , y -f 4, va l v e s r e 9 v cw ma c. , c 3 y ,3 p /y t' di c e [ " +h*'" * * " #' ~ 3 " c' " s e <4<3 O - G' = c ns pre e e d u c, -+o se Possiale ~ c i r ceisprus ?cr pio-ea$ed . $ h c. u t t ~~ / 4 e e ne d 2 & Etb e d oY G t' A / !c b l e , c<. n, ct is n e e + s sx c y. c-: s d n k l . s b ; . 3

c. h a cy i~ g '~" bSc/

's ~ e. 4 k o r, cd e 'l h,s % H e . N T ~/ c. e b .- e su b B. /v O i '03'01 Ad7 l GeorgiaPower 11894-c W .7 . h ,__ VOGTLE ELECTRIC GENERATING PLANT N* O -. l O , ri:ste, ,,, _, 1 0F F l EOP STEP DOCUMENTATION FORM EC M 3< 2- REV / EOP # /M/f d -/ REV O  : ERG 9 EOP WRITER d/[d ~ DATE ~ /M!(( SECTION I ERG STEP 14 EstabEsk (14) GPM Charging j Flow:

o. Close charging line flow control volve .
b. Open charging line hand control -

volve

c. Open charging line isolation -

volves

d. Establish (14) GPM charging flow using flow control valve O

4 3'01 i i , ff GeorgiaPower ~~iisa c ,. fuf kddzu --- . om VOGTLE ELECTRIC GENERATING PLANT 0 O *" """ " * " ~ f EOP STEP DOCUMENTATION FORM C b ~ 3. k REV ERG # EOP $ [9 l30-f REV C EOP WRITER h/ DATE [/hd[I[ Ec? SECTION ID ERG STEP

14. Establish Charging Pump Flow:
a. Open CCP normal mini-flow isolation a. Go to Step 14c. ', ,

valves.

b. Shut CCP alternate -

mini-flow valves. O c. Shut seal injection flow control valve HV-182.

d. Open charging line isolation valves:

e HV-8105 e HV-8106

e. Shut BIT isolation valves.

O . =.... ~ w-GeorgiaPbwer _ ll894-C ,, fil f M . , , , , , - ,,, VOGTLE ELECTRIC GENERATING PLANT 0  !' UNIT CO M N 0F- ~~ EOP STEP DOCUMENTATION FORM ERG # 8 6 M i E REV / EOP # / 9/ 3.2 -/ REV (/ EOP WRITER' ///I DATE b[k[/<fT l D S 7"> 1: I c Av t c N SECTION ITJt % p / 6 +a e ele e , CGP c/es/p, Les wc4 he.ve ~ c h~,9,~,/,~e hm~d co~to ( vm L o. . P/- + ,,,~ , & vm/ % wat i r< e / . Je J. bit iso h.fian.w n.s. . i ~ c /v dd bee % proa~f e keyivy c, 4 c < - , , ,- ,ym g ,a c ,s , , , c m .s e O e~g -P l o w o 'P c c. P ev o r m -l ns i ~ , Sib vre Isa(e,.+<ru vu la e s. l l l \ ~ O f/d ~ -- GeorgiaPower Il894-C ,,- ' 10 .[ ., . "" VOGTLE ELECTRIC GENERATING PLANT 0 ~~ O #sie+ uN,r em > 1 org ~~ EOP STE? DOCUMENTATION FORM ERG # 6C A "3 1 REV / EOP # / 7/ 3 2 -/ REV O EOP WRITER d// DATE. [/Ad((f SECTION I: ERG STEP 22 Cheek if Diesel Generators Sheeld Be Stepped:

a. Verify oc emergency busses - o. Try to restore offsite power ENERGlZED BY OFFSITE POWER ,

to oc emergency busses. - - b. Stop any' unloaded diesel generator and place i.1 standby O O i ~ -- GeorgiaPbwer ll894-C b f. M .- . VOGTLE ELECTRIC GENERATING Pt. ANT o" O #^ */e + unit co - u '2cEL ~~ ~ EOP STEP DOCUMENTATION FORM ERG # F C A - ? , 2. REv / EOP e J 7/ 7 H REv C EOP WRITER A// DATE _ /d([7f Ec? SECTION ID ERG STEP

22. Check If Diesel Generators Should Be Stopped:
a. Verify AC Emergency a. WHEN offsite power Busses - ENERGIZED BY ,

available, 0FFSITE PQWER. . THEN restore power to. E5ergency AC buses by initiating 13427-1,  ; 4160V 1E ELECTRICAL DISTRIBUTION SYSTEM. (g~' IF offsite power NOT available, THEN restore power to IR M1 and INB10 from emergency diesel generators.

b. Stop any unloaded DG and place in standby.
c. Verify 1NB01 and INB10 c. Manually energize INB01 energized. and INB10.

O . 25 ~ n. GeorgiaPower .- y y* g , w assemnonae= m wr _ 11894-C .- we V0GTLE ELECTRIC GENERATING PLANT %w 0 4/;2 /g 4. cos nu --2 2 unlT O k or5if- ~~ EOP STEP DOCUMENTATION FORM ERG # EC 4 -), 2- azy / gap , /pf y 2_f EOP WRITER' h[M DATE [/16/77  ; b S7~rFiCAT/cN SECTION IfJ h p be C e { l G H 3]Deci c rn e . C 4's , + e pc~ec ere <~ela del l r e s -{, c , ~3 <~em are ye<e usry e r PMib inoot 3-e J- ~ 4 4l ~ ocutcc( m pressvec '" J'"' ' " '" ' & " /rr O l I O gS " ~~ GeorgiaPower 11894-C ~ , $ .f ,g , , , - , VOGTLE ELECTRIC GENERATING Pt. ANT o n #8/ev- UNIT COMMOL U 1 OF 4 9' ~~ EOP STEP DOCUMENTATION FORM ERG $ EC' // "3, / REV / EOP # /7 / 3 2 -/ REV O EOP WRITER // DATE kWff SECTION I: ERG STEP [b CCrre5 pan M i ru ([ g G. ,0f a c h"G& O SECTION II: EOP STEP

c. c k vv C

$qq h C~ ,~c l de d SECTION III: JUSTIFICATION /vc!v e /  !/e

  • c I ra /* c e , a s 4 h ,; i ~ 4 . - c f/ ; <> ~ffe o N E$e 3 u S TI Fc c A l 7c v c4 NOTE beOre 5 + 2 p /V k/S

PROCEDURE NO. REVISloN PAGE NO. 19132-1 0 23 of 28 Sheet 1 of 3 ATTACHMENT B ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106 4.' Verify BIT isolation valves'- SHUT: e HV-8801A a e e s HV-8801B HV-8803A HV-8803B 3k G

5. Dispatch local operators to do the following:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO.
c. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO.
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO fl SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

e. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

.O U i - y j mms PROCEDURE No. REVISloN PAGE No. 19132-1 0 24 of 28 gg . Sheet 2 of 3 ATTACHMENT B (Cont'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-85'J8A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438 l
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS. [
d. Shut 120s-U4-134 CVCS SEALS FLOW. CONTROL HV-181 INLET ISO. .-
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO. ,

g f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL: P Tl o 1208-U4-414(RCP #1) o 1208-U4-415(RCP f2) o 1208-U4-416(RCP #3) o 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

i l [ l / P,R0CEDURE No. REVISloN PAGE No. 19132-1 0 25 of 28 g . Sheet 3 of 3 ATTACHMENT B'(Cont'd.) C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B l e HV-8803B

5. Dispatch local operators to do the following:

L

a. Verify Train A BIT isolation valves - SHUT -

'e 'HV-8801A  ! e HV-8803A , yn b. Verify Train A charging isolation valve HV-8106 - SHUT V $.

c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS. t
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLEi' ISO.
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO.
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4) , g. Adj us t to obtain desired charging flow 1208-U4-136 CVCS

l. SEALS FLOW CONTROL HV-181 BYPASS. 1 l

l < l ( . END OF ATTACHMENT B l 703445 17 r , v *.* . P GeorgiaPower 'to F hts u ,o e - ~ _ 0 ' VOGTLE ELECTRIC GENEMATING Pt. ANT im ' O #8/e+ usir enN na t Cr 0 EOP STEP DOCUMENTATION FORM ERG $ I C M ' 3 3 _ REV / EOP $ /f/' 3 3M REV O ///d DATE N@ EOP WRITER SECTION I: ERG STEP _ 4 Try to Estohiish Auxiliary $ prey

a. High-herd 51 pumps - a. Try te start pumps. E any

. ALL RUNNING high-head 51 pumo can Ng be stortW, THEN go to Step 5. . b. Charging /51 pumos - b. Try to start one charging /51 AT LEAST ONE RUNNING pumo. E no pumo c:m be ste-ted. TH8N start PD pump. 2 PO pumo cen NOT_

c. Establish (J) GPM chargirg be started, Ego to flows Stec5. }.
1) Case chcrpng line flow control volve
2) Open charging line hand control volve
3) Open charging line isolation volves
4) Establish /.') GPM charging flow using flow control volve
d. Isolete SIT:
1) Case inlet isolation volves

~

2) Case outlet isolation volves
e. Esrcolish cuxiliary screy flow, e. Go to Steo 5.

[ Enter pient scecific means]

f. Go to E.3 STEAM GENERATOR TUBE RUPTURE. Stee 17b O

// r ~ ~'- - Georgia Power 18 "-c W /deu . . . . _ _ **" o L. . V0GTLE ELECTRIC GENERATING PLANT nos so 4l;!je q. UNIT _ COMMON Q k OF EQ t EOP STFP DOCUMENTATION FORM ERG # [ C /9' 2'3 REV / EOP # / 7 / 2$-[ REV O EOP WRITER M/M DATE [ c) ff Ec? SECTION ID ERG STEP

4. Try To Establish Auxiliary Spray:
a. SI pumps - ALL RUNNING. a. Try to start pumps.

~ E any SI pumps can NOT be . started, THEN g6 to Step 5.

b. Charging pumps - AT LEAST b. Try to start one charging ONE RUNNING. pump.

n L/ IF no pump can be. started, TIIEN start PD pump. E PD pump can NOT be started, THEN go to Step 5. o O . ~~~ ~~~e GeorgiaPbwer ll894-C Qt .f g * ., VOGTLE ELECTRIC GENERATING PLANT o .. e O 4/. 9/e9 UNIT COMMON ) g og,gg y F EOP STEP DOCUMENTATION FOPM ERG # [C /9'2. ? REV / EOP # / 9/ 2 J -/ REV O EOP WRITER h DATE $!c Lo/f'f-SECTION III- STEP Without instrument air available charging should be established using Attachment B.

c. Establish charging flow: ..
1) Open C.CP normal 1) Go to Step 4.c.3.

mini-flow isolation , valves.

2) Shut CCP alternate O mini-flow vatves.
3) Shut seal injection flow control valve:

e HV-182

4) Open charging line isolation valves:

e HV-8105 e HV-8106

5) Shut BIT isolation valves.
d. Maintain RCP seal injection flow.
e. Go to Step 5.
e. Establish auxiliary spray flow using PRZR auxiliary spray valve:

e HV-8145

f. Go to 19030-1, E-3 STEAM ,

GENERATOR TUBE RUPTURE, Step 17b. FC3 @ C "b GeorgiaPower '"it;'g c 70 .F h ...on..aae em = wen . 0 VOGTLE ELECTRIC GENERATING PLANT (j- "'" '^ ' CNN op Jg - #8/e+ UNIT EOP STEP DOCUMENTATION FORM EOP # / [/3 7 M REV O ERG # [C M - 3. 3 _ REV / EOP WRITER d// , DATE l l O S 7~, F i c A-y-f e fs SECTION IJ7: %p_ 4y Yb [ mp r dVR b b a. MyeM YGrmi" J d e c s % ,a d in9, V EG p 4 e .s iy a cs p o c~ % c u m ha ce w e - h c c3 i.~y l w? b m ~ d c c Arc l clo e i l c+ VEcb edP va (v e , s e Y' e 1), w u de .4ed. o v w o. r wSe Y. j esb,Sec2.ficys h a , S '9 ~ c/ c e c a c t , .< c /m )C Al s ca n t " c e .w q c<r ccm pressU, h ' ~ C r e cA d/m,7, pg G e r sv ppl y, /F Po a,c gypp j. Va lV e s r e <j v . c .e sa ',* E r0 f S e c u m.,e ,y,, c Y heic o..p e r edf o u, to bc c .e cl u c e 4ec th <s ecc ~cer cc,wprer r P o ss t ile - ,i ts e c t c Im p l e .m e a f e d & e 'T-~ k e d o '~h q / -t e r or c i e cl V 4 r !c. b[g q n, is s e < + s se c f. esin h I< s b , ~3 c h a. c y i ~ 3 i ~ e fu ele d Y h,, ~ He.n d e ~dkc d is O ( 'v lA Tl c. c hn e sa V 8. F ' *""' GeorgiaPower ll894-C ,s- Q .[ .ph .-

  • o VOGTLE ELECTRIC GENERATING Pl. ANT Y/#8/0Y UNIT CO M N 1 OF 1 I

EOP STEP DOCUMENTATION FORM l EOP # / k/ 3.7-/ REV O ERG $ d'dC A ' 3 _3 REV / /// DATE [bddf EOP WRITER SECTION I: ERG STEP _ f a c o C c e y psu N tm E R G- N 0 t E' . t e SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment B. l SECTION III: JUSTIFICATION Sc? e T U S Tt f ic RT70 N l r a c /s J e c! O i ' II8 P03'31 r , e GeorgiaPower ~{t ',1_c , *. 70 f /CIlley., newsa came oe** men .e,,,,,,,, l 0 t VOGTLE ELECTRIC GENERATING PLANT onre PAQt e (s 1 CF [3 Y/'S/B Y UNIT COMMON EOP STEP DOCUMENTATION FORM ERG $ Ec4 - ?. 3 Rzv / EOP * /9/ 3 7 -/ Rzv o EOP WRITER // /M DATE 6/$d/ff" L' S 7 , / i c A'1 / c N SECTION ITJ* N P-NIEGQ c) g ' ' S ~ c / c e s g o v , ~ < /m JC r e .w q p r e s s a r- P'.

