Discusses Info Meeting Held on 970609 at Region III Office. Ies Utilities Staff Presented Status of Spent Fuel Storage at Duane Arnold Energy Center,As Well as Options Being Considered for Future Storage.Handout Encl
ML20140G729
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/13/1997
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 9706170039
Download: ML20140G729 (8)


Text

_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ -

- s June 13, 1997 Mr. John F. Franz, Jr.

Vice President, Nuclear IES Utilities, Inc.

200 First Street SE P. O. Box 351 Cedar Rapids, lA 52406-0351

SUBJECT:

DUANE ARNOLD INFORMATION MEETING

Dear Mr. Franz:

This refers to the information meeting held at the U.S. Nuclear Regulatory Commission, Region 111 office on June 9,1997. During this meeting members of your staff presented the status of spent fuel storage at the Duane Arnold Energy Center, as well as options that are being considered for future storage. A handout (enclosed) was provided as reference n.aterial.

In accordance with Section 2.790 of the NRC's Rules of Practice," Part 2, Title 10, Code of Federal Regu!ations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.

We appreciate your cooperation in this matter. If you have any question, please contact Dr. Ross B. Landsman of my staff at (630) 8929-9609.

Sincerely, B. L. Jorgensen, Chief Decommissioning Branch

/s/B. L. Jorgensen, Chief Docket No. 50-331

Enclosure:

As stated cc w/ encl: L. Root, President and Chief Operating Officer G. Van Middlesworth, f

Plant Manager K. E. Peveler, Manager, Regulatory Performance Chairperson, Iowa Utilities Board bec w/ encl: PUBLIC (IE 01)

DOCUMENT NAME: A:\DUANE.LTR To receive a copy of this document, indicate in the box *C* = Copy without attach /enci"E" = Copy with ettsch/enci "N" = No copy OFFICE Rill _ c- Rlli g 6 Rlli _

L NAME GKNIsman:ib Jordpth[/ Jor[%en DATE 06/('/97 06/ /97 06/a/97 OFFICIAL RECORD COPY 9706170039 970613 PDR ADOCK 05000331 i f l,ffffffllfhllf lf

_m

_ , _ _ _ _ m _ . . . . _ . _ . . _ . _ , _ . _ _ . . _ . _ . __ . . . __ __ . ~ . _ _ _

    • "' % 4 UNITED STATES

+ Ig NUCLEAR REGULATORY COMMISSION

, S REGION til E 5 j

801 WARRENVILLE ROAD

\ / USLE. ILUNOIS 60532-4351 l June 13, 1997 Mr.' John F. Franz, Jr.

Vice President, Nuclear IES Utilities, Inc.

200 First Street SE P. O. Box 351 Cedar Rapids, IA 52406-0351 l

I

SUBJECT:

DUANE ARNOLD INFORMATION MEETING

Dear Mr. Franz:

This refers to the information meeting held at the U.S. Nuclear Regulatory Commission, Region lli office on June 9,1997. During this meeting members of your staff presented the status of spent fuel storage at the Duane Arnold Energy Center, as well as options that l are being considered for future storage. A handout (enclosed) was provided as reference l material.

In accordance with Section 2.790 of the NRC's Rules of Practice," Part 2, Title 10, Code

! of Federal Regulations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.

l We appreciate your cooperation in this matter. If you have any question, please contact

( Dr. Ross B. Landsman of my staff at (630) 8929-9609.  !

Sincerely, ND  ;

EK C U

j B.L.J g nsen, Chief Decommissioning Branch

Docket No. 50-331

Enclosure:

As stated cc w/ encl: L. Root, President and Chief Operating Officer G. Van Middlesworth, Plant Manager K. E. Peveler, Manager, Regulatory Performance Chairperson, Iowa Utilities Board f

1 a

f

~. -

. i l

l l

i j Additional Spent Fuel Storage i

AdditionalSpent FuelStorage at the Duane Arnold Energy Center f%ene Anvild Fwry Cenw Additional Spent Fuel Storage l

Objectivefor Meeting 1

1. Review the need for Additional Spent Fuel  !

Storage at the Duane Arnold Energy Center.

