ML20140G656
| ML20140G656 | |
| Person / Time | |
|---|---|
| Site: | Neely Research Reactor |
| Issue date: | 03/26/1986 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | Karam R Neely Research Reactor, ATLANTA, GA |
| References | |
| NUDOCS 8604030082 | |
| Download: ML20140G656 (3) | |
Text
_
PM Docket No. 50-160 Dr. Ratib A. Karam Neely Nuclear Research Center School of Nuclear Engineering and Health Physics Georgia Institute of Technology Atlanta, Georgia 30332
Dear Dr. Karam:
SUBJECT:
RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility, Robert Carter, as been changed. Mr. Carter can now be reached at (301) 492-8206.
Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251.
If neither Mr. Carter or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.
All correspondence should still be addressed as follows:
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attn: Document Control Desk Sincerely, yFA61ual filgued by Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc:
See next page DISTRIBUTION:
. Central, File 4
SSPD Reading PNoonan RCarter DTondi 2
HBerkow h
@:SSPD
- SSPD
- SSPD DPWRL-B SSPD DTondiM I HBe ibw
/
an:cw R
r 03/f/86 D3/)V86
/86 03/ @ /86 7
8604030002 860326 PDR ADOCM 05000160 P
pg
e Weh p
9 A
UNITED STATES D
NUCLEAR REGULATORY COMMISSION e
h WASHINGTON, D. C. 20555 4
\\*****/
MAR 2 61986 Docket No. 50-160 Dr. Ratib A. Karam Neely Nuclear Research Center School of Nuclear Engineering and Health Physics Georgia Institute of Technology Atlanta, Georgia 30332
Dear Dr. Karam:
SUBJECT:
RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility, Robert Carter, as been changed. Mr. Carter can now be reached at (301) 492-8206.
Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251.
If neither I
Mr. Carter or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.
All correspondence should still be addressed as follows:
U.S. Nuclear Regulatory Commission l
Washington, D.C.
20555 Attn: Document Control Desk Sincerely, e
l erbert N. Ber ow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page j
l, Georgia Institute of Technology Docket Nos. 50-160/276 cc: Office of Planning and Budget Room 615B 270 Washington Street, S. W.
Atlanta, Georgia 30334 Mayor of City of Atlanta l
Atlanta, Georgia 30301 Attorney General Law Department 132 Judicial Building Atlanta, Georgia 30334 i
l 1
J 1
i I
a l
- -