  • e r e c A m , 7 ,g _gg

"'c cc~ - / F g 4 Pe- e r s3ppl c _j r e c,y v,,, , q,, ,, ' f Va. i v e k 'l Mb r 50 he'c S e e a. , , ,4 , *r o..p e r dt o u, d u c, ie be O Th<s e,e ee possiale 4'c c .YLcut ~ c <r cc,wgrec k! ,w e a i e d Im p le - e t k c e c 4' <tvar l~ b le, a ~ n l i e r vi d >. a w e + s s c c y. is ' esdn k l.s b , ~3 c h a cy ,~ 3 es '~c Ac/ed .m e. -F k e a T h, s m N e . r,d e b ,w e w b G / v A t/ c. e l O - 193 ~ ' - - "" GeorgiaPower ll894-C O ocwen an ,suvon eenmens " " * * \ ' ' ' 7 U*4 0 VOGTLE ELECTRIC GENERATING PLANT ** ', 5. S 4 UNIT COMMON 1 OF Y EOP STEP DOCUMENTATION FORM EOP # lh l33 -l REV d ERG # b[A '3. 3 REV l ___ /// d DATE 8/96/Fc- s EOP WRITER . SECTION I: ERG STEP 9 Istablirk /J1 GPM Garyng Rown

c. Case charging line flow control volve
b. Open charging line hand

- control volve

c. Open charging line isolatica volves
d. Estcelish /51 GPM j

charging flow using Sow control volve / )$Y F03101 ~ '~' - - - - - - - . - - - r ~~. AWAOVAL GeorgiaPbwer ll894-C #1 f I  % anwww ""** f VCGILE ELECTRIC GENERATING PLANT care 7 D #8/e* UNIT COMMON MF ret *' EOP STEP DOCUMENTATION FORM O ERG # [C A - 3 3 REV / EOP # /f/3 3M REV M/ DATE _ 6 Odd 7 EOP WRITER Sc? SECTION ID ERG STEP

a. Go to Step 9c.
9. Establish (60) GPM Charging Pump Flow:
a. Open CCP normal

. mini-flow isolation - valves.

b. Shut CCP alternate mini-flow valves.

Q c. Shut seal injection flow control valve HV-182,

d. Open charging line isolation valves,
e. Shut BIT isolation
  • valves.

I O . . . O C .. - GeorgiaPower _ t;'i;_c o7 m . . . . - . - ~_ 0 > VOGTLE ELECTRIC GENERATING PLANT prs O 4/a.'u unit c-s ' '1' OFh EOP STEP DOCUMENTATION FORM CN'E3 - REV / EOp 4 [ /28 '/ REV ERG # EOP WRITER- M DATE , , C j TV S 7", F I C AT / C N SECTION Iff see 40EP_ s/ EG p ee.3, r, C/o"S "" c ha<y>~3 I " 'v e haad '*"4rsl v*I"'I as ' ' ' ' ~ ' ' ' ,~ y , w da Ie +

  • d ' ,vf.-

Jb wo s ec.9 c . , ,, c t J e d - % er***"4 " e (u se J. "ree<,Ce v"" O Pa i i O - - 84 3 ~~~ ~ ~ Georgiafbwer ll894-C "W .f . g ,

  • 0 V0GTLE ELECTRIC GENERATING PLANT O , Y[!8/0Y UNIT _ COMMON 1

1 OF+ , EOP STEP DOCUMENTATION FORM / bO8/ REV O  ! ERG # [U 8 ' 7, 3 REv / EOP $ EOP WRITER DATE _/ !M/f ERG STEP _ ) SECTION I o ss O Corre3pcsi ERc N dT E _ h i l SECTION II: EOP STEP NOTE Without instrument air available makeup to VCT is not I available. I 1 i l l \ \ l SECTION III: JUSTIFICATION Soo 2 u sri r,' c am e I r a c lu cle d O . . J 9' 7 . ~~ ~' GeorgiaPower ll894-C b f M4 ,, VOGTLE ELECTRIC GENERATING PLANT f wm '*} ' Y/*'3/B V- UNIT COMMON t -Or r P EOP STEP DOCUMENTATION FORM ERG # [C ,4 - f 3 REV / EOP 4 / 9/ 33-/ REv O /[// DATE , [/$d/77 EOP WRITER' h s r ,p oe n ,-i N SECTION Ifft % p_ N C lv d e ces IV e'i t CSf7H re l fro- s

  • N r- < c c_ c ,~

p r es t er p o cV C T ~ kevp eo.drei p c. e c se pply, S' ' # b " - f)c I _ f E. a~ n i r. s u p p f . f" '

  • v c< Ives r e ivice ,+,s p cssi h4 o p e ca+, e B e e a ,,

Ne n '" P l **vc' " " l' O . So > +h,c ,, c c c edsce c c .~ p r es3cc tA~+ m,n E + , ,, m , c ' L e. a c c <s YAoo 0 .- m + . c n ' y ^' " } Ye Le vp \ /cT na c<. v e , la b le . O ' f9f  ; 733'C1 l ^' GeorgiaPbwer ll894-C Q .[ . g ' 0 y VOGTLE ELECTRIC GENERATING PLANT O [d[0Y UNIT COMMON 3 1 OF P EOP STEP DOCUMENTATION FORM gzy / gay e / f/ g_y-/ azy 0 ERG e fCA -].3 EOP WRITER _ DATE 86[ff SECTION I: ERG STEP l*M ,Y O C o f r e syOOM sac nave . O 1 e SECTION II: EOP STEP NOTE i Without instrument air available letdown should be established using Attachment C. SECTION III: JUSTIFICATION 5ea 3 0 ST/ t= ic RTn a e a e i s & e cl. O . t Lf . ~~- ~ GeorgiaPbwer ll894-C 7d) f M 2 .-

  • 0 g .'

VOGTLE ELECTRIC GENERATING PLANT "" ~ O 4/:3/e* UNIT COM 50F M EOP STEP DOCUMENTATION FORM / EOP # / h/ 3 3 -/ __ aEv c ERG # [C A ~ [ 3 ___ REV _ M/ DATE MO/ff EOP WRITER TvS7,FIcAr/cN SECTION ITJ: 99e498P_ c[ c e s pf o t , ev ( .k e \f b b'- D C e S / 7 fv n i ' q r e .w p r e s s a ,. h ' ~ E r e o.\ *'r ccm e e s' pp ly, L *+ dow -FL / E b @.Pe i,a k,c g . ym p ly V a- ( v e 0 e ce <j v.c e  ? **r"'I+he,c ' 0 l c .p e c ~% u . S v e n .s e ,4,, C$ v c m (a be O " $ c o- Th 's f r c., ee c' c r wgrug ic., 3 I e SSI N{e /r im p/ewc'aked 'YbecI'~C~etb. - e 4 s H e e n, ~+ .. a v c < /c 6 le, e ~ is iv e e + s s c~ c p es h kl,sb,~3 /e + d e - ~ /5 ' ^' C ! ec/ ie .w ik d T h, s s[~Ye.c.,% ' C, h ,w e at I 'V N 7[ C- C: ~ O , WD s

  • GeorgiaPbwer 11094-C fG .[ g o' VOGTLE ELECTRIC GENERATING PLANT

[#0/0Y UNIT __ COMN 1 OF 1 l EOP STEP DOCUMENTATION FORM EOP e / 7/73 -/ amv o l Rzy / ERG e EC A - 7. 3 M DATE I/M/Pf f EOP WRITER SECTION I: ERG STEP _ ,YO c c.> c r Q S f 0 H '"} g ga c. oavuo-O  : SECTION II: EOP STEP CAUTION _ Without instrument air available CCP suction sh remain aligned to RWST. JUSTIFICATION *rM < o 9 9 .- cthe r-SECTION III: o C' a o o rs i A te / ss o -P c c e s v cra ~ w fi e e.t i - g M n ~+ m e. l O . PC3 'Q t r . '- o ~' GeorgiaPower O ll894-C n** powsm GENERAftCN CEPARTWENT ***~~* "I . '4 " o voor's s'ecraic cessaarino ete"T O -Te 1 OF a.~: U '. UNIT _ COMON EOP STEP DOCUMENTATION FORM O b$'13 REV l EOP # Nl.38-f REV ERG # h[k DATE M848f-EOP WRITER SECTION I: ERG STEP 16 Check if Diesel Genersters Shosid 8e Stepped:

c. Try to restore offsite power
a. Verify oc emergency busses -

to cc emergency busses. . ENERGlZC SY OFF5ITE POWER * '

b. Stoo an'y unloaded diesei generator and ;:lete in stenchy ,

g r [ O .3_ ~~~ won 0 VAL Georg.iaPower ll894-C ,owen aswem m oena m en, **" b[ VOGTLE ELECTRIC GENERATING PLANT o o,re '

  • 7 Od Y/'S/B V- UNIT COMMON -4 OF ,r2.

t EOP STEP DOCUMENTATION FORM REV / EOP $ [f/f_'f-/ REV O l ERG # /'C M - 3. 3 _ EOP WRITER A[ DATE ((bONT f Ec? SECTION ID ErRG STEP

16. Check If Diesel Generators Should Be Stopped:
a. WHEN offsite power
a. Verify AC Emergency available, Busses.- ENERGIZED BY THEN restore. power to '

OFFSITE POWER. Emergency AC buses by - initiating 13427-1, - 4160 AC 1E ELECTRICAL DISTRIBUTION SYSTEM. () IF offsite power NOT s aVailable, THEN restore power to 1NB01 and INB10 from emergency diesel . generators.

b. Stop any unloaded DG and place in standby.
c. Manually energize INB01
c. Verify 1NB01 and INB10 and INB10.

energized .

  • 2O3  :

.b GeorgiaPower '{y;'g_c Id/ [ f., powea osnamam N  %, ' 0 VOGTLE ELECTRIC GENERATING PLANT . ars k'3/0 Y UNIT COMMON oph EOP STEP DOCUMENTATION FORM EOP 4 /7/fl"/ REV O ERG # [ 6A " ?,_3 REV / EOP WRITER- M/ DATE d/Qd/vf '.7s' S 7~, F l C AT / c N SECTION IJ7: H P_ 1 reS b c,~j o N5' /

  • p 4 L ,, J s o c w s a d. i u rs o i ~ ~' d w etc pc ec - ne ,

._p, p g g e g r o s r v r e ac,.v- , ; jpw' - _ +, a ' op^ @/rc >- 0 r J. k n 0 . , ill O ~ ' = - - ' ^~" ll894-C l Geor8laPower

. : . w N.

8 - powEn GENERATION oEPa8TWENT ~~* "o* vcot's s'actaic cenea^rino ateur O '."E =~ " 1 OF '*' UNIT COMMON l EOP STEP DOCUMENTATION FORM ERG $ '. REV , EOP # h- REV O , EOP WRITER b) /.k DATE ~ kAC[T SECTION I: ERG STEP 30 Depresseme RO And Reptered SG(s) Te (20) PSIG ((;11 P510 FOR ADVER$1 CONTAINMENT]:

a. Perform the following:
  • Decrease charging and increase .

' letdown to initiate bocicfill -CR-e initiate blowoown from ructured SG(s) -C R-

  • Oumo steam from ructurec SGis)
b. Rerum o Steo 29.
b. Checx RCS ressure - LES THAN /201 PSIG ((;ff PSIG FOR ADVERSE CONTAINMENTl
. Stoc RC5 dooressurt:: tion O .

b v ' ~ ~ ~ * "' " *

  • GeorgiaPower ' O

$2 W2-. ocwen onneuvone versmena *""o* VOGTLE ELECTRIC GENERATING PLANT 37, 2 s O ee/e# u s,, cas,n, a OF M EOP STEP DOCUMENTATION FORM REV / EOP # /2/ 3 I-/ REV O ERG # FC A - 77 _ M/ DATE OkY[ EOP WRITER Sc? SECTION ID E-RG STEP

30. Depressurize RCS And Ruptured SGs To ' 3T PSIG ('--- ---~
a. Lower charging and a. Dump steam from ruptured

- SGs. rdise letdown to- , , initiate backfill.

b. Check RCS' pressure - b. Return to Step 29.

tzss in^u 2 ,S- eS1G O , i

c. Stop RCS depressurization.

l l 1 l .a e i !l l = - - ' -

  • GeorgiaPbwer d8"-C N7 h . . - -
  • o VOGTLE ELECTRIC GENERATING PLANT om Y/'i/S Y UNIT COM 4 oyh t

} EOP STEP DOCUMENTATION FORM / EOP 4 /k/ F 3 -/ REV O ERG $ 8 C 4 - 3. 2 _ REV ECP WRITER'  ! I DATE , 86df I' ' n 7~ , F i c A-t- f e y SECTION IfJ % p ~ e . -e P in ~+ s p e u ,C e ~e+AcJr a s ee3fevc_tvee +o d e J. S 4 ep u /~c/ le+ el~ a asNI* i n d i c c. 1' e k ~ccy ,. ~ p w d a - n Yh e do -Q ,de p r esssc<21.sy, ' p re ?eer e d S* cl e s ~e i " ""- O \/ 'r c P d " s s cl e e r e ss e r 12 t ~j MdL c d  : b / o - c. c .~ ,v cs s l l

  • l I

l O , - T7 " " - ' ~ a ~ Geor iaPower ll894-C v, ." %dbw.4 pewenocupariouca *arwe=r 0 VOGTLE ELECTRIC GENERATING PLANT , PaGE no. L) J . , ' UNIT _ COMMON 1 OF f$ EOP STEP DOCUMENTATION FORM ERG # bd-13 REV l EOP # lhlM'f REv O DATE bM EOP WRITER , SECTION I: ERG STEP Vo C o r re 3 x n c!,w c E2[] CE hmmI SECTION II: EOP STEP b e q,  :- \ c. c. \ & 0 u 9 i a c. (adee.l '* / F **

  • A/ c !o e SECTION III: JUSTIFICATION

, ~ f r + ic, ~ s ~ 5% p 4  ! n In c i ~. s 9 i 5ee $ v s Ti i ~i c r77a w o a g4en O l F03 tot b PAGE No. REVISION 2d of 46 ~ l PROCEDURE NO. 0 19133-1 8- 9 Sheet 1 of 3 () ATTACHMENT B ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 .e HV-8106 ,

4. Verify BIT isolatiod valves - SHUT:

e HV-8801A O e e HV-8801B HV-8803A I e HV-8803B

5. Dispatch local operators to do the following:
a. Open 1208U4136 RCP SEAL INJ FLOW CONTROL BYPASS.
b. Shut 1208U4134 RCP SEAL INJ UPSTEAM FLOW CONTROL IS
c. Shut 1208U4135 RCP SEAL INJ DNSTRM FLOW CONTROL ISO.
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VALVE TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

e. Adjust to obtain desired charging flow 1208U4136 RCP SEAL INJ FLOW CONTROL BYPASS.

O ^M i e PAGE No. REVISION PROCEDURE NO. 0 g4 of zy 19133-1 33 $/ Sheet 2 of 3 () ATTACHMENT B (Cont'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438.
b. Verify Train B charging isolation valve HV-8105 - OPEN.
c. Open 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS.

