ML20140F315

From kanterella
Jump to navigation Jump to search
Requests Review of Encl Documents Recently Received from Bwip & Submission of Comments in Single or Set of Ltr Repts. Effort Should Require Less than 3.5 Wks of Person Effort
ML20140F315
Person / Time
Issue date: 06/10/1985
From: Matthew Gordon
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Robert Williams
WILLIAMS & ASSOCIATES
References
CON-FIN-B-7372, CON-NRC-02-82-044, CON-NRC-2-82-44, REF-WM-10 2162, NUDOCS 8507120002
Download: ML20140F315 (2)


Text

w+cs

%'.1 Rccm hb Mi Prchd./a---

istributhn: 425.1-S-7222 _.

D d d No.

M sf QBZ37 h N)>$

PD3 <

WMGT vf

~

~

JUN 101985 LKR /S 34^6.1@/MG/85/06/07~Oktr6uhca:

NMSS rf RBrowning

~ - " ][ ]

]

MBel1

-1 JBunting (Ron !o E.1,622 SS)

MKnapp

~~

MFliegel MGordon & rf Dr. Roy E. Williams PDR WiMiams & Associates LPDR(B)

P.O. Box 48 Viola, ID 83872 EDavis, PPAS For enclosures: see DCC

Dear Dr. Williams:

Enclosed please find the following documents recently received from BWIP:

1.

SD-BWI.TC-023: Drilling and Completion Specification for Boreholes RRL-2B and RRL-2C, 2/85 (2 copies).

2.

SD-BWI-DP-059: Water Level,... DC-19, DC-20, DC-22, December 1 -

December 31, 1984, 2/85 (2 copies).

3.

SD-BWI-TP-)39:

Integrity Testing Plans...,1/85 (2 copies).

4.

RH0-BW-SA-364 P: Stochastic Groundwater Flow Modeling using the Second Order Method 3/84.

5.

RH0_BW-SA-366P: Stochastic Groundwater Flow Modeling using a Monte Carlo Technique, 3/84.

6.

RH0-BW-SR-84-1-4QP: BWIP D ar.d T Quarterly Report, October 1, 1984 through December 31, 1984, 1/85.

7.

RH0-BW-SA-372P: CL Isotopes..., 3/85 8.

RH0-BW-SA-370P: A Field Test to Assess Effects of Drilling Fluids on Groundwater Chemistry..., 3/84 Please review each of these documents and submit your comments to me in a single or set of letter report (s). This effort should require less than 3.5 weeks of person effort. The order in which these documents are listed above roughly indicates the priority to be assigned to these reviews.

Last week you were sent a set of documents received from Mike Thompson during the May 1985 Hydrology Workshop. Please scan these documents and telephone me within a week of your receipt of this letter to discuss a strategy for review of these documents.

The action taken by this letter is considered to be within the scope of the 0507120002 850610 1

PDR WMREG EECWILA

)FC

WMGT b 7372 PDR p____:....._______:__..________:..__________:_________.__:..._________:..__________:___________

VAME :MGordon L.__.:_____.......:.__________.:___________.::._____.....::.______...__::___._______.:..

) ATE :85/06/

cS/b $.-

3426.1/B7372/MG/85/06/07

-2 current contract NRC.02-82-044. No changes to cost or delivery of contracted services and products are authorized. Please notify me imediately if you believe that this letter would result in changes to cost or delivery of contracted products.

Sincerely, b

Matthew Gordon, Project Officer Geotechnical Branch Division of Waste Management Office of Nuclear Material Safe +.y and Safeguards Erclosures:

As Stated I

)FC !WMGT IAME :MGordon MTE :85/06/[D

-