ML20140G114

From kanterella
Jump to navigation Jump to search
Discusses Staff Completion of Semiannual Plant Performance Review of Plant on 970310.No Changes or Trends in Performance Identified.Details of Insp Plan for Next 6 Months Encl
ML20140G114
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/21/1997
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Stanley H
COMMONWEALTH EDISON CO.
References
NUDOCS 9705060394
Download: ML20140G114 (3)


Text

l f?

l-f l

l s.

l i

! I l

[ Apnl 21,1997

Mr. H. G. Stanley Site Vice President Braidwood Station l

Commonwealth Edison Company RR #1, Box 84 Braceville,IL 60407

SUBJECT:

PLANT PERFORMANCE REVIEW (PPR) - BRAIDWOOD

Dear Mr. Stanley:

On March 10,1997, the NRC staff completed the semiannual Plant Performance Review (PPR) of Braidwood Nuclear Generating Station. The staff conducts these reviews for all l

operating nuclear power plants to develop an integrated understanding of safety i performance. The results are used by NRC management to facilitate planning and

! allocation of inspection resources. The PPR for Braidwood involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period November 1996 to March 1997. PPRs provide NRC management with a l current summary of licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee Performance (SALP) and senior management meeting (SMM) reviews.

l l During this review, no changes or trends in performance were identified that would I warrant modifying the overall NRC inspection program at the Braidwood Station. ll l This letter advises you of our planned inspection effort resulting from the Braidwood PPR l review. It is provided to minimize the resource impact on your staff and to allow for j scheduling conflicts and personnel availability to be resolved in advance of inspector arrival

~

l onsite. The enclosure details our inspection plan for the next six months. Also included in ,

the plan are NRC non-inspection activities. The rationale or basis for each inspection  !

outside the core inspection program is provided so that you are aware of the reason for j l emphasis in these program areas. Resident inspections are not listed due to their ongoing l and continuous nature.

l

\

h I

i 9705060394 970421 PDR I. i * '

G ADOCK 05000456

-- -y- --, y- . , - ,

O t

H. Stanley l

  • We willinform you of any changes to the inspection plan. If you have any questions, please contact me at 630/829-9631.

Sincerely,

/s/ R. D. Lanksbury Roger D. Lanksbury, Chief Reactor Projects Branch 3 Docket Nos. 50-456; 50-457 License Nos. NPF-72: NPF-77

Enclosure:

Inspection Plan '

cc w/ encl: T. J. Maiman, Senior Vice President Nuclear Operations Division i D. A. Sager, Vice President, Generation Support H. W. Keiser, Chief Nuclear Operating Officer T. Tulon, Station Manager T. Simpkin, Regulatory Assurance Supervisor

1. Johnson, Acting Nuclear Regulatory Services Manager Richard Hubbard Nathan Schloss, Economist Office of the Attorney General State Liaison Officer Chairman, Illinois Commerce l Commission  !

Document Control Desk-Licensing i Distribution Docket File w/ encl DRP w/enci l OC/LFDCB w/enci Rill PRR w/enci l PUBLIC IE-01 w/ encl CAA1 w/ encl (E-mail)

SRI Byron, Braidwood, Zion w/ encl Rill Enf Coordinator, w/enci i Project Mgr., NRR w/ encl A. B. Beach, w/enci l RAC1 (E-Mail) Deputy RA, w/ encl TSS w/ encl DRS (2) l t DOCUMENT NAME: G:\BRAl.lR\lNSPPLN4. BRA To aceive a copy of thle document, indicate in the bos *C* = Copy without attachment /enclosu,e *E' = Copy with attacht-ant /enclosu,e I *N* = No copy OFFICE Rill m 4 Rlli f Rlll r Rlli f l NAME JCreifthoh aglfge RGardneph% 4 /r/ TTongue Mt//p JLennartzyg $ MRing#' [d)

TKozak JGavula 76# y/ y RLanksburyMf_

DATE 04/s4/97 04/lq/97 04//6 /97 V 04/>(/97 OFFICIAL RECORD COPY

ENCLOSURE BRAIDWOOD INSPECTION / ACTIVITY PLAN IP - Inspection Procedure T1 - Temporary Instruction Core inspection - Minimum NRC Inspection Program (mandatory all plants)

INSPECTION / TITLE / IWMBER OF PLANNED TYPE OF INSPECTION / ACTIVITY-ACTIVITY PROGRAM AREA NRC DATES COMMENTS  ;

INSPECTORS /

INDIVIDUALS IP 73753 Inservice inspection 1 03/29/97- Core Inspection 05/22/97 Steam Generator Inspection IP 83750 Occupational Radiation 1 04/17-30/97 Core inspection Exposure IP 86750 Radioactive Waste Processing 1 06/23-27/97 Core inspection  ;

Tl 2515-133 Implementation of Revised 49 Transportation of Radioactive I CFR Parts 100-179 and 10 Materials ,

CFR Part 71 N/A Operational Safeguards 7 07/14-17/97 Safeguards Team Evaluation Response Evaluation ,

IP 71001 Licensed Operator Requal 2 08/11-15/97 Core Inspection Training IP 87100 Security 1 09/22-26/97 Core inspection IP 83750 Occupational Radiation 1-2 10/27-31/97 Core Inspection Exposure N/A initial Licensed Operator 3 10/06-10/97 Examinations