' d. Shut-1208-U4-134 RCP SEAL INJ UPSTEAM FLOW CONTROL ISO., ,

e. Shut 1208-U4-135 RCP SEAL INJ DNSTRM FLOW CONTROL IS n)

(_ f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE y VALVE TO #1 SEAL: , e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCE #3) e 1208-U4-417(RCP 94)

g. Adjust to obtain desired charging flow 1208U4136 RCP SEAL INJ FLOW CONTROL BYPASS.

() ' fI l') r , *  ; i D PAGE No. ' REVISION PROCEDURE NO. 0 15 of 24 19133-1 S ft l Sheet 3 of 3 ([')- , ATTACHMENT B (Cont'd.)_ C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT ,

~ e HV-8801A e HV-8803A () b. Verify Train A charging isolation valve HV-8106 - SHUT. 1  ?

c. Open 1208-U4-136 RCP SEAL INJ FLOW CONTROL BYPASS.
d. Shut 1208-U4-134 RCP SEAL INJ UPSTEAM FLOW CONTRO
e. Shut 1208U4135 RCP SEAL INJ DNSTRM FLOW CONTROL ISO,
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEED VALVE TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4) l

g. Adjust to obtain desired charging flow 1208U4136 RCP SEAL INJ FLOW CONTROL BYPASS.

END OF ATTACHMENT B () i L - - . ~~ ll' ""' GeorgiaPbwer ' t4: *70 f M men eenema onwaarr o VOGTLE ELECTRIC GENERATING PLANT Y/#8/0Y UNIT __ COMMON 1 OF f Q EOP STEP DOCUMENTATION FORM [k/3 3-/ REV O ERG # [ C 4 ~3, 3 REV [ EOP $ ///A DATE *$[ N l EOP WRITER SECTION I_: ERG STEP c c, r r e s p a ~ '"j ((o ps k - ~+ gec . O O 1 5 EOP STEP p SECTIOP I! O gg, p -t{~ c h"'" l in c h bd 1 JUSTIFICATION v c !v e /w  !/ec- c SECTION III: ,~., in G c+ n h .* o - S'4 e n < 2 .n / a e .S o e s T3 v s 7 i f i c ,9770 w ,+ / var e O k" L ~e 5 A' '- ? ' . . FC4'0' ,s~ PAGE No. t PROCEDURE NO. REVISION 0 W,of24 /' 19133-1 R 7 l Sheet 1 of 1 O . ATTACHMENT D ESTABLISH SAFETY GRADE LETDOWN CAUTION The PRT may rupture while performing safety grade letdown.

1. Open Reactor Vessel Head Vent isolation valves:

e HV-8095A e HV-8096A - / . ~ e' HV-8095B - e HV-8096B

2. Open Reactor Vessel Head Vent flow control valves to obtain ae trea tecao a rio > ,

.O 3 e HV-442A e HV-442B END OF ATTACHMENT D O f n ~1 7J. y ' f IIO r ~ - GeorgiaPbwer 11884-c to f Atatu .- , VOGTLE ELECTRIC GENERATING PLANT ' o* /0Y C UNIT CO M N 1 OF 1 EOP STEP DOCUMENTATION FORM ERG e F- 6 aEv i EOP e i e, 1o c3 aEv o EOP WRITER k[k DATE b!C6/T8' 1 SECTION I: ERG STEP ko C c r c'e 3 p ace C Ig , E R G- T+ep  :- O - SECTION II: EOP STEP EMERGENCY OPERATING PROCEiURE , F-0 CRITICAL SAFETY FUNCTION STATUS TREES SECTION III: JUSTIFICATION roee dsc- YrY/o l O AYV ~ -- GeorgiaPbwer 11894-C fG .% .M , , VOGTLE ELECTRIC GENERATING PLANT 0 bv UNIT CO M N 1 0F 1 EOP STEP DOCUMENTATION FORM ERG e F-o azy 1 EOP $ lQ AC)O REV EOP WRITER ///d DATE 8/Ad/ff SECTION I ERG STEP s ~ O SECTION I'It EOP STEP PURPOSE This procedure provides an explicit, systematic mechanism for evaluating the plant safety state in the terms of critical safety function status. SECTION III: JUSTIFICATION / r c c ct dw rc b r p er q. , O $6 1 ~ ' . GeorgiaPbwer ~~ Q ./ .h .- ll894-C , VOGTLE ELECTRIC GENERATING PLANT " o" */' */ * * ' O uNir co-na 1 or i EOP STEP DOCUMENTATION rORM ERG # F- o Rzy 1 EOP e l9 AC)O RzV O EOP WRITER k DATE 8/Ad/ff SECTION I: ERG STEP O SECTION II: EOP STEP PURPOSE This procedure provides an explicit, systenatic mechanism for evaluating the plant safety state in the terms of critical safety function status. g od(3 SrcTION rrI: auSTrrrCATION P rcc e e O l '03'31 .f ~ GeorgiaPbwer - - TO .[ .& ,, ll894-C , VOGTLE ELECTRIC GENERATING PLANT O' O u"'r co""a"_ 1 0, t EOP STEP DOCUMENTATION FORM ERG e F-o aEv i EoP e ice pc arv O _ EOP WRITER d//A DATE d/[d/& SECTION I ERG STEP . ho C o rre5pcN c I ^' } . O R G- Shp O SECTION II: EOP STEP ENTRY CONDITIONS i o Following a Safety Parameter Display System (SPDS) failure or when SPDS display validity is questionable, o Exit from 19000-1 E-0 REACTOR TRIP OR SAFETY INJECTION. o 19000-1, E-0 REACTOR TRIP OR SAFETY INJECTION, Step 28. SECTION III: JUSTIFICATION Droe e. d ce E~rc4 Oca d o -l , , .<. , . O lf? ~ ~~ GeorgiaPbwer ll894-C eg y , , VOGTLE ELECTRIC GENERATING Pt. ANT o' O +/a/e

  • us,7 cn .

~ 1 c,1 EOP STEP DOCUMENTATION FORM ERG e F - C) REv / EOP

  • 19 &cc REv O EOP WRITER /// -

DATE_(/kC/7f SECTION I: ERG STEP No Cc r res pe u dj , F /P C s+ep . C) NOTE e Manual menitoring of CSFSTs should be performed by a Licensed Operator or Qualified Shift Technical Advisor, e CSFST's must be checked in order listed. e Priority of operator action is given by the following: e Red (Solid) Path - Extreme challenge, in Tree Order per Step 1. e Orango (Dashed) Path - Severe challenge, in the Tree Order per Step 1. e Yellow (Dotted) Path - Not satisfied, f.n Tree Order per Step 1. e Green (Outlined) Path - Satisfied. ~ SECTION III: JUSTIFICATION ce r- a 5 p e u s , ), // -/ y ha r n v .v if te r C S FS Tk O/c ee ' nr/er he' a o' c2 en b r a c4 / e ~s k t-e s-l,>ce

  • a e,4,e I r,~ ~.~, % rs 9 - - -

~ -- GeorgiaPbwer 11894-C Q .[ .h .- , V0GTLE ELECTRIC GENERATING PLANT o'  ! b UNIT CNN y 1 CF 1 EOP$TEPDOCUMENTATIONFORM ERG # k'O REV l EOP 4 j Q 200 REV , Q _ ~ EOP WRITER /// DATE [/id/fC s' SECTION I ERG STEP 50 *

  • r ' S p a rt Nn i E lE G s +<a_ p SECTION II: EOP STEP ,
1. Che.4 CSFSTs - SATISFIED: 1. IF a Red Condition exists.

THEN immediately go to FRP.

a. Suberiticality (F-0.1) E an Orange Condition exists,

, b. Core Cooling (F-0.2) THEN go to FRP after completion of present pass

c. Heat Sink (F-0.3) thru CSFSTs.
d. Integrity'(F-0.4) IF a Yellow Condition exists, TREN .3o to FRP after
e. Containment (F-0.5) evaluating plant conditions with Shift Supervisor's
f. Inventory (F-0.6) approval.

SECTION III: JUSTIFICAT1UN ~ h i c ,,. , do ,v c> k h o N r mo . r ho o r t *> csam O '03 ' a i M9 ~ -- GeorgiaPbwer Q ./ .h , _ 11894-C VOGTLE ELECTRIC GENERATING PLANT m 0 *//* * ' O usiT cn = - 1,1 EOP STEP DOCUMENTATION TOPJ4 - , , . ..._._..~.m. . . . . . . . ERG e F-o aEv I EOP * / 9 &de > aEv o EOP WRITER d/[d DATE (/ M/7 ( E SECTION I: ERG STEP fo Co r r- e5 g g b g o, 6RC s +2 p, O SECTION II: EOP STEP

2. Log status of CSFSTs on Critical Safety Function Status Tree Log and report status of CSFSTs to Shift Supervisor.

SECTION III: JUSTIFICATION / /c c e r cz s a e u / d , h r y 4c rw.- 6 <~,~e s e e s 4., e e , ~ , . nrccca$vec O l mese l ~ ~~ Georgiafbwer ll894-C $ f.h .- , VOGTLE ELECTRIC GENERATING PLANT o  !' U Q UNIT COM 1 OF 1 - .. .a <- - , - , . . .~.... :. m ., l b. EOP STEP DOCUMENTATION FORM ERG # -O REV / EOP # / 98dd REV , Q _5 EOP WRITER DATE k/1C/T T SECTION I: ERG STEP o C CJ r r e S p a N im  ! tFE2c- s%e  :- O . SECTION II: EOP STEP

3. RCS temperature per Core 3. Return to Step 1.

Exit TCs - LESS THAN 200*F. i SECTION III: JUSTIFICATION b % e w b te a C 3 ^~S 7 are h ha or o sif t a r e d a .v el w / e w nc~i % c,~y e a .< s +c rs . O ' ~ FCJ'01 /N ~ ~~ GeorgiaPbwer ll894-C Q .[ .h .- oss VOGTLE ELECTRIC GENERATING PLANT o* Y/#8/0Y Q UNIT CO M N 1 0F 1 . as . . . , , . ,,g. EOP STEP DOCUMENTATION FORM ERG # F-o aEv I EOP e 19Aao aEv . O EOP WRITER ///I DATE (($O[7I SECTION I: ERG STEP O . SECTION II: EOP STEP 4 Monitoring of CSFSTs - NO LONGER REQUIRED. l SECTION III: JUSTIFICATION Prmiaq e be c n c c e e d v< e w A e ., m /c . y e,  ; i E L-( ( f E C !O - ~ 952 - ~~ GeorgiaPbwer

74) Y -[G8/Ju. w esmo p on ne w neswr

, VOGTLE ELECTRIC GENERATING Pt. ANT o O *b 8/" unit co = a 1 or 1 EOP STEP DOCUMENTATION FORM ERG # b~l REV l EOP # f 9kdC REV _ O _ EOP WRITER /// DATE ((d0/7[ SECTION I: ERG STEP See C S Fs t s . lNC Vb 2 h , O . SECTION II: EOP STEP Te e C 3 r s i s i N c /u cle et . l SECTION III: JUSTIFICATION ct iv SAcee c- \ v e. /m e s m- ci -\/ cc P ce? i r ete ,v -f i D c .- +i ~ -~s in c fu de cl .  ; O PC3t01 AD PROCEDURE NO. REVISION PAGE NO. 19200-1 c 3 Of 9 O sy,ca111 cit 1 y _ r_o.1 . GO TO 19211-1 19 11-1 NO

  • POWER RANGE LESS THAN M GO TO ,

YES g ## 19212-1 l 9 g .. I - INTERMEDIATE NO RANGE SUR INTERMEDIATE NO MORE RANGE SUR _ NEGATIVE ZERO OR O NEGATivt YES THAN -0.2 DPM YES CSF SAT NO SOURCE RANGE ENERGlZED YES GO TO OO 19212-1 O O ' NO SOURCE RANGE SUR ZERO OR NEGATIVE YES O ur i 703445 954 REVISION PAGE NO. PROCEDURE NO. 19200-1 0 4 of 9 l CORE COOLING - F-0.2 G0w , 19221-1 l ._._....--.-- ' I GO TO l 19221-1 ) NO CORE EXIT RVUS NO TCs 3 - FUR RANGE THAN1SDgep GREA m l YES THAN 39 % YES . l ~ NO

  • COREIIIT GO TO .-

TCa 2 1.9222-1 yngn m - YES GO TO l 19222-1 NO ATt. EAST O casaca RUNNING RvuS FUE RANGE ao - YES GREATER THAN 39% ygg GO TO RCS 19223-1 NC SUSCOCUNG l MONITER l GREA M M N YES GO TO j 31*F , 19222-1 I .  ! RVUS DYNAMIC l l HEAD RANGE NC 1 , GR Am mN = 44 % A RCF 3 0 %-3 RCP x 20 % -2 RCP M

1. 3 % ' 1 8 @

GO YO 19223-1 CSr O ' SAT s -. - . - - PROCEDURE NO. REVISION PAGE NO. 19200-1 0 4 of 9 O cons coottuc - r-0.2 en 19221-1 If22-1 NO COM EXIT Ryus NO

  • TCsLESS "

Puu RMGE THAN1ggsy - GREATER -. M THAN 39 % _ YES NO

  • COREIIIT GO TO ,

- TCsLIB8 - 19222-1 THAN 7ggey , $2 -1 AT LEAST ~ ONERCP - NO EYU8 o RUNNING = ruu.RM. GRuTER TMAN 39% RCs 00 70 sueC000NG No 19223-1 MONITER, GREATER THAN 28'F 1(2 -l l ! RVuS OYNA801C HGAO RMGE NO 8 - GREATER THAN 4 4 %-4 RCP 30%-3RCP YES 20 %-2 RCP , 13 % -1 RCP GO TO 19223-1 cy I ssr O ( ,,.., N PROCEDURE NO. REVISION PAGE NO. l 19.200-1 0 5 of 9 O HEAT SINK - F-0.3 _ 1923 1 TOTAL AVAILABLE NO PEEDWATER - PLOWTO - SGs GREATER THAN 550 YE5 ) GPM i 99999999963 9 GO M 19232-1 l ) ~ NAAADW NO nAngg NO ' l LEVE,W AT E  ! LEAETONE SG ~ " 808 E """ l $ ~' GREAT 51THAN YES 27% m , 900000000 MM g 19233-1 O NARROW Na . RANGE LEVELIN ALL SGs LESS THAN 78% YES