2. Understand NRC Perspectives and Concerns. .

i rh..n. Am,id rwe, reni,,

l I

Duane Arnold Energy Center June 9,1997

Additional Spent F:tel storage Mission Establish spent fuel storage capability that imposes no limitations on plant operation through end-of-license and optimizes decommissioning planning.

d tw.ne wu rwe,cene, i

Additional Spent Fuel Storage Current Spent FuelPoolStatus

  • 2411 Assembly Capacity 1400 Assembliesin Storage
  • Fuel Poolis Licensed for Additional Re-racks
  • Fuel Poolis Licensed for Consolidated Fuel
  • Full Core Discharge Capability Lost Sept. 2002

^

__ rw. . ~.u-,, cn..

i

\ Duane Arnold Energy Cinter June 9.1997 i

I i

l<  !

1 l l

l l

r.

Additional Spent Fuel Storage i

DAECStorac.e Rea.uirements I)AE,C

.. s - Fed pen fpaw and.Fatm.edNet. 5mme. R _ {

...--.u-I l

l .-

.!l l 'Mdl-" i lill  !

j tl J1L j="ii_..b.

e7'j IIi  ;

! .. A* ^

j

- _ " l *.,!"i i [jy6-

.Illlj' "'" , i l}W4l

.I 3 .. " -

%_.e,l: l 1 I

- e

., '=

l , ,

i, ; ,

ijr

. .i p.g.g j ' i \! j t

}ij  : I.....--,

l h(ji't) 1111111111111111111111 1

Duane Amold Fneryw center Additional Spent Fuel Storage Optionsfor AdditionalStorage Capa@

. Fuel Pool Re-Rack (temporary solution)

Rod Consolidation I

= Dry Storage

- Horizontal Storage Vertical Storage

  • Away From Reactor Storage i

l thane Arnold Fws, Center I

i t

l l

Duane Arnold Energy Center June 9. I997

I Additional Spent Fuel Storage ErgjectSchedule l

  • 1997 /1998
- Project Planning and Design 1998 /1999

- Canister / Cask Fabrication

- Site Evaluations 1999 /2000

- Facility Modifications Startup and Pre-Op Testing

- Cask Loading l

thinne Arnold Fnerve(' enter l

l Additional Spent Fuel Storage l Project Team l

. Dedicated and stable membership

  • Representative of NGD and Corporation Composite IES and Contractor
  • Management Ownership & Involvement

' Life Cycle' QA Involvement thesne Arnold Fwev Center d

1 Duane Arnold Energy Center June 9,1997

(

.. e - .. . - - _ .- - - -. _ . _- .-. -. . . _ . . _ . - -

l

t.
  • l l

Additional Spent Fuel Storage DAECIssues andModifications i

Cask Pit Cleanout l

Heavy Load Analysis for Rx Building l

  • Crane Upgrade to 125 ton SFP ISFSI Siting and Construction
  • Rail Spur Addition thane Arnold Energy Center Additional Spent Fuel Storage FoundationalPrincinals
  • Start the process early, anticipate delays
  • Assemble an interdisciplinary company team
  • Understand industry lessons learned a

Develop an integrated management plan

  • Contingency planning for the unexpected Establish open communication with regulators Develop comprehensive procedures Develop detailed procurement documents Provide substantial utility presence during cask fabrication activities Keep communities, regulators and media informed I

Ibane Arnold Faernv Center Duane Arnold Energy Center June 9,1997 1

m , .

1 ,

i i

I I Additional Spent Fuel Storage Summarv & Conclusions DAEC needs additional spent fuel storage l

capacity to continue operation to 2014

{

DOE acceptance date of SNF is uncertain Dry storage facilitates current need and ultiinate DAEC decommissioning w w En.,,, c ,

)

l I

I Duane Arnold Energy Center June 9,1997