ML20140G134

From kanterella
Jump to navigation Jump to search
Repts Level of Onsite Property Damage Insurance for Plant. Coverage Provided by Ani/Maerp Nuclear Pool Under Arkwright- Boston Mfgs Mutual Insurance Policy N351 & ANI Policy 5046
ML20140G134
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/25/1986
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8604010278
Download: ML20140G134 (1)


Text

_

-D DA/RYLAND hh/M[ COOPERAT/VE

  • PO BOX 817
  • 2615 EAST AVE SO LACRO (608) 788-4000 JAMES W. TAYLOR March 25, 1986 Gensral Manager Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Provisional Operating License No. DPR-45 On-Site Property Damage Insurance

Reference:

(1) 10 CFR_Part 50, Section 50.54 (w) (4)

Dear Sir:

In accordance with the provisions of Reference 1, the following informa-tion is submitted for the purpose of reporting the level of on-site property damage insurance carried for the La Crosse Boiling Water Reactor (LACBWR) which is located at Genoa, Wisconsin.

The amount of primary insurance carried is $500 million. This coverage is provided by the ANI/MAERP Nuclear Pool under the Arkwright-Boston Manufac-turer's Mutual Insurance Company Policy No. N351 and the American Nuclear Insurer's Policy No. 5046.

the effective dates of the primary coverage are September 19, 1985 to September 19, 1986.

In accordance with NRC letter, Crutchfield to Linder, dated September 12, 1983, Docket No. 50-409, LS05-83-09-012, Dairyland was exempted from the excess property insurance requirements of 10 CFR 50.54 (w).

If additional information is required, please let us know.

Sincerely, JWT: res:dej cc:

H. Devine R. Mueller 8gf O. Hiestand E. Tremmel' J. Keppler i0 J. Saltzman J. Parkyn R. Shinshak PGL-5055 09