= * * * * * @M'i NO PRESSURE IN E SGsLESS -

THAN1185 PSIG yE3 I l . . ...@ 4"-1 l NARROW NO l RANGE l LEVE.!N ! ALLSGs O ""'a= "'" = i 27%  ? - W er , i, . - n 703445 [ j 9 f o 7 o a ,, 3 FF 88 . 47 22 o N == a s I 2 e r 0 TT a P t u . a r e p  : 4 0 m - 0 o e ' F 3 T E a' 2T e V  ; a' = a'  ! a" a=mI' g R n U a s . C I R 1 T e S a e E O T l ' d l R U I M 0 U I G I ,I i > 0 I L 2 g F i s e L , I p L - A A d - N , I 8 t l O i o I ' 6 m C T , I 5 i A 2 L S R C E o R P m O . ot _ o 0 o 0 o C a a 0 5 0 0 0 3 m o W 1 s 2 2 1 s 0 0 E!"! &si e B =y 2 9 1 , , o N o w d e e m P - I(llI l f > PROCEDURE NO. REVISION PAGE NO. 19.200-1 0 6 of 9 l O INTEGRITY - F-0.4 See Figure 1 ALLRCS PRESSURE NO I am GO 70 ' -COLD LIG TE M RATURE - B~ M EE M g 192'1-1 ' POINT 5 TO 8 RIGHTOF YES ulNTA ALL RCS NO COLA uG .- -- .. 00 is2 L' GREATBt M N . 248'F ygg e TRIPERATURE E RCS NO ~ REDUCTION IN NO COLD WG - E ACS W = TElrERATURES - "*. WGS M - GREATWITHAN THAN 10gePIN 278'F YES THE LAST00 YES O - - CSP SAT E 2 -1 ALL RCS NO l , COLD LIG I m P.MPERATURES GREATIR THAN 048'F YII RCS PRESSURE NO LESS THAN FCOLD 8 GO TO QVERPRESSURE 83 19242-1 UANT YES RCS NC 450 PSIG x ' TEWWIATURE -, GREATWITHAN 27'5'T YEE. ' CEP g i , c. g O . ___'03445_ _ . . _ . _ . _ _ _ _ _ _ _ . _ _ . . _ . . _ _ _ _ _ _ . _ _ . . , _ _ - _ _ _ _ _ . _ - . . _ _ , _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PROCEDURE NO. REVISION PAGE NO. 19200-1 0 8 of 9 O co m m syr - r-0.S 25 -1 NO CONTAINMENT . PRESSURE _ ,,,, LESS f 925 -1 -- ~ CONTAINMENT NO , PRESSURE LESS O THAN 15PSIG YES g3gg .GO TO E 19252-1 E NO CONTAINMENT EMERGENCY SUMP LEVEL LESS THAN YES 89% GOTO 19253-1 ,, CONTAINMENT ' RADIATION LESS THAN 1.0R/HR YES O , Q CSr SAT $bd . PROCEDURE NO. REVISION FAGE NO. 19200-1 Q 9 of 9 O INVENTORY - F-0.6

    • @m?-i RVUS NO INDICATES UPPER HEAD FULL 98 % YES e

e ' S9e GO TO 19261 1. O NO PRESSURian GO To - LEVEL LEss eeGSSeeeeeee G 19262-1 THAN 92% YES S S e NO PRESSURIZER - LEVEL GREATER THAN17% SSG GO TO . YES 19253-1 9 NQ f \ RVLIS INDICATES UPPER HEAD FULL 98 % Yg3 0 -- , . C3F SET R/ 7i ~ s ~ ~~ GeorgiaPower Il894-C 10 .[ . . V0GTLE ELECTIWC GENERATING PLANT 0" ~~ O #sle+ UNIT MN 1 OF 1 EOP STEP DOCUMENTATION FORM O ERG 9 FI-8. / REV / EOP # / 70 //~ l REV EOF WRITER /M DATE 6//9 gf SECTION I: ERG STEP Verify Seester Trip: h il 4 N E " Y 1 will NOT trip, g monuolly ,g p,g E"* * , e Reoctor trip and bypass brookers - OPEN

  • Rod position in6cators - ]

AT ZERO e Neutron flux - DECREASING SECTION II: EOP STEP

1. Verify Reactor Trip: 1. Manually trip reactor.

Rod bottom lights - LIT. IF reactor will NOT trip, e THEN manually open supply e Reactor trip and bypass E breaker to,1NB08 and breakers - OPEN. INB09: e Neutron flux - LOWERING. e INB08-01 e INB09-01 IF eactor not tripped, THE: manually insert control rocs. d i- e e; .,, /l c - ec,/ SECTION III: JCSTIFICATION \/ /_ C D 2 s .. J n J 1:. . , * ',.,.</,c.. % < r h < i l o .- Itsli 4 c,ve c. l //e cc~e T2 /v o . . e y a /c .. c ,/ % ~ r * .n v e im G s e + 4 r c ~. s e e o c e Sr c . - Q ee.,+ccs a ~ . . , . . ""*' ~~ GeorgiaPower Il894-C b .[ . h . , VOGTLE ELECTRIC GENERATING PLANT O' O ' *'** unir en = " l Or 1 EOP STEP DOCUMENTATION FORM ERG $ [ M C.I REV [ EOP $ " [ k 2Ud REV O EOP WRITER dl/ DATE // 7 W SECTION I: ERG STEP 4 Geek 5I Assumeister Iseistles Valve 5tw as:

a. Power to isolation volves - c. Restore power to isolation volves. '

AVAlLASLE ,

b. Ih volves - OPEN b. Open isolation volves uniass closed offer occumulator disenorge.

~ O _ SECTION II: EOP STEP

4. Check SI Accumulator '

Isolation Valve Status:

a. Accumulator isolation a. Open accumulator isolation valves - OPEN. valves unless shut after accumulator discharge.

SECTION III: JUSTIFICATION ec , [pe c, r e Q vire p e - e_ t' c) h  ; < s a Ic._b ~ ~ v m/v er i f a p e ~. ' d o e r m'+2 r /c-. /e</ye &c b e e ~ le e r- i el e a fi fi e ~ % w r-f va kes o ~ .r + b .e closed G ~~ GeorgiaPower N f lfsh)Pv om enowne comme,r V0GTLE ELECTRIC GENERATIN3 Pt. ANT o Y/#8/0 Y UNIT COM40N 1 OF 1 EOP STEP DOCUMENTATION FORM ERG # [/2'Ce REV [ EOP # / 7 2 d / ~/ REV d EOP WRITER M/b DATE d / 7!PT , l SECTION I: ERG STEP _ CQCreSpup tN ff0 rec Mare SECTION II: EOP STEP NOTE Operation of Hydrogen Recombiners may cause a rise in containment pressure. SECTION III: JUSTIFICATION b w 4 x. # d p e T G- rS e h a c. 4 e c , s -f a c- c -S N o {c a o o e c~ + 1 ~ ~ l VGG P Hl r e c.c m b>~ e cz. fdV w as ~ 11894-C 4 $. sonensosteem emwmen " " " 'd V0GTLE ELECTfWC GENERATING PLANT 0 om . #s/e+ , _ ~~ g EOP STEP DOCUMENTATION FORM ~ ERG e FR -C.2 REv i 7x>r e l92n-l REv o EOP WRITER A//d, DATE O /fdf~ \ SECTION I: ERG STEP 3 Oeck II Assumeister Isoletten Vetve States:

e. Restore power to isolation velves.
a. Power to isoistion volves -

AVAILASt.E

b. Ooen isolation volves unless closed
b. Isoienon volves - OPEN after occumulator discharge.

h G AM40 VAL -- - Georp.aPbwer Il894-C 4 N f /Q///2% . "* I VOGTLE ELECTRIC GENERATING PLANT O one " Z M/'S/B Y 3 LJNIT COMMON XOF M EOP STEP DOCUMENTATION FORM .w ERG # (( - Ca 2- REV / EOP # /2222-/ REV O  ! EOP WRITER h[ DATE ((/9/(f' f Ec? SECTION ID ERG STEP

8. Check SI Accumulator .

Isolation Valve Status:

a. Open accumulator isolation
a. Accumulator isolation valves unless shut after valves - OPEN. accumulator discharge.

as h 9 m o *e I ~ 703101 C ~" GeorgiaPower ll894-c bf M .- vT o VOGTLE ELECTRIC CENERATING PLANT mo 4/:8/s q. UNIT comenN _jp OF /3 l EOP STEP DOCUMENTATION FORM ERG # N - Ce 2 REV / EOP # /72 2 2.-f rey o - EOP WRITER f_//3 DATE d [ d c)[2 J~~ Tw'S Ti F l c A't-/ c N i; SECTION IJJiBfMP40EP O p e r e h ,- k N o - l k k} t. rcperemeu eq eo-ec ~ v n , l ~ b le. 1 4 e a+ d' + ^ r sde e -6, ,. 4 n Jc, ,+ r e y a r d'/e = s , , .{ , ,. , , , ,. . l .c -f f A .e - e tt J. l sufG e me 4 t l 167 \ N'01

  • 7 , _c GeorhaPower 70 f A -

voon.:aseme om.amn a nur o ~ O #/'8/" unir c==== 1 or.L 30P STEP DOCUMENTATION FORN l ,,a . 22-H,l arv J .o, e M a l-1 arv o l 1 zor waITra _ A//A parz 6U MP 2' l SECTION I: ERG STEP CA UTION

  • If ECA-2.1, UNCONTROLLED DEPRESSURI-ZA TION OF ALL STEAM GENERA TORS, is in effect and totalfeedflow is less than ni gpm due to operator action, this guideline should not be performed.

e if parameter as [aifor adverse containment]is _ ~ ~ exceeded due to loss of secondary heat sink, . RCPs should be tripped and Steps 10 through 16 O should be immediately initiated for bleed and feed.

  • Feedflow should not be reestablished to any faulted SG if a non-faulted SG is avaliable.

O f0 ~'~'* "" Georgia Power a u-C A 1 kA6 - VOGTLE ELECTRIC GENERATING PLANT 0 '/N UNIT COMMON g op ggg EOP STEP DOCUMENTATION FORM O ERc e f v2-#.I REv /_ EOP 4 /7 M /-/ REV EOP WRITER A//,4 DATE [h /!f J' Ec? SECTION III E-RG STEP CAUTION e Trip all RCPs and immediately perform Steps 10 through 16 to initiate bleed and feed if either . of the following conditions exist:

a. Wide range level in any 3 SGs is less than 25%

[401 for adverse containment] with no feedwater established. O -oR-

b. PRZR pressure is equal to or greater than 2335 psig due to loss of secondary heat sink.

e Faed flow should not be re-established to any faulted SG if a non-faulted SG is available. 9 V . l l .- Georgia Power ll894-C "IH) -[ h ,, VOGTLE ELECTRIC GENERATING PLANT 0" are nae ,.o. 4l.'S/e + UNIT coman 3,y 97 g3 \ &(- l EOP STEP DOCUMENTATION FORM ) ERG # FN - /M I REV l EOP #_ /9 %3 /~l REV C) DATE f/k //q C EOP WRITER h/d b'S Yr F , c Av t c N f , ,s + L /le f G3 - ~ s J e le4e d de SECTION IJ7IBfMHB9EP re d p.t1 re p ,ce ~ o fr. to c hm-ye ,~ , ~ e t v d e J. ;a t c. + s ,cc ,f.c n iu es -e.e c/e c/ h S e c e s, d Lvlle t (.) u.ua e )c p es y .s, 4 e ~ 4 , ., c i m e, fy i+3 , s , s f e " ~/ ~ d' *~" ' < r c - O n , c c/ 6 v I l e t c- > e . d s~- ,ep,c a .. 4 O J 26 I [4-10 .

7. h GeorgiaPbwer

.o e - 7,L V0GTLE ELECTRIC GENMNG MNT 0 0 4*/*

  • uNir == ~i Ori EOP STEP DOCUMENTATION FORM ERG # M-b/ REV / EOP # / N 3/-/ REV O EOP WRITER h//A DATE S / [F3'

~ SECTION I: ERG STEP f Try To EsteMish meie FW Row Te At least One 5Ch

c. Check Condensate System - IN a. Try to place Condensate System in SERVIG service. M. THEN go to Step 9
b. Check FW isolation votves - b. Perform the following:

Om 1) Roset Si if necessary.

2) Roset FW isolation. .
3) Open FW isolation volves.

Q g no FW isolation volve con be openee. THEN go to Stoo 9.

c. Establish Main FW flow: c. Go te Steo 7.

[ Enter plant specific meens] O _ ~ 9%' , , - - - - - , , - - , - - , - - . ----.--,,,..,,,.a - -- ,----,,--------------------,,,,,,.---c 't - GeorgiaPower ~r""~ ' - N f kh .. --, 0 ~ V0GTLE ELECTRIC GENERATING PLANT '[W UNIT CO MON g og gg EOP STEP DOCUMENTATION FORM Eac # c'd2 -#. / aEv / EOP 4 /9d3/-/ aEv o EOP WRITER kl /41 DATE d!<9 /!8 J' Ec? SECTION ID ErRG STEP

5. Try To Establish Main FW To At Least One SG:
a. Check Condensate a. Place Condensate System in -

System - IN SERVICE. service. IF the Condensate System H n NOT be placed in - service, THEN go to Step 9. (J~3 b. IF SI has been actuated,

b. Check feedwater THEN go to Step 9.

isolation valves - OPEN. Perform the following:

1) Reset FW isolation.
) Verify MFRVs and BFRVs shut.
3) Open BFIVs.

Z BFIVs will not open, TiEN open MFIVs.

c. Start one Main Feed Pump by initiating 13615-1, CONDENSATE AND FEEDWATER SYSTEM.
d. Open BFRVs to establish d. Open MFRVs.

feed flow. O 4 3?31 f/2 -i -- "" GeorgiaPower 11894-c 10./ .M .. voorts stacmC GENsRATING MT "7 e n,,,,,, L Or f3 O 4/,s/ev. ,,,, EOP STEP DOCUMENTATION FORM RF-M</ - REv I EOP 4 /'7d2/-[ REV O Emo e I DATE EOP WRITER /V!M 5'S7 RIcATrcN SECTION IJJ % p_ gg3 et m cy gg/g/, f sI k-e e r << ~ c e ~m h 57 d S \/6 & D cl e s ic, ~ i cli~ y 'fb Qecoc 31 w = v I l ivu Y A e /p i ivo^'N o c c e c e el re.sefli.9 i G% A f"' fe e J w~pa41'epre. c essa.y f . sr~ , , e s h L ji c 4 , ,,>c , <3 ,9 n. d v 9 , , , p; c E' " ~ ~ "' s RR 'g,, y j, j O i ~ c iv a p ., % ~r~n,~ . _pggp;-9~~s sty ,- '/,g i 6 O AB l M191 ' ' -~'~ - - - - - - - - _ _ _ _ _ _ _ ~~**~s _ _ , , _ _ .m - - - $q) .f .& mmm en, voeu nacmc eauemma nua ~r ~ " ' O * '/* * . van c"'" t or i EOF STEP DoctMENTATION FOME -e M 231-1 o ,,o . R-H. l - = L R nr _ EOP WRITER #M _ onTE 64//w SECTION I: ERG STEP 7

  • Try Te EstabEsb Feed Flow Free Ceedemaste Systems
o. Depressurire RCS to less than ts; PSIG:
1) Check letdown - IN SERVICE 1) Use one PRZR PORV. If,g.

