DISTRIB M N WM s/f (48 WMGT r/
NMSS R/F MAR 2 01986 REBrowning
.M/86/03/-19 MBell JBunting PJustus TJohnson r/f PDR MEMORANDUM FOR:
E. Hawkins, URF0 FROM:
T. Johnson, WMGT
SUBJECT:
TELECON WITH MORRISON-KNUDSEN REGARDING BOD 0 CANYON PRELIMINARY DESIGN By letter dated March 4, 1986, Morrison-Knudsen Co. (M-K) requested my comments on a conceptual, preliminary design for the Bodo Canyon (Durango) remedial action plan. M-K submitted several preliminary drawings for review, prior to finalizing the design later this month.
In accordance with the request, I called Fred Feliz on March 19, 1986 to discuss my preliminary comments on the design concept. During our conversation, I made the following points:
1.
I indicated that it was doubtful that the propnsed apron (with a D 50 rock size of only 6") was adequate to handle the combined flows from off the pile and from the diversion ditches.
2.
I indicated that the erosion protection (D of only l'_2') for the 50 channel to the north of the site was probably not adequate, due to the existing steep channel slopes. WM Record file WM Project N DocketNo.
PDR V LPDR.
Distr $ution:
~
l
__ J (Return to WM,623-SS)
)FC :WNGT L___
8603310372 860320
~
((_4g"*
AME :TJohnson PDR
_m.________
$TE :86/03/
TJ/86/03/19 2-t 3.
I indicated that the ditch or apron termination point should have rock which should.be placed at least to the deoth.of the existing gully.
I also indicated that the. ditch could probably be shortened somewhat, if this was done.
4.
I indicated that I was concerned about the berms and the fill that will be placed in the existing gullies and arroyos.
I suggested that this fill showed be protected by a rock layer to prevent future gully formation.
M-K indicated that these suggestions were much appreciated and would be taken under advisement during the development of the final plan. M-X indicated that they expected to make further revisions to this plan, based on the results of a meeting that was held in San Francisco on March 17, with the TAC.
\\