THEN use auxilicry spray. Go to , Stes 7b. _ -

2) Use auxiliary sprey 2) Use one PRZR PORV. -

O 6. ii ce Si si n i>=

  • Low Steemline Pressure 51
  • Low PRZR Pressure 51
c. Dooressurize of least one SG to less then (9i PSIG:
1) Menactly or loccily dumo steem
1) Dumo steem to condenser et maximum rate from SGs:
  • L + PORV.

-CR- * {~- e piant soecific meansJ. LF E NEN go to Step 9.

d. Establish condensate flow: d. Go to  : 9.

(Enter plant specific means] O , AN "i ~'~'~ " GeorgiaPower il894-C "g .g g O"' VOGTLE ELECTRIC GENERATING PLANT m o' m 4/;!je q. UNIT COMMON gopggj EOP STEP DOCUMENTATION FORM c ERG # Ef-//./ REV [_ EOP 4 [7d 3 [d REV & EOP WRITER d//4 DATE da ff Ec? SECTION ID ERG STEP

7. Try To Establish Feed Flow From The Condensate System: .
a. Depressurize RCS to less than 1920 psig:
1) Use one PRZR PORV.
1) Check Letdown - IN .

SERVICE. IF PRZR PORVs are NOT Wailable, (V) THEti use auxiliary spray, Go to Step 7b.

2) Use one "RZR FORV.
2) Use auxiliary spray.
b. Block SI signals:

a Low Steamline Pressure SI. e Low PRZR Pressure SI.

c. Finually or .ocally dump
c. Depressurize one intact s eam using SGs ARV.

SG at a time to less than 665 psig by dumping steam to the condenser IF NOT able to dump steam, at maximum rate. N EN go to Step 9.

d. Establish condensate d. Go to Step 9.

(~} O flow by initiating 13615-1, CONDENSATE AND FEEDWATER SYSTEM. .a , ;, ' ~  %- GeorgiaPbwer ll894-C "W { h . VOGTLE ELECTRIC GENERATING Pt. ANT N" O O *" unit coa nu 'go, A EOP STEP DOCUMENTATION FORM ERG # F8 - M e / RIV / EOP # / bd 3 /-/ REV O EOP WRITER ~ d//4 DATE b b // Py-sect 10n 1ys: '," '

  • 4' ! e N

,~ ciaa Ph ~ + s,~, r c c,-i~ eluded ic-, as e4 A a d r ffa d spec,fe n e >' p c~ ~' e %y E rd G . S'4 e e C~~s h+y r a7 wuce d ~1 e r ,~ve~ +c r ec (e a 9 <~ va i la h /e t~ T c s. g i O 27d r ~ GeorgiaPower ~3,1_c 1 h5 % mo on,.emm m m. 0 VOGTLE ELECTRIC GENERATING PLANT un  %. #8/eS UNIT COMMnN 1 op 1 EOP STEP DOCUMENTATION FORM ERG # f fl - /r/. I REV / EOP # [ k13 /~[ REV F EOP WRITER A)/A DATE 5!2/ I' SECTION I: ERG STEP M EstehEsh RC5 Sleed Peth:

e. Verify power to PRZR PORY block volves - AVAILABLE R'8** Po er to block volves.
b. Verify PRZR PORY block

. Open block volves, volves - ALL OPEN

c. Open all PRZR PORVs SECTION II: EOP STE_P_
12. Establish RCS Bleed Path:
a. Verify power to PRZR a. Restore power to block PORV block valves - valves.

AVAILABLE.

b. Verify PRZR PORV block b. Open all PRZR PORV block valves - ALL OPEN. valves.
c. Open all PRZR PORVs.

~ SECTION IIIs JU 'STIFICATION EGP d e s e c, ,v do e r u o f r e ci v a r e i a s 4 r n eNa,c h anece+e 9$%R 9 o n Ve. Th ece fa c e 5-/e/ 2f4conA / V ~ e r e p le e e d r -C-l e r i'N + e p a % - cl s -f e p N were re n h er a e e o e cd ~ N lv. Ybis c A r ~ce i r e r n , ss i ble by g g G s f (f e-Pe c e ~ c e is PGEp/l( b a.c k 9 eo v .v eld E E G s -t-e_ p / s c " s c h"~9ed g r . P r, D 9 -A e p l '2- ,/,,.. , _ , ' _->g .

s F  :

GeorgiaRommt 4f& m enowneneenmuer ~ + & g-^^ 'i) 0 ,-_ g- VOGTLE ELECTRtc GENERATING PLANT , 0l'0l0 $ . UNIT MN L or k 5 ^: -T$ EOP STEP DOCUMENTATION FORM ERG # F 8 -//*/ REV / EOP $ / 2d 3 /-/ REV O EOP WRITER /) /4 DATE @ /[8J' ~ SECTION I ERG STEP / /f VerNy AW RO Bleed Peth:

a. PRIR PORVs - AT LEAST TWO c. Perform the follow'mg:

Om 1) Ooen oil RCS high poim vents: [Emer piant specific list). .,

2) Depressurize of least one 'mfoct SG to atmosshenc pressure using SG PORV. l
3) Align any available low I O ar s vr =' r the depressurized SGis).

rc 'a . i l i . l ' l l O l .p -* 277 l w k&A . GeorgiaPower VOGTLE ELECTRIC GENERATING PLANT g _7;',"g_c ~ 0 0 +/< 8/e

  • unit cosmou 1 Or zz.

EOP STEP DOCUMENTATION FORM erd # F4 - M./ REv / EOP # / M 3/-/ REV O EOP WRITER Al /A DATE 6/d //8 J' Ec? SECTION ID ERG STEP l

13. Verify Adequate RCS Bleed 13. Perform the following:

Path:

a. Open Reactor Vessel , '-

e PRZR PORVs - TWO OPEN. Head Vent valves: o PRZR PORV block valves - e HV-8095A TWO OPEN. e HV-8095B e HV-8096A e HV-8096B Q' e HV-442A - e HV-442B

b. Depressurize at least one intact SG to atmospheric pressure using SG ARV.
c. Align any available low pressure water source to the depressurized SGs.

O . PC3 ' 31 ""*" ~~ .. GeorgiaPower k h. W mn ae.eumm oenman , VOGTLE ELECTRIC GENERATING PLANT 0 Y/8/0 Y UNIT CO M N OF EOP STEP DOCUMENTATION FORM ERG # M62 - M */ REV / EOP # / D 3 /-/ REV _ o EOP WRITER /)//l DATE bh W szerrow rrr: ausrrrrcATrow \/ E G P d e sf, ~ c/o e r u o f e e ci v o e e_ i iv s '+ r u n e N a , ,- h 'o ne c a+ e 9$%R 9 o R Vc. Th e< e -Po < e 3+eS2 fA cov, A / V w e r e p la e e d r -C-l e c i b+e a o % - ci s +ep s - ece re~ h,ec n c c ci , ~ 5 /v. /his c A r ~ge i s p e c .n , s s s y t e y y g g a g f '[cee-Pe c e n e e fdC /-l. I b a c k 9rovadd O . g g2 c g + e e i < ~ ~ s eh oed io 6o? S+ep G. l l O ?C3101 JPo GeorgiaPower b f [ git. Abut, nowen oe.enam> osamen , VOGTLE ELECTRIC GENERATING PLANT 0 4l:8/gy *** ] UNIT COMMON 1 0F 1 EOP STEP DOCUMENTATION FORM ERG # E82-M/ REV / EOP # 13 /~/ REV O EOP WRITER ///4 DATE  ! SECTION I: ERG STEP i 17 Meistem BC3 Nest Removel:

  • Maintain 51 flow Maintain PRZR PORVs - AT LEAST TWO OPEN O

SECTION II: EOP STEP

14. Maintain RCS Heat Removal:

e Maintain ECCS flow. e Maintain PRZR FORVs - AT LEAST TWO OPEN. SECTION III: JUSTIFICATION /E C P d - s e c, v do e r u o

  • t e ci v a r e_ i n c 4 r u n e S c~ , c l a c ae m+ e 9$%R 9 o st vc . Th e< e Sc < e 34 e p% YA ron i

/ V w e r e p la c e d n -f-le c Yh4e a o % - cl s seps Q were r e n un h e r a e e o e cl n s /v. O is c Ar ~0c i i s pe e n ,ss I ble b y 5 g G s ', '( f e -Pe c e ~ c e fdC H. / b a e k 9 ro v a dd y/ re c s + c. e i , e a s c h a <v9 e d +e EoP E + c e / Y. _ _ _ _ _ _ _ _ bjdM ** k .f . M , ll884-C ,,,, voam aseme eeniname nun r 4/is/ey " == """ '2 0 ' ' BOP STEP DOCUBENTATION FORM ERG . FR-H.1 =Ev J mop . M 231-1 .Ev o EOP WRITER h/A DATE_ b M/NI SECTION I: ERG STEP I 12 Roset $1 O . SECTION II: EOP STEP i

15. Reset SI.

SECTION III: JUSTIFICATION E6 P cl e s 9 ,v do e r u of r e ci v o r e_ i iv c 4 r u n e k c~ , e $ c p e e c.+ e 9 h % d2 9 0 K Vc. Th e< e So e e Jehb YA rovg 4 / V w e r e p {cu e e el r D e c 5Y$e p o Ya u cl s Sep s 0 were r e iv u m. h e r ae e o e cd i n e l ./ . Ib is c An~ce r is perm trsble b y 5 g G. s f ('A e-Se c e u c e Pdt H. I b a e k 9 ro e a d.) gy rse c- s +e.p i z w a s e h a ~ y e d te es e s tee ir ll894-C 4.* , (f .h .- ," , V0GTLE ELECTRIC GENERATING PLANT 0" f/.8/gg UNIT C'lWN 1 oy [ EOP STEP DOCUMENTATION FORM ga. F2-H.l .Ev sop e M al-I mEv o EOP WRITER MM DATE 5[d//ff SECTION I: ERG STEP 13 Roset Castemawat Isaisties Phase A And Phase B l I O e . - -_--_-- . l weaom. -- .' Georg.iaPower 11894-c bf b  % , o.mm,,, 0 VOGTLE ELECTRIC GENERATING PLANT un Yb 8 /S '/- 3 UNIT C0hNON  % OF7Et EOP STEP DOCUMENTATION FORM O ERG # [/2 - M. / REV / EOP # / M 3/-/ REV EOP WRITER // JM DATE d //8 f Sc? SECTION ID E-R6 STEP l l l

16. Reset Containment Isolation Phase A:
a. Check containment area radiation monitors -

LESS THAN (3) R/HR: e RE-0005A e RE-0005B e RE-0006A e RE-0006B

b. Reset containment isolation phase A as radiation monitors if- l necessary. ,
c. Reset containment isolation phase A.

m ',, GeorgiaPower T,1_c kl 5 k& h u. menoe.eu a aan men m , VOGTLE ELECTRIC GENERATING PLANT 0 m m. g Y//8/B S UNIT COW 40N . POF EOP STEP DOCUMENTATION FORM O ERG # [8- M / REV / EOP # [E 1.3 / -/ REV EOP WRITER f/[M DATE _ k 2/k J l SECTICA1 III: JUSTIFICATION EG P d e s <e,,v d o e .c u o f e e q uir e i ns 4r un e Sa , c h o pe c a+ e  ? $ %-R P o st Vc . Th e< e. fo r e 3-feNO YA~gA / V ~ e r e p le. c e el 6. f4e r 554e p u % u ct s -f e.p s were c e n un k e r a e e o ,- cdi n N / v. 1 bis c A r ~9e ~ i s pe c n.ss i ble b y 5 g G s ', '[g e-Pe c e ~ c & fdH./baek 9 co v a d.) C h wye % E d 9 s+ep ic P ha s e 's i s e Mn ~ - c- s ele /e+i a ec c - v scp degipa. j l l 703?C1 d assuem meanws. GeorgiaPower - use-c  ! 'M[ /G8/su ,o.,seenman eenmen  %. , VOGTLE ELECTRIC GENERATING PLANT 0 ** 2 4l8 /'0 Y UNIT comenN 1 op g V, EOP STEP DOCUMENTATION FORM 1 1 O ERG # 84 ~ 8' / REV / EOP # / 9.2 3 /- / REv EOP WRITER A//A DATE _ 6 b /[ff ~ SECTION I: ERG STEP EOP STEP DOCUMENTATION FORM Eno e ':2- H. l mEv EOP e ,'Cl 231-1 mEv EOP WRITER DATE i SECTION I: ERG STEP Start one air compressor and 14 Establish lastrument Air To establisn instrument air to containment. / "" ~ ' = ~ ~~ GeorgiaPower ll894-C "g .f g , VOGTLE ELECTRIC GENERATING PLANT o Y/d/B Y UNIT COMMON oph EOP STEP DOCUMENTATION FORM EOP # / D 3 /-/ o ERG # MM/ REV / REv , EOP WRITER h/4 DATE d[8/[8J Ec? SECTION III EM STEP

17. Establish Instrument Air To Containment:
a. Verify instrument air pressure - NORMAL.
a. Start one air compressor by initiating 13710-1, SERVICE AIR SYSTEM, Section 4.1 Service Air .
b. Open instrument air to
  • containment isolation valve:

e HV-9378 1 O . m. 227 l Georgia Power 7,1_c h f IdAtu. m. ao ums.o.umen  %, , VOGTLE ELECTRIC GENERATING PLANT 0 Y/*'8/0 Y UNIT C0f440N op h EOP STEP DOCUMENTATION FORM ERG # F 4 - M,/ REV / EOP # /7) 3 /-/ REV { EOP WRITER h /M DATE ((8/[fI sucTzOu rzzi ausTrricATroN \/ E C P cl e s e e, ~ c/o e r u o

  • t e ci v or e i u s 4 r u n e N w , e So o p e e r+ e 9$%R 9 o n Vc. Th ec e -f'o c e Ske% fAcon4

/ V ~ e r e p la e e el r f4e c 5b-f e p u % u cl s +eps were ce nun k ec a e e o e cd i n N / v.1 bis c Ar~se i s pe r n.rs t ble b y s m a s f '(de-Pe - e ~ c e fdC H.I b a e k 9covad,) = ,. Q h r ~ y edh E GP S+e(p r7 O m,=, GeorgiaPower "TJ,"_c w 1 ksM e-- . ,,, voorts atacmc enweamwo nur o .e. .e 4/s8/W UNIT crueIDN 1 OF 1 EOP STEP DOCUMENTATION FORM Ema e 'Q-fl.l EEv l SOP e M 231-1 mEv o - EOP WRITER /{l/4 DATE 6[,1/[ [(f l SECTION I: ERG STEP 18 Castisse Attempts To Establish  !+;;ig Nest Sisk is At Leest One SG:

  • AFW flow
  • Main FW flow 1

. Condensate flow _ __

  • Other low pressure flow

-l SECTION II: EOP STEP

18. Continue Attempts To Establish Secondary Heat Sink In At Least One SG:

i . j e AFW flow. e Main FW flow. e Condensate flow. SECTION III: JUSTIFICATION Y b u [ /cd . N0 oi kee dw lD r c) ssuee lOw G Yr SY T, py =>e. r AMIIOvak ~ ~ - Georg.aPower 11094-C

7G . 7 % ,

, , - VOGTLE ELECTRIC GENERATING PLANT o M[#S/0 Y 1 Ov UNIT C0f440N 1 OFW EOP STEP DOCUMENTATION FORM ERG # [82 "M / REV [ EOP # / 2 d 3 /-/ REV O EOP WRITER [//d DATE S/ 8 / bI / SECTION I: ERG STEP o Co rr25 pew IN} L= R G- Na\E O - SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment C. l O . M) '~ GeorgiaPower qq.c i to f h .- _ == . VOGTLE ELECTRIC GENERATING PLANT 0 g v 4/'f/B % UNIT COMMON [0F EOP STEP DOCUMENTATION FORM Eac e Feew,/ aEv / EOP * / F A 3 /-/ aEv o EOP WRITER O/ DATE G l[ 5 S 7~, >= t c A r e e N SECTION IJ7 MP \l E'G P d , ' ' 9 ~ 'I e o = a n ,. A je *'r cc- p r e s s c ,. t ' ' -~ C r tE: %t r e .w q 7 Y'~*' ** PP ly. d h ~ r 9 i ~3 h/e wy ~ ~ ',* " N e o I v a- ( v e s e ce ci v . c n ~. a,c gyppy ,4,, *' Nhe'c c.pe r d ian, S u c ~ .s e n s e,e = + zi u c , -+ 2 se O p o s s i al, -C=. ~ e-er cc,wprur icf- .w c, ~ f e d . Y L e u t to- p l e a l i e c n, %4 m ethe e c +' etvce /c. 6 / e, a n, ,s n we *ssecp as42 hl.s b ,~.3 e ha cy i~k 3 .s ' '~c L cl= J e.-+ ~ H e n, m e c. ~ . i h,, v M T-[ c e h ,w ew bC / O '33'01 AP/ ~ F u1 % b h8 e-- 9)-c su MTLE RECWWC GENERATWNB PLANT 0 4/t8/64 UNTT CSEEli _ 1 OF (, O EDP STEP DOCUMENTATION FORN

a. FR-H.l ==v J .o, . M231-1 .sv o -

EOP WRITER M/A naTz _ (o A // r )' SECTION I ERG STEP 25 letabEsk /14/ GPM Oerying Flow:

a. Gese charging line flow ControlVSive
b. Open charging line hand comrol volve ,
c. Open charging line isolation volves .

~ ~- ' -

d. Establish ties GPM charging .

flow using flow control O >- O \ p '~' -- Georgia Power '* '~' ~a ll894-C v ." Q .f .M4 P0wEm OENERATICN CE*ARTWENT o,1, VOGTLE ELECTRIC GENERATING PLANT '0" ' 8 AGE NO Y/*i/E Y UNIT COMMON QI OF gZJ EOP STEP DOCUMENTATION FORM ERG # [f2 - M. / REV / EOP 4 [ 7 2'3 /~/ REV d EOP WRITER A/ / A DATE d 7 I Ec? SECTION ID E-tW STEP

25. Establish. Charging Flow:
a. Open CCP normal a. Go to Step 25c.

miniflow isolation ' valves.

b. Shut CCP alternate miniflow valves.

O c. Shut seal injection flow control valve HV-182.*

d. Open charging line isolation valves:

o HV-8105 o HV-8106

e. Shut BIT isolation valves.

\ ll95 . ~ w.7.m GeorgiaPower m enosnemanonoss n eur 34_C , N* oare VOGTLE ELECTRIC GENERATING PLANT 0 +/:S/e + cosanu O unit 4- Or-g>-y-EOP STEP DOCUMENTATION FORM Eno e /rv2 - y . / any / EOp , / 7p 7 /_/ azy o EOP WRITER // /M DATE _ d[d /((3' $s' G T~r P I C AT I O N SECTION IJIINP e [ $ & 3 $e p 2 $~ waS N e_ f a , V E G- e d e s iy ~ el e, e > av o4 h a v e . % ekzry,~y li iv e het ~.el a a n'+ r a l vulve, G /T t s-e f e +i w l C C .P w ts f u e /v d e cI heee h P r <a v e - P /* ~ Y s ' *c#l' " " I" " ' " e rv~ov f. # '~ ~' / N c fu cl e cf 'W0 '"* ' fm,(,c , g ,1< o r - .._ / co P- .- U ~ . vc tve s . O F33 tot ~ ~ ~ ~ ~ GeorgiaPower ll894-C Q .7 , g , , VOGTLE ELECTRIC GENERATING PLANT 0"  !' !0Y UNIT COMMON 1 OF fy EOP STEP DOCUMENTATION FORM ERG # F8 -M * / REV [ EOP 4 / 7.2-3 /-/ REV D EOP WRITER DATE 6 hI SECTION I: ERG STEP \ ^' flo TE RcocreSfdu C A '\ i " tb - *} ~ \ SECTION II: EOP STEP Sqq h c. c b e e a C_ q u e lv ded SECTION III: JUSTIFICATION N C [vc[e /N )/6 A C plaei~s , ~ R : n do w eS 54e.o 2r S e. e t0 0+ e bef oc e S + e. p 2r-Ac- 'a - g + i fi e ~ L ~. O m ... , E PROCEDURE NO. REVISION 19231-1 0 PAGE NO~ - 21 of 23 Sheet 1 of 3 ATTACHMENT C ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one.CCP - RUNNING.
3. Verify charging isolation valves - OPEN: .

e HV-8105 e HV-8106

4. Verify BIT isolation valves - SHUT:

s ('~'J e HV-8801A e HV-8801B e HV-8803A e HV-8803B

5. Dispatch local operators to do the following:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-1
c. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 O
d. Adjust TO #1 SEAL: to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS e

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) , e 1208-U4-416(RCP #3) 1208-U4-417(RCP #4)

e. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

O M ,_ ~m .. PROCEDURE NO. REVISION 19231-1 PAGE NO. -' 0 22 of 23 ll) - Sheet 2 of 3 ATTACHMENT C (Cont'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify OPEN. Train A alternate miniflow isolation valve HV-8508A -
2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valva HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 IN

() e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTL

f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE

~ VLVS TO #1 SEAL: e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e e 1208-U4-416(RCP #3) 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

O v e ,s PROCEDURE NO. REVISION 19231-1 0 PAGE No. -, 23 of 23 i (]) # ~ - l Sheet 3 of 3 ATTACHMENT C (Cont'd.) C. Establish Charging With Train B Emergency Bus Energized

1. OPEN.

Verify Train B alternate miniflow isolation valve HV 8 -

2. Verify Train B CCP - RUNNING. >
3. Verify Train B charging isolation valve HV-8105 - OPEN .
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

5. Dispatch local operators to do the following: '
a. Verify Train'A BIT isolation valves - SHUT e HV-8801A e HV-8803A

(]) '

b. Verify Train A charging isolacion valve HV-8106 - SHUT
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-18 .
d. Shut 1208-U4-134 CVCS SEALS FLOW C
e. Shut 1208-U4-135 CVCS SEALS FLOW CO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLV TO #1 SEAL:

e e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

END OF ATTACHMENT C O JW GeorgiaPower ~~ kl f V< t h u . , _ o no,, ao.m.a $'," , VOGTLE ELECTRIC GENERATING PLANT 0 O 98/e* :eNiT co- * *1 0, 1 EOP STEP DOCUMENTATION FORM ERG # Eh - N.2 REV EOP # $ 7.31 --l REV _ O EOP WRITER ///4 DATE bf  ! SECTION I: ERG STEP 2 Verify FW isoisties Te Affected Manually close volves. 3G(s):

a. Row control volves - CLOSED .
b. Row control bypass volves - -

CLOSED '

c. FW isolation volves - CLOSED -

O SECTION II: EOP STEP

2. Verify FW Isolation To 2. Manually shut valves.

Affected SGs:

a. MFIVs - SHUT.

IF valves can NOT be shut, THEN dispatch operator to locally shut valves,

b. BFIVs - SHUT.

SECTION III: JUSTIFICATION N o r h c- m E X PG N O E s +e o L cla<,4 ih i & J. Co~ hoi nlm ee <A :1oll n u ver I,u, w ; oc w ana s n u a a av a sa s,, n e r O n . P03101 3sz s J ~? GeorgiaPbwer ~yl,* _c to 1 m _ e. - - __ , VOGTLE ELECTRIC GENERATING PLANT 0 4/18/SS . UNIT COM40N 1 op.[ EOP STEP DOCUMENTATION FORM ERG # h \1 .l REV I EOP # $14l'I REV b EOP WRITER M[h DATE $!WT[ SECTION I: ERG STEP 7 Roset Contain:nent isolwien Phase A And Phase 8 e

  • s

""** ~~~ . GeorgiaPower W5 kW -,_.- l*," VOGTLE ELECTRIC GENERATING PLANT 0 l ,, 1 * ** 2- 3 4l;&jeq. UNIT COMMON E OF pt'C l i i EOP STEP DOCUMENTATION FORM /22 V/-/ O ERG # I8 - F / REV / EOP # REV EOP WRITER d//M DATE $[A//Tf~ _ Ec? > SECTION ID ERG STEP

7. Reset Containment Isolation Phase A:
a. Check containment area radiation monitors -

LESS THAN (3) R/HR: . e RE-0005A ' e RE-0005B e RE-0006A e RE-0006B

b. Reset containment isolation phase A radiation monitors if necessary.
c. Reset containment isolation phase A.

4 3 ,:r 2, - imem --- GeorgiaPower ll894-C b m a. , VOGTLE ELECTRIC GENERATING PLANT 0 mn 4/es/ee ' UNIT _CDff0fL *"[ 1 EOP STEP DOCUMENTATION FORM ERG # FE- P,/ Rsv / EOP # / 72 V/-/ REV O EOP WRITER M/A DATE _ [ M /[ff @ '5 7~, F i c AT / c u SECTION IJJJ hp ' cle le+ed Phase /3 ap./dnu ~,~s -P e c ~ \l /FG ? desig~, n e +Ph  % ds~ t-en.s ,,n c , A c a y u , c a ~ n A .c ~~d / ~ c Is d e d, e m W F@Q t J ' " '" ~~ ' Geo7,ia Pbwer "*" tv.F k&hu -__ . , VOGTLE ELECTRIC GENERATING PLANT 0 ~ * ~ 0 #/'8/*

  • unit comanu 1 Ore EOP STEP DOCUMENTATION FORM ERG # # #2 - P. / REV / EOP # / 72 V/-/ REV O EOP WRITER M /4 DATE [/A/ / N SECTION I: ERG STEP f0 C o ['r~ R S p O M Y

.N 5 geG 5 + e p. n NJ SECTION II: EOP STEP NOTE Without instrument air available charging should be established using Attachment B. SECTION III: JUSTIFICATION See 2 v rn,=,cn n a 3 a c /s cl e c! O 703131 364

  • GeorgiaPbwer --

ll894-C 7  % .[ .Q ,, ' VOGTLE ELECTRIC GENERATING PLANT O O +/d/e + unit c- 'A,3 EOP STEP DOCUMENTATION FORM ERG $ F/7 O,/ REV / EOP $ O c7 V / - / REV O EOP WRITER A//4 DATE [ d[/7[ E' S T, A: I c A r / c N SECTION IJ7: see-gesP d

  • S / p iv c[ c e  : g o T , .v t.k e

*'r ccm pressar P'- e r e d d'cc.s  % -pg / E g & Pc- e e se ppl y, c<jm,7, va(ves r e n.ce m ., c,c s y g f.y 9 *rd ~/ S u c ~ w, e ,4<,. 5he'r c. Pere % w. Q 3 3 sS / a[e e ,- Ib 's frc ee'dv.c 'a b .. Ic' p l e ,m e n k e ) $bcuf ~L tr ce.,+.;3ruc [c., - /c. h /e, a n, s lier ~<.3 es etL.d c -f etvar is n ee+ss~cp m s h k l.s b , ~3 e h a cy i~ 3 ' s '~c L ded -- e. -+ k c <- 'T h , , ~ H e , nr o e b Id tv /4 t/ c e h ,, e w O  ! 1 h '33'91 ~ ~ .. GeorgiaPbwer 7 g'"c i+ km _-- __ 0 ,, VOGTLE ELECTRIC GENERATING PLANT 4/t8/BS , _ UNIT CO M N 1 OF EOP STEP DOCUMENTATION FORM ERG # N_- h, l REV f EOP # } 92.4 l -l REV O EOP WRITER bl 4 DATE  ! f SECTION I: ERG STEP 10 Estsblish <91 GPM Chert ali Flows

c. Case energing line flow control valve
b. Ocen energing line hone centrol volve
. Ocen :n=rg:cg line isciation vaives
. Est::iisn <9i GPM cnerging flow using flow ::nrsi veive .

O . O 1 iWQt - ~ ~ ~ ~ ~ GeorgiaPbwer g,7 11894-C , VOGTLE ELECTRIC GENERATING PLANT 0 O 4/8/eg COMMON aa

  • 2_ 2

(/ . UNIT 4 opg EOP STEP DOCUMENTATION FORM ERG # f/2 - /0, / REV / EOP # / / 2 Y/-/ REV O EOP WRITER dl/A DATE / [I Ec? SECTION ID E4M STEP

10. Establish Charging Flow:
a. Open CCP normal a.t:Go to Step 10c.

miniflow isolation ' valves.

b. Shut CCP alternate miniflow valves. -

P;

c. Shut seal injection flow control valve HV-182.
d. Open charging line isolation valve:

e HV-8105 e HV-8106

e. Shut BIT isolation valves.

O 'C 3 4

  • 76 7

woova ~~ GeorgiaPower ll894-C  ! I) f k d , _ om VOGTLE ELECTRIC GENERATING PLANT "f UNIT COMON OF EOP STEP DOCUMENTATION FORM  ! ERG # /~ff - l'. / REV I EOP # _/ 9 2- V/-/ REV O EOP WRITER f(//d DATE [ h /{f* E'STiFicAvicN SECTION IfJt Bee-gesP /Qhwa .s-cle le 1' e d. V GG P cle s /p u b a ~ d' clo e s ~ d 4a . ~ e h a c y ~y li w e s eo~+<ot y _ ( ge . ser <,o/. 6. ~ ' /~c /v de 4 bece % pceva~i E retv' o a s i ~ c /v el e d i~case& r u n e v9 , O g ,f ,. , _p e e p -c__t ., , - , D e - v a l u e .s . O 3M x ' ' ^. . GeorgiaPower T ;;_c Wf k&hu. - ~ ~ ~ ,s,,,e,, . VOGTLE ELECTRIC GENERATING PLANT 0 == @8/e4 , UNIT CfMON 1 op } EOP STEP DOCUMENTATION FORM ERc e FR- P. I REv I EOP e R14H _ aw 0 EOP WRITER b/ fb DATE __ ((A((T[/ l l l SECTION I: ERG STEP I 14 Isolete All 51 Acesselsters: I

c. Check power to isolation volves - c. Restore power to isoiction voives.

AVAILABLc

b. Close oil 51 c::umulator isolction b. Vent any unisoicted c::vmuictor.

volves l I 1 'iri,*.c GeorgiaPower ey a _ . - - _. oui VOGTLE ELECTRIC GENERATING PLANT 0 404 % L Y/38/BS . UNIT COMMON + op EOP STEP DOCUMENTATION FORM ERG $ [R- P. f REV / EOP # I 9 S//~/ REV F EOP WRITER d//d DATE g/8[f f Ec? SECTION II) ERG STEP i j l

14. Isolate All SI 14. Vent any non-isolable i Accumulators. accumulators:
a. Verify'N supply valve 2

HV-880 - shut. , e

b. Open accumulator vent valves.
c. Open common vent valves HV-943A or B.

*MM 4 em 'CJ ' 01 mamm -- GeorgiaPbwer ll894-C '- 'N f M ., o"* a ru VOGTLE ELECTRIC CENERATIN3 PLANT Y/!8/B4 UNIT Col 440N 47 OF g3 EOP STEP DOCUMENTATION FORM ERG # F P. ~P.1 REv I EO, , ict gqi _ g agy o EOP WRITER /I/ /d DATE ( /1l [9 Q 5 'S Yo PI c A'n-1c N SECTION III: M P fbR lN G bL o b ' ,5 S N p (S b b e. de ~ e ra y c dless . -f & .n e tsen Ja ~it ic n e t a ct , a cayv,c used. Opec~%, ee avq t /cb,b4y-h><solc+<m a -@ p o va.lves. . s am 3# < 703toi "" ~~~ GeorgiaPower '.- to f M h u _-- VOGTLE ELECTRIC GENERATING PtiNT l',' "*0 m "*** z 4l:8/e + V UNIT COMMON 1 OF F EOP STEP DOCUMENTATION FORM , ERG # [8-[. / REV / EOP # / c) k[ REV O l EOP WRITER dl/M DATE / f/Nf SECTION I: ERG STEP D dorre3pggd m i ERG m. e O . SECTION II: EOP STEP NOTE Without instrument air available makeup to VCT is not available. l SECTION III: JUSTIFICATION S'e a T U S T I l= i CRTron a ~ c luJe J ~ O 3M2 l +w- ,- -- - - - - -s- g-- - ,, - , ,,

  • GeorgiaPower 7N,*_c

.- N 5.% ,om mn. m = om VOGTLE ELECTRIC GENERATING PLANT 0 O * */S S unir coaao" PAGE % g +or e L EOP STEP DOCUMENTATION FORM ERG # MA - 8e / REV EOP # [ 7 O V/ -/ REV C _ EOP WRITER b /M DATE__  ! [T 7 Tw S 7 , / i c A t-/ c N SECTION IJ7:HP \lEGP cd e s ,7 y c/ c e s ,v o t , ~ t /m de cc~ Pressar p -e ef fc c .w ~ /Eb& Pe- e r s' pp l y, \1 cT - k o g -F/c m syppyl (c a-fce [ va.(v e s r e ej v , ,- e su aic =c +besc c.p e r di a n. S u c a us e i4ts possiale - C ;. ,- T h s e,e e e d u ce -% b -: Ybec ~ C- / e' c e r w ;7 t +7 ic g.e p /e ,m e a k e d G R / [tf'j The o (J e r a b e iS mAde c<. m a c e o f c. p o r r , h Ie lo r r o fCCP seucee, s c c ri a ~ 703101 38 ~" ~~~ GeorgiaPower ll894-C , 10 [ .h .- VOGTLE ELECTRIC GENERATING PtjNT O' Yb8/0Y UNIT COMON 1 OF EOP STEP DOCUMENTATION FORM ERG # 88 - O. / ,REV [ EOP # / hO N/"/ REV O EOP WRITER klIM DATE k o//ff SECTION I: ERG STEP Q C0(reS70M YIN} /E R G S4 ee. O SECTION II: EOP STEP NOTE Without instrument air available letdown should be established using Attachment C. SECTION III: JUSTIFICATION be 3 U STt F ic f / /0 et x ~ e /u d e J. ~ O PC3to t 3M assuomi, ~- GeorgiaPower 11894-C bf M ' - VOGTLE ELECTRIC GENERATING PLANT 0 am  !' !0 Y COMMON UNIT 0FM EOP STEP DOCUMENTATION FORM ERG # M - M./ REV [ Eop p /F) f/-/ Rv O EOP WRITER 6/ JA DATE [b/[Tf $ 5 Yo R I C Rit c N SECTION IfJ M p '\l E G P e4 e s /p ~ c-( c e s a c t , ~ t /m ee - l G /F CCM pit i5oe c ,,, , p;g r c .w A l f e a a e , - e .- sm gel y. /_. e s ~ ~ f4e l c~c a 4 c c ( y a. t v e , r e y u.cn ~ .- a.c s u a p lY cc +he,c c.p e c dt a v. S e c " us e t 'f t s ' _ v '~ e ** b= O p , g g i ,(, -C= c T1, 's ere ev' ,.,. le.e~1,ed Tp'f ~cfr c <_ ,w p r +T.rce s 14 e c e, ~4 m e T k c O c N-c1 v a e la ble, a ~ y e c + s s a r y- *** '3 q; 5 4q N3 l ' 5 h u ~ 8 l2k - jv jeoj / i 'S < / ^' c ^U h,s g ,. g, qN (c' .M C ' I e C- ,, ja n,c. c h-e-O m.,,, TLC 1 GeorgiaPower ~g_c 1 h f l$Azu. m ae mm o.~~ea _ , VOGTLE ELECTRIC GENERATING PLINT 0 ) */#S[W UNIT COMMON 1 OF 1 EOP STEP DOCUMENTATION FORM EaG # /# /2 - A / aEv / EOP , / 7p V/-/ aEv Q EOP WRITER b/A DATE ((TT SECTION I: ERG STEP fo c. o rr e J f oiv <w} r res s +e p . l O . SECTION II: EOP STEP CAUTION Without instrument air available CCP suction should remain aligned to RWST. SECTION III: JUSTIFICATION d e o Io , o r - / [! N o 8 a va i /a 4 /e , -f2 i ~ s fr a n c .d a i e <s ~c+ a r c, , / c. 4 /e . T h e e C c e ~ oc? s u c. , < c ~ .so v c e. e n ~ v, 6e v ~ a v ai k A le g . . Pc3'ot 3/4 ^ ~ ~~~ . GeorgiaPbwer ll894-C ., ,$ -[ - Q , , , ,,, VOGTLE ELECTalC GENERATING PLINT 0" =os e 4/;8/eg UNIT COMMON 1 OF gy EOP STEP DOCUMENTATION FORM l ERG # F4 - P. / Rzy / EOp , / 9 2 V/-/ Rzv _ e EOP WRITER d///} DATE ([E !/Tf SECTION I: ERG STEP fo CorreSfaN IN egg A%c hA SECTION II: EOP STEP {q q fxe ** i a e t d a el. SECTION III: JUSTIFICATION N c [o P /N  !'E. w 0 s' + e m /o ,o l a. e , ~ s, , A c - ~% ~ e~ Soe d V ST( f i c MT/a w a -f N O T E^ hof oc e S % /e . - '. l' PROCEDU,.E NO. REVISION 19241-1-1 0 PAGE NO. 16 of 20 O Sheet 1 of 3 ATTACHMENT B ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency B Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106

4. Verify BIT isolation valves - SHUT:

e HV-8801A e HV-8801B e HV-8803A e HV-8803B

5. Dispatch local operators to do the fol:owing:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPA
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTRO
c. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL H
d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS To #1 SEAL:

e e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) -- 1208-U4-417(RCP #4)

e. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

0 EDURE NO. REVISION PAGE No. 19241-1 0 17 of 20 Sheet 2 of 3 N, ATTACHMENT B (Cent'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN. '
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS,
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO.
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO.
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS To il SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416~(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging fl.ow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

I x - .-. . . _ _ - - . - . .--- - - - .- ~ de?-vr .o PROCEDURE NO. REVISION * . PAGE No. 19241-1 0 18 of 20 Sheet 3 of 3 g 4lI ATTACKMENT B (Cont'd.) C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Irain B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT e HV-8801A e HV-8803A
b. Verify Train A charging isolation valve HV-8106 - SHUT O
c. Open 1208-U4-136 CVCS SEALS FLOW CO:; TROL HV-181 BYPASS.
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO.
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO.
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS

_ SEALS FLOW CONTROL HV-181 BYPASS. END OF ATTACHMENT B 0 J ~ ~~ ,- GeorgiaPower

10 hkdau - _ _

VOGTLE ELECTRIC GENERATING PLANT i* * ** 0 "u n 4/;8/eg , UNIT CO M N 1 OFEQ EOP STEP DOCUMENTATION FORM ERG # 8IE'+ P./ REv / EOP e /fd V/-/ REv C EOP WRITER h/A DATE /d /Nf SECTION I: ERG STEP fo c. O ( c e _S G O m NIN (; R Q hYe c kno W SECTION II: EOP STEP [g q q c + Gt a C \ , y c /v de d SECTION III: JLSTIFICATION [rv c [v e ~ /F" e 3 + k.s pl~ c,~ , ~ Sc < - n ~ c e . ~ eO Sh o / Fr 3eo T V S Tl F / c AT/ a u (4 DTh 6 e S, c e s+eot? l f PC3'01 # PROCEDU9E NO. REVISION PA~aE NO. A Q > 19241-1 0 JI of 20 Sheet 1 of 1 ATTACHMENT C ESTABLISH SAFETY GRADE LETDOWN CAUTION The PRT may rupture while performing safety grade letdown.

1. Open Reactor Vessel Head Vent isolation valves:

e HV-8095A - e HV-8096A e HV-8095B .' HV-8096B e _

2. Open Reactor Vessel Head Vent flow control valves to obtain desired letdown flow:

e HV-442A e HV-442B END OF ATTACHMENT C l I 3 22 I ~' ~ ~~ - -. GeorgiaPower + bf b

  • nowen esmanon oeumsorr 0

V0GTLE ELECTRIC GENERATING PLANT onri [ [U , UNIT CMit 1 orh EOP STEP DOCUMENTATION FORM ERG # FA- 2.I REV / EOP # [7) T/-/ REV C j EOP WRITER ///4 DATE A//77 1 SECTION I: ERG STEP I 3 Check if Caetainment Spewy is RW:

a. Containment pressure - HAS o. Go to Step 4.

INCREASED TO GREATER THAN /// PSIG

b. Verify spray pumps - RUNNING b. Start spray pumps.
c. Verify spray system volve alignment - c. Manually align valves as necessary'."

PROPER EMERGENCY ALIGNMENT . [ Enter plant specific list for injection and recirculation phases)

d. Verify containment isolation Phase 8 d. Manually close valves.

volves - CLOSED l . m W 1 l l 323 ~ l GeorgiaPower . bf b nowen es euros osum.ent ~ , VOGTLE ELECTRIC GENERATING PLANT 0 4l:9lt y '*'* UNIT COMMOL M op grg EOP STEP DOCUMENTATION FORM ~ ERG # -- -D l REV \ EOP # 14 ^mT)-\ REV O EOP WRITER h [O DATE [ / ll M <' Ec? SECTION ID E4Mi STEP l'

3. Check If Containment Spray Is Required: l
a. Containment pressure - a. Go to Step 8.

HAS RISEN TO GREATER THAN 22 PSIG.

b. Verify Containment .b. Manually actuate Spray - ACTUATED. Containment Spray.
c. Verify containment spray c. Manually start pumps.

pumps - RUNNING. G e G 32p' 7C3131 ~ ~~ . GeorgiaPower ll894-C $) .f . g , VOGTLE ELECTRIC GENERATIN3 PLANT o , = 4/ S/e v. UNIT COM40N M OF M  ! EOP STEP DOCUMENTATION FORM ERG # FA-P.I aEv i EOP # io as) aEv o EOP WRITER M/A DATE ( /S l / t C ' '# ' C AT / c N i SECTION Ify; p y ecp d a s,) ~ Woes iv of use l 9 & I 3 o f c,._Y t c ,y ~ [p c ~ v vu N e l'o-y e d b e c; lCe d i n $/g p Q /S If N ~e M Y el e  % bc a~k-o j e kz ny ' 3a R ue - > < s I

  • F s.

d M eDe r l 0 b ~ ~~ GeorgiaPbwer ~ ll894-c 70 .[ .% .- , VOGTLE ELECTRIC GENERATING PLANT 0" ~ O +/'8/e S .. . unit co ann 1 c,5 1 . EOP STEP DOCUMENTATION FORM i l l ERG # FR D,/ REV / EOP $ / D 37'/ REV O l l EOP WRITER DATE 6/A/[Pf SECTION I: ERG STEP 7 Cheek Nydrogee Cenesefreties:

a. Current hydrogen concentration o. Obtain c hy& ogen concentration l measurement - AVAILA8tf measurement: ,

(Enter plant specific means): ~ . Continue with Step 11. WHEN [  ! hydrogen concentration measurement l available, THEN do Step 7b.

b. Hydrogen concentration - LESS THAN O 6.0% IN ORY AIR
b. Go to Step 8.  !
c. Hydrogen concentration - LESS THAN c. Turn on hydrogen recombiner system.

0.5% IN ORY AIR

d. Go to Step 11 o

O ~' ~ ' GeorgiaPower ~'~'~ N f /Qf//hu a, o.,,..,,o., o.- 11894-c , VOGTLE ELECTRIC GENERATING PLANT 0 4l:9lb y. "*** (} UNlT CnHNnN az og gg,) EOP STEP DOCUMENTATION FORM ERG # [&b ( l RIV / EOP # [EdJ /~[ ~ REV O EOP WRITER M/A DATE $!d / fI'~ / Ec? SECTION II) BR6 STEP

12. Check Hydrogen Concentration:
a. Current hydrogen a. Obtain a hydrogen -

concentration concentration measurement. measurement - AVAILABLE.

  • WHEN hydrogen concentration measurement available, THEN do Step 12b.

Continue with Step 15. O b. Hydrogen concentration - b. Go to Step 13. LESS THAN 4.0% IN DRY AIR.

c. Hydrogen concentration - c. Start one hydrogen

~ LESS THAN 0.5% IN DRY AIR. recombiner system by initiating 13130-1,. POST ACCIDENT HYDROGEN CONTROL SYSTEM.

d. Go to Step 14. .

O . l ?C3tQt 32 7 ~ -- .. GeorgiaPbwer ll894-C > b f'M m ,, - a - _ m VOGTLE ELECTRIC GENERATING PLANT 0 '! UNIT COMON OF EOP STEP DOCUMENTATION FORM ERG # #12- D , / REV / EOP # /9 O T/-/ REV Q_ EOP WRITER N//O DATE $ / 2 l/If Tw'n Ti F i C AT/ c N SECTION IJJ.* mP Y Speeo See ma+kaj o 4 o Q a ,a , ~ f,-f, o+% , W ~ e . . + ,., t de,,/ ped, ll2. -ec-suce.~.- , , ~ d . c . 4 , ~ , A a -. -e+ be e~ ec recc~ k ' ~ ~' . b P l e ~ + s p u . A ' A ! $y, zi ~ g l e c.a+ d . -2 <~c;ye * ' ~ O, ,~ s e c e, c e dy e c e y v ' ~ . oe,,~+., k~ ~ l - e. s clve % VEc-P s e - 4 2 0 . n \ , c<haaye ia l aes,,~. M2 r e w & . ~e es -en e h a ~y e due % c:e,  % 5%e s- - \/ E' G P 2 p e e ,-l. e r e 7 v o c e. n e .a +s . O 3N J , i E 9)-C  ; [N ?- m eenwon eemmen m, , V0GTLE ELECTRIC GENERATING Pt. ANT 0 Y/'8/0 Y UNIT COM40N 1 org EOP STEP DOCUMENTATION FORM ERG $ 88E 'I. / REV / EOP # / 79 6 /"/ REV O EOP WRITER M/A DATE ([/f/ff SECTION I: ERG STEP [\lo o c c c - s e:~ d .~ y gec s + c e. I ~. O .e . :- ~ ' = ~ ~ Georgia Power

u 1 kW - . . ~ ~ $*"~~*

o VOGTLE ELECTRIC GENERATING PLANT Y/iS/BY UNIT COMMON p EOP STEP DOCUMENTATION FORM ERo e p~/2 -J. / REV / EOP 4 / d[/-/ REV b EOP WRITER // /A DATE 6!N!T Ec? SECTION III ERG STEP Establish Excess Letdown By 2. Establish Safety Grade ,

2. Letdown:

Initiating 13008-1, CVCS EXCESS LETDOWN.

a. Open reactor vessel head vent isolation valves: ,

e HV-8095A e HV-8096A ' e HV-8095B e HV-8096B .b. Open reactor vessel head vent throttle ~ valves as required to obtain 90 gpm letdown flow: e HV-442A e HV-442B

c. Continue safety grade letdown until ANY of the following occurs:

e PRZR level - LESS THAN 92%. ~ -OR-e PRT pressure - CREATER THAN 80 PSIG. -OR-e PRT level - GREATER THAN 90%.

d. Isolate safety grade letdown.

8 - 7 . *: m "" GeorgiaPower ~{t;'i;_c Di [ /((IllJv., news = osaeaanon es**arweat .ni o,, ,,o 0 -~ VOGTLE ELECTRIC GENERATING PLANT COMMON 1 or gg,, YbSYD Y UNIT EOP STEP DOCUMENTATION FORM b- \ REV k, EOP # I%N-k C REV O ERG # EOP WRITER M/h DATE b[l9 [4 $ Ec? J H & 4'. f' E S 4 O O SECTION Iftl m 3- g - c tees: l e 4 J <. ~ ~ is e cefecc e J h e 4 y ycms f j a cc e t h e cl . ,, syep /~,+ c e s c ct, n .: o n ly v s e d m s = e~ ke a ud cl e y ~strec h -, p ro n le+ d ~ a.  % se s,4&+y pr a ele , gn O G 33/ 7-- -" ~'~'* Geo'mia O Power ll894-C g .; gM

  • 80Wim OENERADON CEPMm6GMT

, VOGTLE ELECTRIC GENERATING PLANT 0 Y/*'S/W UNIT COMMON 1OFIf EOP STEP DOCUMENTATION FORM ERG # # f - T, / REV / EOP # / 7d 5 /-/ REV _ d EOP WRITER M/M DATE _ d[/ SECTION I: ERG STEP ,YD Ccrresf;H N I M} E~ R G (VOTE SECTION II: EOP STEP NOTE e If all sources of RCP seal cooling flow have been lost, ' then the RCP seal is assumed to be hot. Recovery of No. I seal cooling is performed by Step 5. e Without instrument air available charging should be established using Attachment A. SECTION III: JUSTIFICATION brs I hv !/* ' Y MC IE "C5 iuc/ Je cl i ~ g 1 ea c/ o f ff G ye- A r JC,ae.. le el ci e e e ci e , c e m + ~ Y x , SGe e e ,v I / ,v v e m, 332 wenova  % Georgia Power Il894-C ..b f A8/pte .. **~ g V0GTLE ELECTRIC GENERATING PLANT 0 4/;3 '~ /a 9 '" COMMON UNIT Q4' OF ,If Q EOP STEP DOCUMENTATION FORM ERG # E/2 -1 / RIV / EOP $ / 7d f /-/ REV d E P "RITEa A/ /A on,g _ g/jyjg3 $"5Y,F:ICAT/cN b' # ' ./ ' ' SECTION IJ7 M p '\l N P des p~ c./ca s a e t , .e t / Je . S'r ccm pressac P'- e r e d f c c .x xfg /Eg& Pc- e - se ppl y, cfAm,7, va- ( v e s e e e, v . c , r ,, e_ , e syapyl  % d c e l' *r Nbesc c .p e r ed i o n , L c a ,e ,4 , -h s e,e =,duc +a u .. Possiut, -C = c ~ c~ t r c <. , + f 7 .: 5 9, , - ,s e a k e ) . '$ b c u Y Im p l e sliern,mi sw etLc d o+ etvcr /c b le, a n, '5 * *

s. s 4 , 6 1. s b , ~ 3 c h a ry i~ 5 's ' "

* ,' ' '- } 'af', y n,, m s, .o e .m ee k , < . ,v $ t/ c_ e h e su ,w b f 333 GeorgiaPower 'ti;'g _c .. :v.1 ksk -. - __ VOGTLE ELECTRIC GENERATING PLANT 0 nos e J/;3/gg UNIT COMMON 1 OF Ey

  • EOP STEP DOCUMENTATION FORM ERG # FN-[. f REV / EOP # [7d I /-/ REV h EOP WRITER h/A DATE ((/9[Yf W

i SECTION I: ERG STEP )/0 C0 f r R .5 j t3N '#) v c~ c" & ac p-1+ +. SECTION II: EOP STEP ,_ pme u.ea Cf E jm clV i 1  ? l / *v / //Gw c' l SECTION III: JUSTIFICATION - /v c / u d e d / \ Q f c, c i ni c, e n e r M c~ Y l a N 6 ^' CP E , j ^ 1 3eQ 3 S Tt f /cM/O W c W 6 fE I b e [o e e S to p 2, 33 Y ~ PROCEDURE NO. REVISION PAGE No. 19261-1 0 9 of 12 Sheet 1 of 3 g ATTACHMENT A ESTABLISHING CHARGING WITHOUT INSTRUMENT AIR A. Establish Charging With Both Train A And Train B Emergency Buses Energized:

1. Verify alternate miniflow isolation valves - OPEN:

e HV-8508A e HV-8508B

2. Verify one CCP - RUNNING.
3. Verify charging isolation valves - OPEN:

e HV-8105 e HV-8106

4. Verify BIT isolation valves - SHUT:

e HV-8801A e HV-8801B e HV-8803A f e HV-8803B

5. Dispatch local operators to do the following:
a. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
b. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
c. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO

',N d. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO fl SEAL: e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) --

  • 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)
e. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPAS5.

5

m. . ,

o. emoceDU;;a ND. REVISloN PAGE No. Sheet 2 of 3 ATTACHMENT A (Cont'd.) B. Establish Charging With Train A Emergency Bus Energized:

1. Verify Train A alternate miniflow isolation valve HV-8508A -

OPEN.

2. Verify Train A CCP - RUNNING.
3. Verify Train A charging isolation valve HV-8106 - OPEN.
4. Dispatch local operators to do the following:
a. Shut CCP discharge crosstie isolation valve HV-8438
b. Verify Train B charging isolation valve HV-8105 - OPEN
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

e 1208-U4-414(RCP #1) e 1208-U4-415(RCP #2) e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

J +m 334 - s ~ PnocEDURE NO. REVISloN PAGE No. .* l Sheet 3 of 3 l 1 . ATTACHNINT A (Cont'd.) i l 1 C. Establish Charging With Train B Emergency Bus Energized:

1. Verify Train B alternate miniflow isolation valve HV-8508B -

OPEN.

2. Verify Train B CCP - RUNNING.
3. Verify Train B charging isolation valve HV-8105 - OPEN.
4. Verify Train B BIT isolation valves - SHUT:

e HV-8801B e HV-8803B

5. Dispatch local operators to do the following:
a. Verify Train A BIT isolation valves - SHUT e HV-8801A e HV-8803A
b. Verify Train A charging isolation valve HV-8106 - SHUT
c. Open 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS
d. Shut 1208-U4-134 CVCS SEALS FLOW CONTROL HV-181 INLET ISO
e. Shut 1208-U4-135 CVCS SEALS FLOW CONTROL HV-181 OUTLET ISO
f. Adjust to obtain 8 to 13 gpm RCP SEAL INJ NEEDLE VLVS TO #1 SEAL:

i e 1208-U4-414(RCP #1) i e 1208-U4-415(RCP #2) ' e 1208-U4-416(RCP #3) e 1208-U4-417(RCP #4)

g. Adjust to obtain desired charging flow 1208-U4-136 CVCS SEALS FLOW CONTROL HV-181 BYPASS.

I l END OF ATTACHMENT A FC3445 337 < a -g . GeorgiaPbwer -- ., y.' 'o POWWI espeu?Wie spefmderf ll894-C .re VOGTLE ELECTRIC GENERATING PLANT 0" UNIT CfM40N 1 OF EOP STEP DOCUMENTATION FORM ERG $ - . REV EOP # 1' f REV O EOP WRITER A// DATE [{/i((f SECTION I: ERG STEP 3 Check if Charging Flow Has Been . Established:

a. Charging pums - AT LEAST ONE c. Perform the following:

RUNNING

1) E CCW flow to RCP thermal barriers is lost, THEN isolate seci injection to effected RCP before stcrting charging pump.
2) Start one chargis,g pump. - -
b. Instrument air to conteinment - b. Establish instrument air to ESTABLISHED contcinment.

. c. Charging flow - ESTABLISHED c. Este lisn m gpm c.1erging flow: - j , (Enter :,cnt specific means). l \ l 3N ( - - N 3 4 ,g. - --h.. h 4 p's.q 'q , V0GT1.E ELECTmc GENERATING PLANT 0 f/:8/ev.fg = = 2_ 3 - UNIT emu 2, op_.g_ c: . ~ ' .f EOP STEP DOCUMENTATION FORM ERG # F 1C C. 2.- REV [ EOP # / h 5 /~/ REV O EOP WRITER d/ /M DATE N/9bf . EO P SECTION IT 989 STEP

3. Check If Charging Flow Has ':

Been Established:

a. The following conditions a. Perform the following:

are satisfied: .,

1) IF ACCW flow to RCP e CCPs - AT LEAST ONE Usermal barrier is RUNNING. zero, THEN isolate seal ,

e RCP seal injection - inj ection to the ATLEASTgGPM: affected RCP before starting CCP.

2) Start one CCP.
b. Instrument air to b. Establish instrument air containment - to containment:

ESTABLISHED. l') Verify instrument air pressure normal. IF instrument air Wessure NOT normal, THEN start one air compressor by initiating 13710-1, SERVICE AIR SYSTEM,

2) Open instrument air to containment isolation valve HV-9378.

l

c. Charging flow - c. Establish (60) gpm l charging flow.

ESTABLISHED. ) , 1 j 43; ..p - . - _ _ _ _ _ . . . . . _ _ . . _ _ . - _ . _ . . . , . _ . . _ . _ _ _ _ _ _ _ _ _ m ._ .__ .- ._ m ~~- - GeorgiaPower ll894-C ** b f *k m en om.e mr o osa m e n  %* 0 om VOGTLE ELECTRIC GENERATING PLANT na,"3 f Yl*'8/0 % UNIT COMMON MF$3 - EOP STEP DOCUMENTATION FORM ERG # ff2 - [.1 REV / EOP # / d62 -/ REV O EOP WRITER h/d DATE , 8[/P[f[ 'STsPICATICN SECTION IJ7.* h p h i n c (v el e (( C j' S e c. f Ey p a ,a c[e el &e C cpera h r k ~ o - l* b e  % ,- in sveu twj n e1Ac el a/ c ~ } s r e e , f c r a y s,re e a 9 v. Y q ,, , q a Llis4iny in s 'I fr vde~ d. eU co-a.o ,~ m e+ ,~, ,~c I S ( 9 FWC1 - - - - _ _ _ _ _ _ ~ /}}